← Back
Three families
3231 CORLEAR AVENUE
BRONX · BIN 2083617
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R4Zoning
3,350 sfGross Floor Area
3Units
Three families · Owner of record: 3231 CORLEAR NNG REALTY LLC · 2,500 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3231 CORLEAR NNG REALTY203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2025$900K—Private party → 3231 CORLEAR NNG REALTY LLC$269/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS104/02/2026
JIAN ENGINEERING PLLC110/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDEAL203/21/2026
Building Lifecycle
All (21)Filed (2)Objection (13)Special Inspection (6)
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/20/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Inspections
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Scope
04/17/2026
Objection resolved — Resolved
04/02/2026
Filed — Alteration
HEREWITH FILED ALTERATION FOR GUT RENOVATION OF EXISTING 2 STORY WITH CELLAR 3 FAMILY DWELLING. NO CHANGE TO USE OR OCCUPANCY
X01381613-I1
04/01/2026
Special inspection requirement — Final
12/08/2025
Objection raised — Structural
12/08/2025
Objection raised — Other
12/08/2025
Objection raised — Admin
11/10/2025
Objection raised — Zoning
11/10/2025
Objection raised — Scope
10/27/2025
Filed — Alteration
bath
X01298118-I1
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/06/2025
Special inspection requirement — Mechanical Systems
10/06/2025
Special inspection requirement — Final
Nothing on file for this building.
1 job · most recent 10/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/27/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin ×12
Ventilation
1 job · most recent 10/01/2025
General Wiring
FiledStatusContractorScope
10/01/2025Permit IssuedKET ELECTRIC LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/21/2026Fire-Resistant Penetrations and Joints—special
05/21/2026Fire-Resistance Rated Construction—progress
04/01/2026Final—progress
10/27/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/06/2025Mechanical Systems—special
10/06/2025Final—progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026X01381613-I1Request digital key ↗
08/15/2026X01298118-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026X01298118-I1Open ↗
08/17/2026X01381613-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026X01298118-I1Open ↗