← Back
Bungalow colony - cooperatively owned land
SILVER BEACH
BRONX · BIN 2103117
💬 Discuss this project
1921Year Built
3Stories
A8Building Class
R4AZoning
265,860 sfGross Floor Area
208Units
13 Open Violations 3 unresolved · 10 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORP · 2,407,000 sf lot · 0.11 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 28p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
1 job · most recent 03/24/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/24/2025Permit IssuedCOTTAM HEATING & AIR CONDHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric 6000 BTUH EZ FIT CEILING CASSETTE, MODEL NO. MLZ-KY06NA 6,000 BTU · Fan Coil Indoor ×3
9000 BTUH ONE-WAY CEILING CASSETTE INDOOR UNIT, MODELNO. MLZ-KP09NA 9,000 BTU · Fan Coil Indoor ×3
4-TON MULTI-ZONE INVERTER HEAT PUMP SYSTEM, MODEL NO. MXZ-SM48NAMHZ 54,000 BTU · Heat Pump Outdoor ×1
6000 BTUH DELUXE WALL-MOUNTED INDOOR UNIT, MODEL NO. MSZ-FS06NA-U1 6,000 BTU · Fan Coil Indoor ×1
6000 BTUH EZ FIT CEILING CASSETTE, MMODEL NO. MLZ-KY06NA 6,000 BTU · Fan Coil Indoor ×1
1 job · most recent 03/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/24/2025Permit IssuedZEREGA CONTRACTING CORPGas, Water/Sanitary
2 jobs · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025Permit IssuedC.Q. ELECTR'L CONTRG CORPGeneral Wiring
07/14/2024CompleteC.Q. ELECTR'L CONTRG CORP1 meters, 1 new_meters
1 job · most recent 03/24/2025
Concrete Wood
FiledStatusContractorScope
03/24/2025Permit IssuedCOTTAM HEATING & AIR CONDConcrete, Wood
1 job · most recent 06/14/2022
Fence
FiledStatusContractorScope
06/14/2022Permit IssuedGREEN CASTLE A MGMT CORPFence
Building Lifecycle
All (81)Filed (7)Permit Issued (7)Signed Off (1)Violation (1)Inspection (5)Objection (30)Special Inspection (30)
06/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2025
Permit issued — Plumbing
X00743133-I1-PL
04/22/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/08/2025
Special inspection requirement — Air barrier — testing
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Subgrade Inspections
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Wood – Prefabricated I-Joists
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Concrete - Cast-In-Place
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Footing and Foundation
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Final
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Structural Wood Frame
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Fenestration areas
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Maintenance information
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Air barrier - visual inspection
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Permanent certificate
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Insulation placement and R values
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Protection of exposed foundation insulation
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Fenestration air leakage
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Lighting in dwelling units
DEBABRATA BANERJEE
04/08/2025
Special inspection requirement — Metering
DEBABRATA BANERJEE
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2025
Objection resolved — Addressed
03/31/2025
Objection raised — C/O of existing property requi
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
DEBABRATA BANERJEE
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEBABRATA BANERJEE
03/26/2025
Permit issued — Plumbing
X00743133-I1-PL
03/24/2025
Filed — Alteration
ALTERATION TYPE 2 FILED FOR PLUMBING WORK AND GAS EQUIPMENT IN RECONSTRUCTED 1-FAMILY DWELLING. INSTALLATION INCLUDES GAS COMBINATION BOILER/HWH DRYER & COOKING APPLIANCE. INSTALLATION OF SINKS, LAVATORIES, TOILETS, DISH WASHER, WASHING MACHINE, ETC.
X00743133-P1
03/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Inverter heat pump to be installed in open space west side yard to provide heating and cooling for cellar floor, first floor and second floor.
X00741500-P1
03/21/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Subgrade Inspections
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Wood – Prefabricated I-Joists
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Final
DEBABRATA BANERJEE
03/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEBABRATA BANERJEE
02/26/2025
Permit issued — Mechanical Systems
X00741500-S2-MS
01/15/2025
Permit issued — Foundation
X00741500-I1-GC-CX
01/14/2025
Permit issued — Plumbing
X00743133-I1-PL
12/23/2024
Signed off — Full Demolition
HAND HELD DEMOLITION OF 1 STORY 1 FAMILY HOUSE
X01079468-I1
12/23/2024
Violation issued (ECB, closed)
Construction
11/19/2024
Permit issued — Full Demolition
X01079468-I1-FD
07/26/2024
Objection resolved — Addressed
07/23/2024
Objection raised — Admin
07/12/2024
Filed — Full Demolition
HAND HELD DEMOLITION OF 1 STORY 1 FAMILY HOUSE
X01079468-I1
05/28/2024
Permit issued — Construction Fence
X00666581-I1-FN
03/19/2024
Objection raised — Scope
03/19/2024
Objection resolved — Addressed
02/27/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Inverter heat pump to be installed in open space west side yard to provide heating and cooling for cellar floor, first floor and second floor.
