← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
25 METROPOLITAN OVAL · BIN 2096658
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
2,199,075 sfGross Floor Area
2,719Units
Rent Stabilized951 Open Violations 950 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 951,289 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction21p · 2 filings · 6 docs
Floor 71p · 1 filing · 9 docs
Floor 61p · 1 filing · 9 docs
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 9 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX609/22/2026
KINGS GROUP NY407/08/2026
PARKCHESTER SOUTH CONDO1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC103/25/2026
ALWAYS FAST SERVICES CORP103/14/2026
CONNOLLY ENGINEERING, PLLC107/05/2022
SYED ENGINEERING, P.C.102/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMX CORPGeneral Contractor309/22/2026
ALEXANDER EUGENEElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
TWO-TONE CONTRACTING CORP.General Contractor107/08/2026
VINCO BUILDERS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC9809103/25/2026
CONNOLLY ENGINEERING, PLL3427107/05/2022
Building Lifecycle
All (109)Filed (5)Permit Issued (7)Signed Off (2)Facade (FISP) (12)Violation (57)Inspection (1)Objection (18)Special Inspection (7)
09/21/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
07/09/2026
Permit issued — Suspended Scaffold
X01383067-I1-SC
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
A
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
06/30/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
06/26/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, closed)
B
06/05/2026
Violation issued (HPD, closed)
B
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
B
05/20/2026
Permit issued — General Construction
X01323398-I1-GC
05/10/2026
Violation issued (HPD, closed)
B
04/13/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01383067-I1
04/12/2026
Violation issued (HPD, closed)
B
04/12/2026
Violation issued (HPD, closed)
B
04/12/2026
Violation issued (HPD, closed)
C
04/12/2026
Violation issued (HPD, closed)
C
04/08/2026
Objection raised — Scope
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Addressed
03/25/2026
Filed — Alteration
FACADE RESTORATION AND LEAK REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01323398-I1
03/16/2026
Permit issued — Sidewalk Shed
X01367079-I1-SH
03/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01367079-I1
02/12/2026
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB IN APTS # 2C, #6E, #7A, #7B, #7C, #7D, #7E, #7F, #7G, #7H & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758148-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SAFE
02/02/2023
Cycle 9 facade inspection completed
09/01/2022
Permit issued — Structural
X00758148-I1-ST
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Structural
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Scope
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Structural
07/08/2022
Objection resolved — Addressed
07/05/2022
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB IN APTS # 2C, #6E, #7A, #7B, #7C, #7D, #7E, #7F, #7G, #7H & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758148-I1
06/15/2022
Special inspection requirement — Post-installed Anchors
daniel connolly
06/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - Welding
daniel connolly
06/15/2022
Special inspection requirement — Structural Steel - Details
daniel connolly
06/15/2022
Special inspection requirement — Final
daniel connolly
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedLEMX CORP09/21/2026
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/09/2026
DOB NOWSidewalk ShedPermit IssuedLEMX CORP06/26/2026
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP.05/20/2026
DOB NOWSidewalk ShedPermit IssuedLEMX CORP03/16/2026
DOB NOWStructuralSigned-offVINCO BUILDERS LLC09/01/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/18/2021
BISOTISSUEDPROTO RESTORATION CONSTRUCTION04/08/2021
BISOTISSUEDB & A RESTORATION CONTRA04/02/2014
BISOTISSUEDROMANO PAVING & CONTR COR02/07/2014
BISOTISSUEDROMANO PAVING & CONTR COR09/13/2013
BISOTISSUEDB & A RESTORATION CONTRA08/19/2013
BISOTISSUEDB & A RESTORATION CONTRA08/16/2013
BISOTISSUEDKINGS COUNTY WATERPROOFING11/03/2000
BISOTISSUEDPPC CONSTRUCTION LLC11/08/1999
BISPLISSUEDMEDCO PLUMBING INC11/01/1999
2 projects · most recent 03/14/2026
FiledStatusContractorScope
03/14/2026Permit IssuedRICHARD NEU—
02/25/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 03/14/2026
Sidewalk Shed
FiledStatusContractorScope
03/14/2026Permit IssuedLEMX CORPSidewalk Shed
1 project · most recent 04/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/13/2026Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/30/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/15/2022Post-installed Anchorsdaniel connollyspecial
06/15/2022Structural Stability – Alterations of existing buildingsdaniel connollyspecial
06/15/2022Structural Steel - High Strength Boltingdaniel connollyspecial
06/15/2022Structural Steel - Weldingdaniel connollyspecial
06/15/2022Structural Steel - Detailsdaniel connollyspecial
06/15/2022Finaldaniel connollyprogress
02/10/2021FinalRAFI HAMIDprogress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/24/2026X00758148-I1Request digital key ↗
08/17/2026X01367079-I1Request digital key ↗
08/17/2026X01323398-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00468447-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
04/08/2021240298192Open ↗
04/04/2014220328973Open ↗
02/11/2014220328973Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/07/2021240298192Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
Showing 3 of 4 on file for this type
▸BISAPPROVED SIDEWALK SHED & SCAFFOLD APPLICATION1
04/06/2021240298192Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/07/2021240298192Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026X00758148-I1Open ↗
08/25/2026X00758148-I1Open ↗
08/25/2026X00758148-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026X01367079-I1Open ↗
08/17/2026X01323398-I1Open ↗
08/13/2026X00758148-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X00758148-I1Open ↗
08/24/2026X00468447-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/07/2021240298192Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/06/2013220328973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/07/2021240298192Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/06/2013220328973Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/06/2021240298192Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01323398-I1Open ↗
08/13/2026X00758148-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/08/2021240298192Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/06/2021240298192Open ↗
01/07/2021240298192Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/02/2018220328973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/07/2021240298192Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/20/2023240298192Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/20/2023240298192Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/20/2023240298192Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/20/2023240298192Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/06/2021240298192Open ↗
01/07/2021240298192Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/24/2023240298192Open ↗
02/14/2018220328973Open ↗
02/05/2018220328973Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/14/2013220328973Open ↗
▸BISFINAL1
01/20/2023240298192Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
02/17/2021240298192Open ↗
02/02/2018220328973Open ↗
02/26/2014220359127Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/20/2023240298192Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/26/2014220359127Open ↗
08/06/2013220328973Open ↗
08/06/2013220328973Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/07/2021240298192Open ↗
▸BISBOROUGH INTAKE FORM1
02/02/2018220328973Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01383067-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01383067-I1Open ↗