← Back
Three families
765 ELTON AVENUE
BRONX · BIN 2102529
💬 Discuss this project
1999Year Built
3Stories
C0Building Class
R7-2Zoning
3,036 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,200 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 31p · 1 filing · 14 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITI CORP MORTGAGE103/22/2026
PROCIDA CONST CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL DENIS ASSOCIATES302/03/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C JAMES PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL DENIS ASSOCIATES2472302/03/2022
Building Lifecycle
All (18)Filed (3)Permit Issued (1)Signed Off (1)Violation (4)Inspection (5)Special Inspection (4)
04/16/2024
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
A
02/23/2022
Signed off — Alteration
GAS TURN OFF DUE TO LEAK. REMOVE AND REPLACED 2' 3/4" GAS PIPING AND GAS COCK AT EXISTING WATER HEATER ON THE 3RD FL.PERFORMED INTEGRITY TEST TO EXISTING HWH'S & BL, NO CHANGE IN USE OR OCCUPANCY. EXISTING BL & HWH'S NB#200506906
X00552266-I1
02/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2022
Filed — Alteration
GAS TURN OFF DUE TO LEAK. REMOVE AND REPLACED 2' 3/4" GAS PIPING AND GAS COCK AT EXISTING WATER HEATER ON THE 3RD FL.PERFORMED INTEGRITY TEST TO EXISTING HWH'S & BL, NO CHANGE IN USE OR OCCUPANCY. EXISTING BL & HWH'S NB#200506906
X00552266-P2
02/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
02/03/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
02/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
02/03/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
12/29/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/15/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/01/2021
Filed — Alteration
GAS TURN OFF DUE TO LEAK. REMOVE AND REPLACED 2' 3/4" GAS PIPING AND GAS COCK AT EXISTING WATER HEATER ON THE 3RD FL.PERFORMED INTEGRITY TEST TO EXISTING HWH'S & BL, NO CHANGE IN USE OR OCCUPANCY. EXISTING BL & HWH'S NB#200506906
X00552266-P1
11/22/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Permit issued — Plumbing
X00552266-I1-PL
08/04/2021
Filed — Alteration
GAS TURN OFF DUE TO LEAK. REMOVE AND REPLACED 2' 3/4" GAS PIPING AND GAS COCK AT EXISTING WATER HEATER ON THE 3RD FL.PERFORMED INTEGRITY TEST TO EXISTING HWH'S & BL, NO CHANGE IN USE OR OCCUPANCY. EXISTING BL & HWH'S NB#200506906
X00552266-I1
11/18/2002
Violation issued (ECB, closed)
Construction
05/21/2000
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offC JAMES PLBG & HTG INC11/15/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/15/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/03/2022Fire-Resistant Penetrations and JointsPAUL DENISspecial
02/03/2022Energy Code Compliance InspectionsPAUL DENISprogress
02/03/2022Fire-Resistant Penetrations and JointsPAUL DENISspecial
02/03/2022Energy Code Compliance InspectionsPAUL DENISprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026X00552266-I1Request digital key ↗
08/24/2026X00552266-P1Request digital key ↗
08/24/2026X00552266-P2Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00552266-I1Open ↗
08/24/2026X00552266-P2Open ↗
08/24/2026X00552266-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026X00552266-I1Open ↗
09/01/2026X00552266-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026X00552266-I1Open ↗
09/01/2026X00552266-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWOER: Notice to Proceed3
08/13/2026X00552266-P1Open ↗
08/13/2026X00552266-I1Open ↗
08/13/2026X00552266-P2Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00552266-I1Open ↗