X00741500-S2
06/24/2022
Objection raised — Zoning
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Other
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Scope
06/24/2022
Objection resolved — Addressed
Latest 60 of 81 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DENNIS V. PANETTIERI, ARCHITECT703/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALBA CONSULTANTS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN CASTLE A MGMT CORPGeneral Contractor707/08/2026
COTTAM HEATING & AIR CONDIT.General Contractor203/21/2026
C.Q. ELECTR'L CONTRG CORPElectrical103/22/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
TAP PLUMBING CORPPlumbing107/08/2026
ZEREGA CONTRACTING CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IMPACT CONCRETE & CONTROL864503/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZEREGA CONTRACTING CORP05/01/2025
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP03/26/2025
DOB NOWMechanical SystemsPermit IssuedCOTTAM HEATING AIR COND02/26/2025
DOB NOWFoundationPermit IssuedGREEN CASTLE A MGMT CORP01/15/2025
DOB NOWPlumbingPermit IssuedDNA PLUMBING CONTR. INC01/14/2025
DOB NOWFull DemolitionSigned-offGREEN CASTLE A MGMT CORP11/19/2024
DOB NOWConstruction FencePermit IssuedGREEN CASTLE A MGMT CORP05/28/2024
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/22/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
04/08/2025Air barrier — testing DEBABRATA BANERJEEenergy_progress
04/08/2025Subgrade InspectionsDEBABRATA BANERJEEspecial
04/08/2025Wood – Prefabricated I-JoistsDEBABRATA BANERJEEspecial
04/08/2025Concrete - Cast-In-PlaceDEBABRATA BANERJEEspecial
04/08/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)DEBABRATA BANERJEEspecial
04/08/2025Subsurface Conditions – Fill Placement & In-Place DensityDEBABRATA BANERJEEspecial
04/08/2025Footing and FoundationDEBABRATA BANERJEEprogress
04/08/2025FinalDEBABRATA BANERJEEprogress
04/08/2025Energy Code Compliance InspectionsDEBABRATA BANERJEEprogress
04/08/2025Fire-Resistance Rated ConstructionDEBABRATA BANERJEEprogress
04/08/2025Structural Wood FrameDEBABRATA BANERJEEprogress
04/08/2025Fenestration areasDEBABRATA BANERJEEenergy_progress
04/08/2025Maintenance informationDEBABRATA BANERJEEenergy_progress
04/08/2025Fenestration and door U-factor and product ratingsDEBABRATA BANERJEEenergy_progress
04/08/2025Air barrier - visual inspectionDEBABRATA BANERJEEenergy_progress
04/08/2025Permanent certificateDEBABRATA BANERJEEenergy_progress
04/08/2025Insulation placement and R valuesDEBABRATA BANERJEEenergy_progress
04/08/2025Protection of exposed foundation insulationDEBABRATA BANERJEEenergy_progress
04/08/2025Fenestration air leakageDEBABRATA BANERJEEenergy_progress
04/08/2025Lighting in dwelling unitsDEBABRATA BANERJEEenergy_progress
04/08/2025MeteringDEBABRATA BANERJEEenergy_progress
03/28/2025Energy Code Compliance InspectionsDEBABRATA BANERJEEprogress
03/28/2025Fire-Resistant Penetrations and JointsDEBABRATA BANERJEEspecial
03/21/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)DEBABRATA BANERJEEspecial
03/21/2025Subgrade InspectionsDEBABRATA BANERJEEspecial
Latest 25 of 45.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00666581-I1Request digital key ↗
08/21/2026X00741500-S2Request digital key ↗
08/21/2026X01079468-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
04/25/2022220746646Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00741500-P1Open ↗
08/13/2026X00741500-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/26/2026X00741500-P1Open ↗
09/26/2026X00741500-P1Open ↗
09/02/2026X00741500-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/26/2026X00741500-P1Open ↗
09/26/2026X00741500-P1Open ↗
09/02/2026X00741500-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00666581-I1Open ↗
08/21/2026X00741500-S2Open ↗
08/21/2026X00741500-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X00741500-I1Open ↗
08/13/2026X00741500-P1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01079468-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01079468-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01079468-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01079468-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00741500-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00741500-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00741500-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026X00741500-S2Open ↗
08/15/2026X00741500-P1Open ↗
08/15/2026X00741500-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00743133-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01079468-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/25/2022220746646Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification3
08/15/2026X00741500-P1Open ↗
08/15/2026X00741500-I1Open ↗
08/13/2026X01079468-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X00741500-P1Open ↗
08/13/2026X00741500-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00741500-I1Open ↗
08/13/2026X00741500-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01079468-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01079468-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01079468-I1Open ↗