← Back
Primarily 4 family with 1 store or office
4030 EAST TREMONT AVENUE
BRONX · BIN 2091490
💬 Discuss this project
1931Year Built
2Stories
S4Building Class
R3AZoning
4,042 sfGross Floor Area
5Units
0 Open Violations
Primarily 4 family with 1 store or office · 5,000 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Cellar8p · 2 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TL ENGINEERING, PC609/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLBG AND HTG INCPlumbing407/08/2026
Building Lifecycle
All (28)Filed (6)Permit Issued (3)Violation (15)Inspection (4)
10/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/08/2025
Permit issued — Boiler Equipment
X01232253-S1-BE
09/04/2025
Filed — Alteration
TWO(2) NEW BOILER INSTALLATIONS AT CELLAR FOR EXISTING MULTI-FAMILY HOUSES. RELATED BOILER JOB # X01014071-I1 AND PLUMBING JOB #X01014071-S1. THIS FILING IS TO CORRECT A PREVIOUS BOILER FILING (X01014071-I1) FOR BOILER INSTALLATION.
X01232253-S1
06/04/2025
Permit issued — Boiler Equipment
X01232253-I1-BE
06/02/2025
Filed — Alteration
TWO(2) NEW BOILER INSTALLATIONS AT CELLAR FOR EXISTING MULTI-FAMILY HOUSES. RELATED BOILER JOB # X01014071-I1 AND PLUMBING JOB #X01014071-S1. THIS FILING IS TO CORRECT A PREVIOUS BOILER FILING (X01014071-I1) FOR BOILER INSTALLATION.
X01232253-I1
03/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2025
Filed — Alteration
BOILER REPLACEMENT AT CELLAR FOR EXISTING MIXED USE BUILDING.(OIL BOILER TO GAS BOILER)
X01014071-P1
02/13/2025
Filed — Alteration
BOILER REPLACEMENT AT CELLAR FOR EXISTING MIXED USE BUILDING.(OIL BOILER TO GAS BOILER)
X01014071-P2
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/23/2024
Permit issued — Plumbing
X01014071-S1-PL
04/03/2024
Filed — Alteration
BOILER REPLACEMENT AT CELLAR FOR EXISTING MIXED USE BUILDING.(OIL BOILER TO GAS BOILER)
X01014071-S1
04/03/2024
Filed — Alteration
BOILER REPLACEMENT AT CELLAR FOR EXISTING MIXED USE BUILDING.(OIL BOILER TO GAS BOILER)
X01014071-I1
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2005
Violation issued (ECB, closed)
Boilers
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offXH&RC PLBG AND HTG INC10/08/2025
DOB NOWBoiler EquipmentSigned-offXH&RC PLBG AND HTG INC06/04/2025
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC04/23/2024
BISBLISSUEDEAST COAST PETROLEUM04/19/2005
1 project · most recent 02/13/2025
Gas
FiledStatusContractorScope
02/13/2025Permit IssuedXH&RC PLBG AND HTG INCGas
1 project · most recent 04/15/2024
FiledStatusContractorScope
04/15/2024Permit IssuedUNITED ELEC'L CONT'G CORP4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026X01014071-I1Request digital key ↗
08/20/2026X01014071-P1Request digital key ↗
08/20/2026X01014071-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026X01014071-S1Open ↗
08/20/2026X01014071-I1Open ↗
08/20/2026X01014071-P2Open ↗
Showing 3 of 6 on file for this type