← Back
Elevator cooperative
1760 BRUCKNER BOULEVARD
BRONX · BIN 2092763
💬 Discuss this project
1958Year Built
15Stories
D4Building Class
R6Zoning
361,452 sfGross Floor Area
408Units
LL97 CoveredRent Stabilized53 Open Violations 51 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator cooperative · 350,840 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION1009/15/2026
RELIABLE ENTERPRISES707/08/2026
ROSEDALE GARDENS1503/22/2026
ROSEDALE GARDENS CO-OPS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING212/01/2025
DEVON ARCHITECTS101/17/2024
MJE PROFESSIONAL SERVICES108/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor509/15/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
ANASTASIOS MATSIKASElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEVON ARCHITECTS356101/17/2024
Building Lifecycle
All (92)Filed (4)Permit Issued (7)Signed Off (1)Facade (FISP) (15)Violation (60)Special Inspection (5)
09/14/2026
Permit issued — Sidewalk Shed
X01034610-I1-SH
06/16/2026
Permit issued — Sidewalk Shed
X01034610-I1-SH
03/17/2026
Permit issued — Sidewalk Shed
X01034610-I1-SH
01/23/2026
Cycle 9 facade report submitted
01/16/2026
Cycle 9 facade report signed — UNSAFE
01/09/2026
Cycle 9 facade inspection completed
12/01/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES,CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01034610-P1
10/15/2025
Permit issued — Sidewalk Shed
X01034610-I1-SH
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00918843-I1
06/23/2025
Violation issued (HPD, closed)
C
02/13/2025
Violation issued (HPD, closed)
B
02/13/2025
Violation issued (HPD, closed)
C
02/13/2025
Violation issued (HPD, closed)
C
02/13/2025
Violation issued (HPD, closed)
C
02/13/2025
Violation issued (HPD, closed)
C
01/10/2025
Violation issued (HPD, closed)
I
01/03/2025
Violation issued (HPD, closed)
C
12/13/2024
Violation issued (HPD, open)
B
12/13/2024
Violation issued (HPD, open)
B
12/13/2024
Violation issued (HPD, closed)
C
12/13/2024
Violation issued (HPD, open)
B
12/13/2024
Violation issued (HPD, open)
B
12/13/2024
Violation issued (HPD, closed)
C
05/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/12/2024
Permit issued — Sidewalk Shed
X01034610-I1-SH
04/11/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES,CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01034610-I1
04/03/2024
Violation issued (ECB, closed)
Construction
03/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/14/2024
Violation issued (ECB, open)
Construction
01/25/2024
Cycle 9 facade report submitted
01/25/2024
Cycle 9 facade report signed — UNSAFE
01/25/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/18/2024
Cycle 9 facade inspection completed
01/17/2024
Filed — Alteration
Work includes replacement of brick panels at various location at all facades.
X00935986-I1
01/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
STEVE LANE
12/26/2023
Violation issued (ECB, open)
Construction
12/26/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/05/2023
Permit issued — Sidewalk Shed
X00918843-I1-SH
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEVE LANE
09/19/2023
Special inspection requirement — Masonry
STEVE LANE
09/19/2023
Special inspection requirement — Final
STEVE LANE
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
STEVE LANE
08/16/2023
Permit issued — Sidewalk Shed
X00918843-I1-SH
08/15/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00918843-I1
09/30/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
C
04/02/2021
Violation issued (HPD, closed)
A
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2020
Violation issued (ECB, closed)
Elevators
12/08/2020
Violation issued (ECB, closed)
Elevators
06/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2019
Violation issued (HPD, closed)
A
05/15/2019
Violation issued (HPD, closed)
A
05/15/2019
Violation issued (HPD, closed)
B
05/15/2019
Violation issued (HPD, closed)
B
05/15/2019
Violation issued (HPD, closed)
A
05/15/2019
Violation issued (HPD, closed)
B
05/15/2019
Violation issued (HPD, closed)
B
05/05/2019
Violation issued (HPD, closed)
B
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP09/14/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP06/16/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP03/17/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP10/15/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP04/12/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/05/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC08/16/2023
BISOTISSUEDFUTURA BUILDERS GROUP INC.05/19/2011
BISOTISSUEDFUTURA BUILDERS GROUP INC.04/21/2011
BISOTISSUEDFUTURA BUILDERS GROUP INC.04/27/2009
BISOTISSUEDFUTURA BUILDERS GROUP INC.06/06/2006
BISEQISSUEDM.S.S. CONSTRUCTION CORP.05/30/2006
BISSPISSUEDNEW MYSTY CROW PLUMBING&HEATING10/20/1992
BISOTISSUEDROBERT L. TEITELBAUM INC.06/16/1992
2 projects · most recent 04/12/2024
FiledStatusContractorScope
04/12/2024Permit IssuedTOWER ELECTRIC INC.—
08/16/2023Permit IssuedRICHARD NEU—
1 project · most recent 12/01/2025
Sidewalk Shed
FiledStatusContractorScope
12/01/2025Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/07/2024Tenant Protection Plan ComplianceSTEVE LANEspecial
09/19/2023Structural Stability – Alterations of existing buildingsSTEVE LANEspecial
09/19/2023MasonrySTEVE LANEspecial
09/19/2023FinalSTEVE LANEprogress
09/19/2023Energy Code Compliance InspectionsSTEVE LANEprogress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026X00918843-I1Request digital key ↗
08/21/2026X00935986-I1Request digital key ↗
08/17/2026X01034610-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
04/21/2011220091709Open ↗
09/15/2010220080579Open ↗
04/27/2009220002912Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/18/2012220091709Open ↗
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026X00918843-I1Open ↗
08/21/2026X00935986-I1Open ↗
08/17/2026X01034610-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026X00935986-I1Open ↗
08/24/2026X00935986-I1Open ↗
08/24/2026X00935986-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026X00935986-I1Open ↗
08/24/2026X00935986-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
11/10/2010220091709Open ↗
04/24/2009220002912Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/10/2010220091709Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X00935986-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/18/2012220091709Open ↗
01/07/2010220002912Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/18/2012220091709Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
01/18/2012220091709Open ↗
11/10/2010220091709Open ↗
01/06/2010220002912Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
11/10/2010220091709Open ↗
09/15/2010220080579Open ↗
04/24/2009220002912Open ↗