← Back
Two family brick
3447 EDSON AVENUE
BRONX · BIN 2101838
💬 Discuss this project
2000Year Built
2Stories
B1Building Class
R4AZoning
2,100 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 1,995 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 11 docs
Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 3449 EDSON AVE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC308/30/2024
DENNIS V. PANETTIERI, ARCHITECT111/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
ALBA CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARK HALLElectrical103/21/2026
PATRIOT ENERGY SOL COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116308/30/2024
Building Lifecycle
All (26)Filed (4)Permit Issued (1)Violation (15)Special Inspection (6)
09/03/2024
Permit issued — Solar
X01100371-I1-SL
08/30/2024
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
X01100371-P1
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
08/29/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
08/29/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
08/22/2024
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
X01100371-I1
08/21/2024
Filed — Alteration
X01096617-I1
11/08/2023
Filed — Alteration
DOB NOW BUILD APPLICATION FOR LEGALIZATION OF THE INSTALLATION OF NON-BEARING PARTITIONS TO CREATE RECREATION AREA AND STORAGE AREAS. NO CHANGE IN USE OR OCCUPANCY. DWEELING UNIT OR EGRESS. PLUMBING CAP AND REMOVE AT CELLAR FLOOR
X00956774-I1
11/08/2023
Special inspection requirement — Final
Dennis Panettieri
07/21/2023
Violation issued (HPD, closed)
I
07/21/2023
Violation issued (HPD, closed)
I
07/21/2023
Violation issued (HPD, closed)
I
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (ECB, open)
Construction
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (HPD, closed)
B
07/17/2023
Violation issued (HPD, closed)
B
09/26/2000
Violation issued (ECB, closed)
Site Safety
09/26/2000
Violation issued (ECB, closed)
Site Safety
05/25/2000
Violation issued (ECB, closed)
Construction
05/25/2000
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedPATRIOT ENERGY SOL CO09/03/2024
BIS—ISSUEDJASAM REALTY CORP07/14/2000
BISPLISSUEDM&J PLG & HTG MECHANICAL CORP06/21/2000
BISEQISSUEDJASAM REALTY CORP04/04/2000
BIS—ISSUEDJASAM REALTY CORP04/04/2000
1 job · most recent 08/19/2024
FiledStatusContractorScope
08/19/2024Permit IssuedMAK ELECTRICAL CONTR CORP2 meters
1 job · most recent 08/30/2024
FiledStatusContractorScope
08/30/2024Permit IssuedPATRIOT ENERGY SOL CO11 panels, 4.51 kw, 1,177 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/29/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/29/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/29/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/29/2024FinalVYACHESLAV NECHAYEVprogress
08/29/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
11/08/2023FinalDennis Panettieriprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01096617-I1Request digital key ↗
08/21/2026X01100371-I1Request digital key ↗
08/21/2026X01100371-P1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026X01100371-P1Open ↗
08/24/2026X01100371-P1Open ↗
08/24/2026X01100371-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X01096617-I1Open ↗
08/21/2026X01100371-I1Open ↗
08/13/2026X01100371-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X01100371-P1Open ↗
08/24/2026X01100371-P1Open ↗