← Back
Elevator apt, semi-fireproof without stores
428 EAST 137 STREET
BRONX · BIN 2091011
💬 Discuss this project
1972Year Built
6Stories
D1Building Class
R6Zoning
131,490 sfGross Floor Area
107Units
LL97 CoveredRent Stabilized19 Open Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: SOUTH BRONX HOUSING DEVELOPMENT FUND CO. INC. · 28,850 sf lot · 4.56 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 6 docs
1 job · most recent 08/28/2025
FiledStatusContractorScope
08/28/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 job · most recent 07/15/2026
Steel Masonry
FiledStatusContractorScope
07/15/2026——Steel, Masonry
1 job · most recent 08/28/2025
Sidewalk Shed
FiledStatusContractorScope
08/28/2025Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
2 jobs · most recent 10/16/2025
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/16/2025Permit IssuedMASPETH CONTRACTING CORPSuspended Scaffold
08/13/2025Signed-offMASPETH CONTRACTING CORPTenant Protection Plan 72 Hour
1 job · most recent 10/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/16/2025Permit IssuedMASPETH CONTRACTING CORPSuspended Scaffold (SC)
Building Lifecycle
All (74)Filed (5)Permit Issued (3)Signed Off (2)Facade (FISP) (6)Violation (45)Objection (2)Special Inspection (11)
07/15/2026
Filed — Alteration
REPAIR OF DETERIORATED ELEVATOR SHAFT AND RE-SUPPORT OF EXISTING ELEVATOR RAILS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01410309-I1
06/25/2026
Signed off — Alteration
MASONRY RESTORATION, WATERPROOFING INSTALLATION, MASONRY REPAIR, AT EXTERIOR ENVELOPE AT ALL BUILDING ELEVATIONS AS PER PLANS FILE DHEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01252330-I1
06/01/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ERIC BERLENT
06/01/2026
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
06/01/2026
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
06/01/2026
Special inspection requirement — Masonry
asghar Ghodsi
06/01/2026
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
06/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
06/01/2026
Special inspection requirement — Final
ERIC BERLENT
05/01/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01277684-I1
10/16/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
X01288820-P1
10/03/2025
Permit issued — Suspended Scaffold
X01288820-I1-SC
10/03/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Structural
09/29/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
X01288820-I1
09/18/2025
Permit issued — General Construction
X01252330-I1-GC
09/02/2025
Permit issued — Sidewalk Shed
X01277684-I1-SH
08/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01277684-I1
08/13/2025
Filed — Alteration
MASONRY RESTORATION, WATERPROOFING INSTALLATION, MASONRY REPAIR, AT EXTERIOR ENVELOPE AT ALL BUILDING ELEVATIONS AS PER PLANS FILE DHEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01252330-I1
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
07/08/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/08/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/08/2025
Special inspection requirement — Final
Craig Tooman
08/31/2023
Cycle 9 facade report signed — SWARMP
07/25/2023
Cycle 9 facade report submitted
05/31/2023
Cycle 9 facade inspection completed
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2019
Violation issued (HPD, closed)
I
01/29/2018
Violation issued (ECB, closed)
Elevators
10/02/2017
Violation issued (HPD, closed)
B
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2015
Cycle 8 facade report submitted
06/09/2015
Cycle 8 facade report signed — SAFE
06/04/2015
Cycle 8 facade inspection completed
03/05/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2013
Violation issued (ECB, closed)
Construction
12/29/2011
Violation issued (ECB, closed)
Elevators
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2007
Violation issued (ECB, closed)
Construction
05/21/2007
Violation issued (ECB, closed)
Construction
01/18/2007
Violation issued (ECB, closed)
Elevators
12/20/2006
Violation issued (ECB, closed)
Elevators
Latest 60 of 74 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WAVECREST MANAGEMENT907/08/2026
SOUTH BRONX HOUSING DEVEL303/22/2026
NYC HOUSING DEVELOP103/22/2026
SOUTH BRONX CHURCH103/22/2026
RESIDENTIAL MGMT ASSOC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CUONO ENGINEERING PLLC107/15/2026
ALWAYS FAST SERVICES CORP108/28/2025
CTA ARCHITECTS P.C.108/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
MASPETH CONTRACTING CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOGRAPHIC CO1579107/15/2026
CATALPA SPECIAL INSPECTIO2004207/15/2026
METRIC CONSULTING AND INS1803108/13/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMASPETH CONTRACTING CORP10/03/2025
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP09/18/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/02/2025
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/13/2013
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/07/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT01/05/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT04/29/2011
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/01/2026Mastic and Intumescent Fire-resistant CoatingsERIC BERLENTspecial
06/01/2026Post-installed Anchorsasghar Ghodsispecial
06/01/2026Structural Steel - Weldingasghar Ghodsispecial
06/01/2026Masonryasghar Ghodsispecial
06/01/2026Structural Steel - Detailsasghar Ghodsispecial
06/01/2026Tenant Protection Plan ComplianceERIC BERLENTspecial
06/01/2026FinalERIC BERLENTprogress
07/08/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
07/08/2025MasonrySAMI HAJJAR P.Especial
07/08/2025Post-installed AnchorsSAMI HAJJAR P.Especial
07/08/2025FinalCraig Toomanprogress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026X01252330-I1Request digital key ↗
08/18/2026X01277684-I1Request digital key ↗
08/18/2026X01288820-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
11/21/2013220114597Open ↗
11/09/2012220114597Open ↗
01/06/2012220114597Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
04/22/2014220114597Open ↗
04/28/2011220114597Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/22/2014220114597Open ↗
04/22/2014220114597Open ↗
02/04/2014220114597Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026X01252330-I1Open ↗
08/27/2026X01252330-I1Open ↗
08/27/2026X01252330-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026X01252330-I1Open ↗
08/16/2026X01410309-I1Open ↗
08/13/2026X01277684-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/22/2014220114597Open ↗
04/28/2011220114597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/22/2014220114597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/28/2011220114597Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026X01252330-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01252330-I1Open ↗
08/16/2026X01410309-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/28/2011220114597Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/22/2014220114597Open ↗
02/04/2014220114597Open ↗
11/09/2012220114597Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/25/2014220114597Open ↗
04/25/2014220114597Open ↗
02/04/2014220114597Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/16/2026X01410309-I1Open ↗
08/13/2026X01277684-I1Open ↗
▸BISSHED LETTER1
01/06/2012220114597Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/28/2011220114597Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
04/28/2011220114597Open ↗
▸BISADDITIONAL INFORMATION1
04/22/2014220114597Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026X01288820-P1Open ↗
08/13/2026X01288820-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01288820-P1Open ↗
08/13/2026X01288820-I1Open ↗