← Back
Two family frame
317 TURNEUR AVENUE
BRONX · BIN 2102225
💬 Discuss this project
2000Year Built
2Stories
B2Building Class
R3-2Zoning
1,902 sfGross Floor Area
2Units
Two family frame · 2,519 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR105/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERGER QUALITY ELEC'L CONElectrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475105/07/2025
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
08/18/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01222450-I1
06/25/2025
Permit issued — Solar
X01222450-I1-SL
06/16/2025
Objection resolved — Addressed
05/30/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Electrical
05/22/2025
Objection raised — Scope
05/07/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01222450-I1
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
05/07/2025
Special inspection requirement — Final
Andres Arias Londono
05/07/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/25/2025
BISOTISSUEDPRO CUSTOM SOLAR LLC05/31/2023
BIS—ISSUEDBEECHWOOD RB, LLC12/11/2000
BISPLISSUEDL & S MECHANICAL CORP06/30/2000
BISPLISSUEDL & S MECHANICAL CORP06/29/2000
BIS—ISSUEDBEECHWOOD RB, LLC06/15/2000
BIS—ISSUEDBEECHWOOD RB, LLC04/27/2000
2 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
04/08/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
05/07/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
05/07/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
05/07/2025FinalAndres Arias Londonoprogress
05/07/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01222450-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/24/2023240348183Open ↗
▸BISWORK PERMIT APPLICATION1
05/31/2023240348183Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026X01222450-I1Open ↗
08/23/2026X01222450-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/24/2023240348183Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/24/2023240348183Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2023240348183Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026X01222450-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X01222450-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/31/2023240348183Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/24/2023240348183Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/24/2023240348183Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/24/2023240348183Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/24/2023240348183Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01222450-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/24/2023240348183Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/24/2023240348183Open ↗