DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
ECB01/23/2025FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 20000071665N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO$3K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB07/26/1990V-DOB VIOLATION - ACTIVE
ECB06/24/1991OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT PERMIT.BSMT. ARRANGED TO BE OCCUPIED BY MORE THAN 75 PEOPLE AT TIME OF INSPECTION GRADUSTION CEREMONY IN PROGRESS.REMEDY:OBTAIN P.A.PERMIT OR DISCONT.Nothing owed — awaiting certificate of correction
ECB06/07/1989FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY: PROVIDE PA PLANS AND POST SIGN FOR INSPECTION.Nothing owed — awaiting certificate of correction