Condo, residential unit in 1-3 story building
Clearview Manor Condominium
180 DAVIS AVENUE · BIN 2090596
💬 Discuss this project
1996Year Built
—Stories
R3Building Class
R3-2Zoning
20,172 sfGross Floor Area
22Units
Rent Stabilized55 Open Violations ▸
Condo, residential unit in 1-3 story building · 30,886 sf lot · 0.65 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIBRETT REAL ESTATE GROUP207/08/2026
VERITAS PROPERTY MGMT403/22/2026
CLEARVIEW MANOR CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB101/21/2025
RAMIREZ ENGINEERING PLLC101/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.V. SON CONSTRUCTION INCGeneral Contractor104/08/2026
J & R CONTRACTORS SERVICEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189101/21/2025
RAMIREZ ENGINEERING PLLC8679101/08/2025
Building Lifecycle
All (86)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Objection (14)Special Inspection (6)
06/12/2026
Signed off — Alteration
Installation of temporary shoring under concrete slab, at exterior stairwell concrete hallway. Installation of lally columns under concrete deck at buildings 1 & 2. To resolved violations 39125468H & VIO24-02574.
X01162803-I1
06/10/2026
Permit issued — Structural
X01162803-I1-ST
06/09/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
C
03/29/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
B
03/29/2026
Violation issued (HPD, open)
C
10/06/2025
Signed off — Alteration
CONCRETE REPLACEMENT ON BALCONY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
X01167771-I1
08/27/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
C
08/27/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
A
05/20/2025
Permit issued — General Construction
X01167771-I1-GC
02/03/2025
Violation issued (HPD, open)
C
02/03/2025
Violation issued (HPD, open)
B
02/03/2025
Violation issued (HPD, open)
B
02/03/2025
Violation issued (HPD, open)
C
02/03/2025
Violation issued (HPD, closed)
C
02/03/2025
Violation issued (HPD, open)
C
02/03/2025
Violation issued (HPD, open)
B
01/21/2025
Filed — Alteration
CONCRETE REPLACEMENT ON BALCONY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
X01167771-I1
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Objection resolved — Addressed
01/19/2025
Special inspection requirement — Post-installed Anchors
Amauris Ramirez
01/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Amauris Ramirez
01/15/2025
Objection raised — Structural
01/15/2025
Objection raised — Structural
01/15/2025
Objection raised — Structural
01/15/2025
Objection raised — Structural
01/15/2025
Objection raised — Admin
01/15/2025
Objection raised — Admin
01/15/2025
Objection raised — Structural
01/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN T. O'CONNOR
01/15/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
01/08/2025
Filed — Alteration
Installation of temporary shoring under concrete slab, at exterior stairwell concrete hallway. Installation of lally columns under concrete deck at buildings 1 & 2. To resolved violations 39125468H & VIO24-02574.
X01162803-I1
01/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Amauris Ramirez
01/04/2025
Special inspection requirement — Final
Amauris Ramirez
11/25/2024
Violation issued (HPD, closed)
I
09/21/2024
Violation issued (ECB, closed)
Construction
09/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/21/2024
Violation issued (ECB, open)
Construction
09/20/2024
Violation issued (HPD, open)
C
09/20/2024
Violation issued (HPD, closed)
C
09/20/2024
Violation issued (HPD, closed)
C
09/20/2024
Violation issued (HPD, closed)
C
09/20/2024
Violation issued (HPD, open)
A
09/20/2024
Violation issued (HPD, open)
A
09/20/2024
Violation issued (HPD, open)
B
09/20/2024
Violation issued (HPD, open)
A
09/20/2024
Violation issued (HPD, open)
B
09/20/2024
Violation issued (HPD, open)
A
09/20/2024
Violation issued (HPD, open)
C
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJ & R CONTRACTORS SERVICE06/10/2026
DOB NOWGeneral ConstructionSigned-offA.V. SON CONSTRUCTION INC05/20/2025
1 project · most recent 08/06/2026
HVAC Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedALL BALANCED ELECTRICAL INC.HVAC Wiring
1 project · most recent 01/08/2025
FiledStatusContractorScope
01/08/2025Signed-offJ & R CONTRACTORS SERVICE1 scope_items
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/19/2025Post-installed AnchorsAmauris Ramirezspecial
01/19/2025Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
01/15/2025Tenant Protection Plan ComplianceBRIAN T. O'CONNORspecial
01/15/2025FinalTREVOR O. FLOWERSprogress
01/08/2025Tenant Protection Plan ComplianceAmauris Ramirezspecial
01/04/2025FinalAmauris Ramirezprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01162803-I1Request digital key ↗
08/20/2026X01167771-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X01167771-I1Open ↗
09/02/2026X01162803-I1Open ↗
09/02/2026X01162803-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X01167771-I1Open ↗
08/13/2026X01162803-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X01167771-I1Open ↗
09/02/2026X01162803-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01167771-I1Open ↗