← Back
Two family frame
480 EAST 145 STREET
BRONX · BIN 2095735
💬 Discuss this project
1990Year Built
3Stories
B2Building Class
R6Zoning
2,280 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC108/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor109/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854108/11/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/31/2026
Permit issued — Solar
X01444246-I1-SL
08/11/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01444246-I1
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/11/2026
Special inspection requirement — Final
TOM PETERSEN
08/11/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSOLAR CONTRACTING LLC08/31/2026
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedSOLAR ELEC CONTRACTNG LLC2 meters
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedSOLAR CONTRACTING LLC14 panels, 6.16 kw, 719.76 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/11/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/11/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/11/2026Energy Code Compliance InspectionsTOM PETERSENprogress
08/11/2026FinalTOM PETERSENprogress
08/11/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01444246-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026X01444246-I1Open ↗
08/25/2026X01444246-I1Open ↗
08/25/2026X01444246-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X01444246-I1Open ↗
08/25/2026X01444246-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01444246-I1Open ↗