DOB06/02/2025FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION.OBSERVED THAT T HE RETAINING WALL AT THE REAR OF PROPERTY IS STRUCTURALLY COMPROMISED AND POSES A DANGER TO SUBJECT PREMISES AND ADJOINING PROPERTIES.REMEDY :IMMEDIATELY RETAIN A NYS LIC PE TO PROVIDE DRAWINGS BY 6/30/2025.COMM ENCE CONSTRUCTION WORK NO LATER THAN JULY 28,2025
ECB07/27/2023AT TIME OF INSPECTION OBSERVED HOUSEHOLD STUFF, BUCKETS, DEBRIS IN BLACK PLASTIC BEGS, VACUUMS, FURNITURE, A/C UNIT, AND BOXES OF CEREAL STORED ON TOP FLOOR PUBLIC HALLWAY & STAIRWELL WHICH PARTIALLY OBSTRUCTED$3K due
DOB03/27/2018REQUEST ADDITIONAL INFORMATION STRUCTURAL ASSESSMENT REPORT. OWNER IS DIRECTED TO IMMEDIATELY RETAIN A LICENSED STRUCTURAL ENGINEER AND TO PROVIDE TO THE NYCDOB RWU, A STRUCTURAL ASSESSMENT REPORT AND CONSTRUCTION REPAIR. DOCUMENTS NO LATER THAN APRIL 16,2018
DOB03/20/2018EMERGENCY WORK. OWNER TO PROCEED WITH IMMEDIATE ERECTION OF A CHAIN LINK FENCE (6FT MIN HGHT) AT THE REAR OF THE PROPERTY 10FT AWAY FROM THE EXISTING R/W. FENCE TO BE INSTALLED BY 3/30/2018. FILE FOR PERMIT WITHIN 48 HRS FROM COMMENCEMENT OF WORK
HPD11/29/2012§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD11/29/2012SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT GATE AT FRONT AREAWAY, 1st STORY
ECB12/08/2005WORK WITHOUT A PERMIT-WORK NOTED: CELLAR PARTITIONS ERECTED TO CREATE ONE, 2 PIECE BATHROOM AND BOILER ROOM, STORAGE RM CONTRARY TO CO.67945 WHICH STATES CELLAR BOLIER. REMEDY: OBTAIN PERMIT OR RESTORE PREMISESNothing owed — awaiting certificate of correction