← Back
Three families
1056 REV JAMES POLITE AVE
BRONX · BIN 2103536
💬 Discuss this project
2003Year Built
3Stories
C0Building Class
R7-1Zoning
2,613 sfGross Floor Area
3Units
Rent Stabilized17 Open Violations ▸FDNY Report ↗
Three families · 2,611 sf lot · 1 FAR built · Flood zone X
Locations of Work
General
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JACKSON DEVELOPMENT GROUP303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2014$439K—— → —$168/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP202/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
21 PLUMBING & HEATING INCPlumbing503/22/2026
TRINCHESE CONSTRUCTION INGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573202/18/2025
Building Lifecycle
All (101)Filed (2)Permit Issued (2)Signed Off (1)Violation (60)Inspection (2)Objection (8)Special Inspection (26)
05/08/2026
Violation issued (HPD, closed)
A
03/20/2026
Signed off — Alteration
RESTORE EX. 3-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION, MINOR STRUCTURAL FRAMING, PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
X01042619-I1
11/17/2025
Violation issued (HPD, closed)
I
06/13/2025
Violation issued (HPD, closed)
A
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Costanza
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
02/25/2025
Special inspection requirement — Structural Wood Frame
Nat Costanza
02/25/2025
Special inspection requirement — Final
Nat Costanza
02/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
02/25/2025
Special inspection requirement — Fenestration air leakage
Nat Costanza
02/25/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
02/25/2025
Special inspection requirement — Interior lighting power
Nat Costanza
02/25/2025
Special inspection requirement — Fenestration areas
Nat Costanza
02/25/2025
Special inspection requirement — Wood – Seismic Resistance
Nat Costanza
02/25/2025
Special inspection requirement — Air barrier - visual inspection
Nat Costanza
02/18/2025
Filed — Alteration
RESTORE EX. 3-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION, MINOR STRUCTURAL FRAMING, PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
X01042619-P1
02/18/2025
Special inspection requirement — Wood – Seismic Resistance
02/17/2025
Special inspection requirement — Interior lighting power
Nat Costanza
02/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
02/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Costanza
02/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
02/17/2025
Special inspection requirement — Final
Nat Costanza
02/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
02/17/2025
Special inspection requirement — Structural Wood Frame
Nat Costanza
02/17/2025
Special inspection requirement — Air barrier - visual inspection
Nat Costanza
02/17/2025
Special inspection requirement — Fenestration areas
Nat Costanza
02/17/2025
Special inspection requirement — Fenestration air leakage
Nat Costanza
02/17/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
02/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
02/05/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/02/2024
Permit issued — General Construction
X01042619-I1-GC-CX
05/24/2024
Permit issued — Structural
X01042619-I1-GC-CX
05/24/2024
Objection raised — C/O of existing property requi
05/24/2024
Objection resolved — Addressed
05/20/2024
Objection raised — C/O of existing property requi
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Cost
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Admin
05/20/2024
Objection resolved — Addressed
05/15/2024
Filed — Alteration
RESTORE EX. 3-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION, MINOR STRUCTURAL FRAMING, PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
X01042619-I1
04/16/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/30/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
04/19/2021
Violation issued (HPD, closed)
I
04/19/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
06/13/2019
Violation issued (HPD, open)
B
06/13/2019
Violation issued (HPD, open)
B
06/13/2019
Violation issued (HPD, open)
C
06/13/2019
Violation issued (HPD, open)
C
06/13/2019
Violation issued (HPD, open)
B
06/13/2019
Violation issued (HPD, closed)
C
04/10/2019
Violation issued (HPD, open)
C
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRINCHESE CONSTRUCTION IN08/02/2024
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN05/24/2024
BIS—ISSUEDBELLEROSE BUILDERS08/22/2003
BISPLISSUEDQUEENS MECH GRP05/23/2003
BIS—ISSUEDBELLEROSE BUILDERS02/27/2003
BIS—ISSUEDVAN SAN CONSTRUCTION CORP.12/01/1989
BISEQISSUEDVAN SAN CONSTRUCTION CORP.12/01/1989
1 project · most recent 05/23/2024
General Wiring
FiledStatusContractorScope
05/23/2024CompleteTRIANGLE ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/25/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
02/25/2025Structural Stability – Alterations of existing buildingsNat Costanzaspecial
02/25/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
02/25/2025Energy Code Compliance InspectionsNat Costanzaprogress
02/25/2025Structural Wood FrameNat Costanzaprogress
02/25/2025FinalNat Costanzaprogress
02/25/2025Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
02/25/2025Fenestration air leakageNat Costanzaenergy_progress
02/25/2025Insulation placement and R valuesNat Costanzaenergy_progress
02/25/2025Interior lighting powerNat Costanzaenergy_progress
02/25/2025Fenestration areasNat Costanzaenergy_progress
02/25/2025Wood – Seismic ResistanceNat Costanzaspecial
02/25/2025Air barrier - visual inspectionNat Costanzaenergy_progress
02/18/2025Wood – Seismic Resistance—special
02/17/2025Interior lighting powerNat Costanzaenergy_progress
02/17/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
02/17/2025Structural Stability – Alterations of existing buildingsNat Costanzaspecial
02/17/2025Energy Code Compliance InspectionsNat Costanzaprogress
02/17/2025FinalNat Costanzaprogress
02/17/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
02/17/2025Structural Wood FrameNat Costanzaprogress
02/17/2025Air barrier - visual inspectionNat Costanzaenergy_progress
02/17/2025Fenestration areasNat Costanzaenergy_progress
02/17/2025Fenestration air leakageNat Costanzaenergy_progress
02/17/2025Insulation placement and R valuesNat Costanzaenergy_progress
Latest 25 of 26.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01042619-P1Request digital key ↗
08/20/2026X01042619-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026X01042619-P1Open ↗
08/24/2026X01042619-P1Open ↗
08/22/2026X01042619-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026X01042619-P1Open ↗
08/22/2026X01042619-I1Open ↗
08/22/2026X01042619-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01042619-I1Open ↗
08/13/2026X01042619-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01042619-P1Open ↗
08/13/2026X01042619-I1Open ↗