← Back
Condo, residential unit in 1-3 story building
Clearview Manor Condominium
180 DAVIS AVENUE · BIN 2098632
💬 Discuss this project
1996Year Built
—Stories
R3Building Class
R3-2Zoning
20,172 sfGross Floor Area
22Units
Rent Stabilized54 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: UNAVAILABLE OWNER · 30,886 sf lot · 0.65 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026Permit IssuedFara Electrical CorpGeneral Wiring
12/12/2025CompleteN.Z. PILGRIM ELECTRIC INCGeneral Wiring
Building Lifecycle
All (36)Filed (2)Permit Issued (1)Signed Off (1)Violation (22)Objection (4)Special Inspection (6)
06/22/2026
Special inspection requirement — Concrete - Cast-In-Place
04/20/2026
Filed — Alteration
X01383087-I1
04/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/05/2026
Special inspection requirement — Final
10/17/2025
Signed off — Alteration
Fix a one damage wood beam at the kitchen, on apt 8A.
X01276048-I1
10/15/2025
Permit issued — Structural
X01276048-I1-GC-CX
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Amauris Ramirez
09/15/2025
Objection raised — Inspections
09/15/2025
Objection raised — Fire_Protection
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Amauris Ramirez
08/26/2025
Filed — Alteration
Fix a one damage wood beam at the kitchen, on apt 8A.
X01276048-I1
08/22/2025
Special inspection requirement — Final
Amauris Ramirez
06/05/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (ECB, open)
Construction
08/04/2024
Violation issued (ECB, closed)
Construction
04/02/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
11/01/2021
Violation issued (HPD, open)
A
11/01/2021
Violation issued (HPD, open)
B
08/25/2021
Violation issued (HPD, open)
C
08/03/2021
Violation issued (HPD, closed)
C
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
02/04/2015
Violation issued (HPD, closed)
I
10/03/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1988
Violation issued (ECB, closed)
Public Assembly
06/28/1988
Violation issued (ECB, closed)
Public Assembly
07/19/1979
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOTAL MANAGEMENT NYC408/29/2026
OWNER OF 180 DAVIS AVE203/22/2026
CLEARVIEW MANOR CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMIREZ ENGINEERING PLLC204/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N.Z. PILGRIM ELECTRIC INCElectrical103/22/2026
J & R CONTRACTORS SERVICEGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAMIREZ ENGINEERING PLLC8679108/26/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJ & R CONTRACTORS SERVICE10/15/2025
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/22/2026Concrete - Cast-In-Place—special
04/05/2026Tenant Protection Plan Compliance—special
04/05/2026Final—progress
09/25/2025Fire-Resistance Rated ConstructionAmauris Ramirezprogress
09/15/2025Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
08/22/2025FinalAmauris Ramirezprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026X01276048-I1Request digital key ↗
08/17/2026X01383087-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026X01276048-I1Open ↗
08/17/2026X01383087-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X01276048-I1Open ↗
09/01/2026X01276048-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X01276048-I1Open ↗