DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
ECB09/02/2022B254 AS PER D.O.B RECORDS PERMIT#240122997 HAS NOT BEEN SIGNED OFF THEREFORE BOILER IS UNREGISTERED.REGISTER BOILER AND SUBMIT A CERT.OF CORRECTION$3K due
ECB09/02/2022B254 AS PER D.O.B RECORDS PERMIT#240122997 HAS NOT BEEN SIGNED OFF THEREFORE BOILER IS UNREGISTERED.REGISTER BOILER AND SUBMIT A CERT.OF CORRECTIONNothing owed — awaiting certificate of correction
ECB06/10/2020DOCUMENTS TO BE KEPT ONSITE(MECHANICAL HOIST SPECIFICATIONS)AT THE TIME OF MY INSPECTION,I OBSERVED THAT THESE WERE NO DOCUMENTS,IN SUBJECTIONS,OR SPECIFICATIONS FOR THE TEMPORARY MATERIAL HOIST AND THE PULLEYNothing owed — awaiting certificate of correction
ECB02/02/2019FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION I OBSERVED ON EXP1 WEST ELEVATION VERTICAL CRACKS IN MORTAR JOINTS ON 3RD FLOOR SPANDREL NORTHWEST ENTRANCE; MISSING BRICK ANDNothing owed — awaiting certificate of correction
ECB01/30/2019FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED ON EXP1 WEST ELEVATION I OBSEVED ON 3 FLOOR SPANDREL VERTICAL CRACKS IN MORTAR JOINTS MISSING MORTAR JOINTSNothing owed — awaiting certificate of correction
ECB06/01/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB10/31/1997WORK NOT CONFORMING TO APPROVED PLANS PLUMBING IN THAT THE AUSUL CONTROL GAS VALVE IS NOT HOOKED IN TO THE AUSUL SYSTEM & IS BEING HELD IN THE OPEN POSITION BY A STRING. REMEDY: CONFORM TO APPROVED PLANS & LEAVNothing owed — awaiting certificate of correction