← Back
Elevator apt, fireproof without stores
870 EAST 162 STREET
BRONX · BIN 2102490
💬 Discuss this project
2001Year Built
6Stories
D3Building Class
R7-1Zoning
37,888 sfGross Floor Area
71Units
LL97 CoveredRent Stabilized3 Open Violations ▸
Elevator apt, fireproof without stores · Owner of record: GEEL EAST 162ND STREET HOUSING DEVELOPME NT FUND · 18,530 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GEEL WEBSTER AVE HOU DEV FUND1507/08/2026
J G CONSTRUCTION SRVCS407/08/2026
GEEL EAST 162ND STREET HOUSING DEVELOPME NT FUND203/22/2026
GEEL EAST 162 ST LIMITED103/22/2026
GEEL EAST 162ND STREET HDFC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T.C. AIR CONDITIONING CORGeneral Contractor303/21/2026
A & C HTG SERVICES, INCPlumbing307/08/2026
JEROME GORDONElectrical103/21/2026
STX ELECTRICAL CORPElectrical103/22/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137108/26/2024
NEW YORK ENGINEERING ASSO851408/23/2024
Building Lifecycle
All (98)Filed (6)Permit Issued (5)Signed Off (3)Violation (60)Inspection (2)Special Inspection (22)
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, closed)
B
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, closed)
A
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, open)
C
02/12/2025
Violation issued (HPD, closed)
B
01/10/2025
Signed off — Alteration
REPLACE GAS BOILERS.
X01081456-I1
01/10/2025
Signed off — Alteration
REPLACE GAS BOILERS.
X01081456-S1
01/10/2025
Signed off — Alteration
REPLACE GAS BOILERS.
X01081456-S2
11/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/12/2024
Permit issued — Mechanical Systems
X01100458-I1-MS
08/26/2024
Filed — Alteration
X01100458-I1
08/23/2024
Filed — Alteration
REPLACE GAS BOILERS.
X01081456-P1
08/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
08/22/2024
Special inspection requirement — Final
John Alleyne
08/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
John Alleyne
08/22/2024
Special inspection requirement — Duct leakage testing, insulation and design
John Alleyne
08/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
John Alleyne
08/22/2024
Special inspection requirement — Mechanical Systems
SHAHIN BADALY
08/22/2024
Special inspection requirement — Energy Code Compliance Inspections
John Alleyne
08/19/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
08/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/01/2024
Permit issued — Plumbing
X01081456-S1-PL
08/01/2024
Permit issued — Boiler Equipment
X01081456-I1-BE
08/01/2024
Permit issued — Boiler Equipment
X01081456-S2-BE
07/26/2024
Filed — Alteration
REPLACE GAS BOILERS.
X01081456-I1
07/26/2024
Filed — Alteration
REPLACE GAS BOILERS.
X01081456-S1
07/26/2024
Filed — Alteration
REPLACE GAS BOILERS.
X01081456-S2
07/24/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
07/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/24/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
07/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
07/17/2024
Violation issued (HPD, closed)
C
07/17/2024
Violation issued (HPD, closed)
A
07/17/2024
Violation issued (HPD, closed)
A
07/17/2024
Violation issued (HPD, closed)
A
07/17/2024
Violation issued (HPD, closed)
A
07/17/2024
Violation issued (HPD, closed)
A
07/16/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
07/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
07/16/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
07/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2023
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2022
Violation issued (HPD, closed)
C
11/15/2022
Violation issued (HPD, closed)
C
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedT.C. AIR CONDITIONING COR09/12/2024
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP08/01/2024
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP08/01/2024
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP08/01/2024
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS08/24/2020
BISOTISSUEDCHAUDHRY PERVEZ09/14/2020
BIS—ISSUEDCASSINO CONTRACTING CORP03/28/2002
BISEQISSUEDCASSINO CONTRACTING CORP03/28/2002
BIS—ISSUEDCASSINO CONTRACTING CORP07/27/2001
BISEQISSUEDCASSINO CONTRACTING CORP07/27/2001
3 projects · most recent 11/21/2024
Boiler Controls
FiledStatusContractorScope
11/21/2024CompleteSTX ELECTRICAL CORPBoiler Controls
10/01/2024CompleteSTX ELECTRICAL CORPBoiler Controls
08/24/2020Permit IssuedRICHARD NEU—
1 project · most recent 08/21/2020
Sidewalk Shed
FiledStatusContractorScope
08/21/2020Permit IssuedJ & G CONSTRUCTION SVCSSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/23/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
08/22/2024FinalJohn Alleyneprogress
08/22/2024HVAC-R and service water piping design and insulationJohn Alleyneenergy_progress
08/22/2024Duct leakage testing, insulation and designJohn Alleyneenergy_progress
08/22/2024HVAC-R and service water heating equipmentJohn Alleyneenergy_progress
08/22/2024Mechanical SystemsSHAHIN BADALYspecial
08/22/2024Energy Code Compliance InspectionsJohn Alleyneprogress
08/19/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
08/19/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/24/2024Maintenance informationLOUIS ARENAenergy_progress
07/24/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/24/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/24/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/24/2024Heating SystemsLOUIS ARENAspecial
07/24/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/16/2024Maintenance informationLOUIS ARENAenergy_progress
07/16/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/16/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/16/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/16/2024Heating SystemsLOUIS ARENAspecial
07/16/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/21/2026X01081456-P1Request digital key ↗
08/21/2026X01081456-S2Request digital key ↗
08/21/2026X01081456-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00388185-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2020240284198Open ↗
▸BISWORK PERMIT APPLICATION1
09/14/2020240284198Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026X01081456-S2Open ↗
09/23/2026X01081456-S2Open ↗
09/23/2026X01081456-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026X01081456-S2Open ↗
09/23/2026X01081456-S2Open ↗
09/23/2026X01081456-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00388185-I1Open ↗
08/21/2026X01081456-P1Open ↗
08/21/2026X01081456-S2Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/30/2020240284198Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/30/2020240284198Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2020240284198Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/30/2020240284198Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00388185-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026X01081456-I1Open ↗
08/21/2026X01081456-P1Open ↗
08/21/2026X01081456-S2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/14/2020240284198Open ↗
08/30/2020240284198Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/30/2020240284198Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01081456-S2Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/14/2020240284198Open ↗
09/14/2020240284198Open ↗
08/30/2020240284198Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026X01081456-I1Open ↗
08/13/2026X01081456-P1Open ↗
08/13/2026X01081456-S2Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/30/2020240284198Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2020240284198Open ↗
▸Other Documents2
▸BISFEE EXEMPTION DOCUMENTATION1
08/30/2020240284198Open ↗
▸DOB NOWDHCR Document1
08/13/2026X01100458-I1Open ↗