← Back
Walk-up apt, over six families with stores
1605 UNIVERSITY AVENUE
BRONX · BIN 2114454
💬 Discuss this project
1917Year Built
5Stories
C7Building Class
R7-1Zoning
44,000 sfGross Floor Area
38Units
9 Open Violations ▸FISP: SAFE
Walk-up apt, over six families with stores · Owner of record: GENERAL PARTNER UAC 3 LLC · 12,035 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP108/06/2026
UNIMAC DEVELOPER L.P.803/22/2026
NEW YORK CITY HOUSING AUTHOR403/21/2026
NEW YORK CITY HOUSING AUTHORITY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP108/05/2026
JIM KUSI PE106/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK CONTRACTING GROUPGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIM KUSI, PE3757106/16/2026
Building Lifecycle
All (75)Filed (2)Permit Issued (1)Facade (FISP) (6)Violation (60)Objection (2)Special Inspection (4)
08/06/2026
Objection resolved — Resolved
08/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01439661-I1
08/05/2026
Permit issued — Sidewalk Shed
X01439661-I1-SH
07/07/2026
Objection raised — Other
06/17/2026
Violation issued (ECB, closed)
Elevators
06/17/2026
Violation issued (ECB, closed)
Elevators
06/16/2026
Filed — Alteration
FACADE REPAIRS INCLUDING BRICK MASONRY RE-POINTING, RE-STITCHING, WINDOW LINTEL CAULKING & WINDOW SILL REPLACEMENT, ETC. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01411891-I1
06/12/2026
Special inspection requirement — Masonry
Jim Kusi
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jim Kusi
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jim Kusi
06/03/2026
Special inspection requirement — Final
Jim Kusi
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, open)
B
12/06/2023
Violation issued (HPD, open)
B
12/06/2023
Violation issued (HPD, open)
C
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, open)
B
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, open)
C
12/06/2023
Violation issued (HPD, open)
B
12/06/2023
Violation issued (HPD, open)
C
10/27/2023
Violation issued (HPD, open)
B
10/27/2023
Violation issued (HPD, open)
C
10/27/2023
Violation issued (HPD, closed)
C
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
A
05/25/2023
Violation issued (HPD, closed)
B
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2022
Violation issued (HPD, closed)
B
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2020
Violation issued (HPD, closed)
A
09/09/2020
Violation issued (HPD, closed)
B
09/09/2020
Violation issued (HPD, closed)
C
09/09/2020
Violation issued (HPD, closed)
B
09/09/2020
Violation issued (HPD, closed)
B
08/31/2020
Cycle 9 facade report submitted
08/30/2020
Cycle 9 facade report signed — SAFE
08/26/2020
Violation issued (ECB, closed)
Construction
08/11/2020
Cycle 9 facade inspection completed
08/11/2020
Cycle 8 facade inspection completed
06/10/2020
Violation issued (HPD, closed)
C
04/30/2020
Cycle 8 facade report signed — No Report Filed
02/14/2020
Cycle 8 facade report submitted
10/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/05/2019
Violation issued (HPD, closed)
B
06/05/2019
Violation issued (HPD, closed)
A
02/11/2019
Violation issued (ECB, closed)
Local Law
09/27/2018
Violation issued (HPD, closed)
A
07/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (HPD, closed)
B
02/07/2018
Violation issued (HPD, closed)
B
02/07/2018
Violation issued (HPD, closed)
A
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP08/05/2026
BISEQISSUEDP & P CONTRACTING CORP12/24/2007
BIS—ISSUEDP & P CONTRACTING CORP12/24/2007
BISEQISSUEDP & P CONTRACTING CORP12/28/2006
BISSDISSUEDS & J INDUSTRIAL CORP08/30/2006
BIS—ISSUEDP & P CONTRACTING CORP05/08/2006
BISEQISSUEDP & P CONTRACTING CORP05/08/2006
BIS—ISSUEDP & P CONTRACTING CORP06/07/2005
BIS—ISSUEDP & P CONTRACTING CORP05/26/2005
BISEQISSUEDP & P CONTRACTING CORP05/24/2005
BISEQRE-ISSUEDP & P CONTRACTING CORP12/08/2004
BIS—ISSUEDP & P CONTRACTING CORP12/08/2004
1 project · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026Permit IssuedRICHARD NEU—
1 project · most recent 08/05/2026
Sidewalk Shed
FiledStatusContractorScope
08/05/2026Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/12/2026MasonryJim Kusispecial
06/12/2026Structural Stability – Alterations of existing buildingsJim Kusispecial
06/12/2026Tenant Protection Plan ComplianceJim Kusispecial
06/03/2026FinalJim Kusiprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026X01439661-I1Request digital key ↗
08/14/2026X01411891-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026X01411891-I1Open ↗
08/16/2026X01439661-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026X01411891-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026X01411891-I1Open ↗