← Back
Three families
3003 OLINVILLE AVENUE
BRONX · BIN 2087289
💬 Discuss this project
1987Year Built
3Stories
C0Building Class
R6Zoning
3,432 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸
Three families · 2,100 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 7 docs
Floor 41p · 1 filing · 14 docs
Floor 33p · 2 filings · 20 docs
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
Nothing on file for this building.
Building Lifecycle
All (39)Filed (2)Permit Issued (2)Violation (18)Objection (2)Special Inspection (15)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/25/2024
Filed — Alteration
X01143575-I1
11/25/2024
Violation issued (HPD, open)
I
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
11/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
11/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
04/03/2024
Violation issued (HPD, open)
A
01/26/2024
Permit issued — General Construction
X00934515-I1-GC
11/16/2023
Violation issued (HPD, open)
I
11/06/2023
Permit issued — General Construction
X00934515-I1-GC
10/25/2023
Objection resolved — Addressed
10/11/2023
Objection raised — Scope
10/05/2023
Filed — Alteration
Application being filed to repair water/fire damaged interiors as per plans submitted due to fire ignition. No change to use, egress or occupancy.
X00934515-I1
09/15/2023
Special inspection requirement — Energy Code Compliance Inspections
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Air barrier - visual inspection
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Fenestration air leakage
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Fenestration areas
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Insulation placement and R values
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Wood – Seismic Resistance
GABY TCHILINGUIRIAN
09/15/2023
Special inspection requirement — Final
GABY TCHILINGUIRIAN
03/17/2023
Violation issued (HPD, open)
A
11/04/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
I
10/28/2019
Violation issued (HPD, open)
I
10/11/2018
Violation issued (HPD, open)
I
11/14/2017
Violation issued (HPD, open)
I
10/31/2016
Violation issued (HPD, open)
I
10/05/2015
Violation issued (HPD, open)
I
02/04/2015
Violation issued (HPD, open)
I
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRUDIGM ENGINEERING LLC111/25/2024
GABY TCHILINGUIRIAN R.A.110/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IFLOODED SERVICES INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304111/25/2024
GABY TCHILINGUIRIAN R.A.2540110/05/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIFLOODED SERVICES01/26/2024
DOB NOWGeneral ConstructionPermit IssuedIFLOODED SERVICES11/06/2023
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/18/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
11/18/2024Energy Code Compliance InspectionsNaeem Anwarprogress
11/18/2024HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
11/18/2024HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
09/15/2023Energy Code Compliance InspectionsGABY TCHILINGUIRIANprogress
09/15/2023Fire-Resistance Rated ConstructionGABY TCHILINGUIRIANprogress
09/15/2023Air barrier - visual inspectionGABY TCHILINGUIRIANenergy_progress
09/15/2023Structural Stability – Alterations of existing buildingsGABY TCHILINGUIRIANspecial
09/15/2023Fenestration air leakageGABY TCHILINGUIRIANenergy_progress
09/15/2023Fenestration areasGABY TCHILINGUIRIANenergy_progress
09/15/2023Fenestration and door U-factor and product ratingsGABY TCHILINGUIRIANenergy_progress
09/15/2023Insulation placement and R valuesGABY TCHILINGUIRIANenergy_progress
09/15/2023Fire-Resistant Penetrations and JointsGABY TCHILINGUIRIANspecial
09/15/2023Wood – Seismic ResistanceGABY TCHILINGUIRIANspecial
09/15/2023FinalGABY TCHILINGUIRIANprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026X00934515-I1Request digital key ↗
08/20/2026X01143575-P1Request digital key ↗
08/20/2026X01143575-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X01143575-I1Open ↗
09/01/2026X01143575-I1Open ↗
09/01/2026X01143575-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026X00934515-I1Open ↗
08/20/2026X01143575-I1Open ↗
08/13/2026X01143575-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01143575-I1Open ↗
08/30/2026X01143575-P1Open ↗
08/25/2026X00934515-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026X00934515-I1Open ↗
08/20/2026X01143575-I1Open ↗
08/13/2026X01143575-P1Open ↗