← Back
Three families
826 EAST 242 STREET
BRONX · BIN 2116484
💬 Discuss this project
2006Year Built
3Stories
C0Building Class
R4Zoning
3,120 sfGross Floor Area
3Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Three families · Owner of record: E 242 STREET LLC · 2,500 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof1p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD307/08/2026
E 242 STREET1203/21/2026
E 242ND STREET703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WEXLER ASSOCIATES205/16/2025
GERALD CALIENDO ARCHITECTS304/29/2025
SIDERIS KEFALAS ENGINEERS PC112/11/2024
ASR ENGINEERING PC104/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
GERALD J CALIENDO ARCHITECT P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.N. CONSTRUCTION INCGeneral Contractor107/08/2026
Building Lifecycle
All (57)Filed (7)Permit Issued (1)Violation (2)Objection (35)Special Inspection (12)
10/09/2025
Objection raised — Admin
05/16/2025
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-S4
05/16/2025
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-S5
05/16/2025
Objection resolved — Addressed
05/16/2025
Special inspection requirement — Concrete - Cast-In-Place
05/16/2025
Special inspection requirement — Post-installed Anchors
05/16/2025
Special inspection requirement — Subgrade Inspections
05/14/2025
Special inspection requirement — Final
05/14/2025
Special inspection requirement — Footing and Foundation
05/12/2025
Special inspection requirement — Maintenance information
05/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
05/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
05/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/06/2025
Objection raised — Energy
04/29/2025
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-S3
04/29/2025
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-S2
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/14/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Admin
12/11/2024
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-S1
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/04/2024
Special inspection requirement — Sprinkler Systems
10/23/2024
Objection raised — Admin
10/23/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Admin
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Admin
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Admin
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Admin
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Structural
06/12/2024
Objection resolved — Addressed
06/04/2024
Filed — New Building
PROPOSED A NEW 10'-0" CURB-CUT WORK FILED IN CONJUNCTION WITH NB # X01045962-I1
X01045962-I1
04/22/2024
Permit issued — Construction Fence
X01022704-I1-FN
04/21/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01022704-I1
03/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2006
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedEMPIRE CONSTRUCTION ASSOC04/22/2024
BIS—ISSUEDBOYNE VIEW DEVEL.06/14/2007
BIS—ISSUEDBOYNE VIEW DEVEL.01/20/2006
1 project · most recent 05/16/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/16/2025——Storm, Water/Sanitary
1 project · most recent 05/16/2025
Steel Concrete Masonry
FiledStatusContractorScope
05/16/2025——Steel, Concrete, Masonry
1 project · most recent 04/21/2024
Fence
FiledStatusContractorScope
04/21/2024Permit IssuedG.N. CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/16/2025Concrete - Cast-In-Place—special
05/16/2025Post-installed Anchors—special
05/16/2025Subgrade Inspections—special
05/14/2025Final—progress
05/14/2025Footing and Foundation—progress
05/12/2025Maintenance information—energy_progress
05/12/2025HVAC-R and service water heating equipment—energy_progress
05/12/2025HVAC-R and service water piping design and insulation—energy_progress
05/12/2025HVAC-R and service water heating system controls—energy_progress
04/28/2025Fire-Resistant Penetrations and Joints—special
12/11/2024Fire-Resistant Penetrations and Joints—special
12/04/2024Sprinkler Systems—special
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026X01022704-I1Request digital key ↗
08/21/2026X01045962-S5Request digital key ↗
08/21/2026X01045962-S4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
10/15/2025220151369Open ↗
10/09/2025240092671Open ↗
07/31/2019220151369Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/30/2016220151369Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/17/2015220151369Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/30/2016220151369Open ↗
▸BISZONING DIAGRAM1
03/30/2016220151369Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/17/2015220151369Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/21/2026X01045962-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026X01045962-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/21/2026X01045962-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026X01045962-S4Open ↗
08/21/2026X01045962-S3Open ↗
08/21/2026X01045962-S2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/10/2015240092671Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/25/2018220151369Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
04/10/2015240092671Open ↗
10/02/2014220151369Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/17/2015220151369Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/21/2026X01045962-I1Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
03/30/2016220151369Open ↗
10/02/2014220151369Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/05/2018220151369Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/17/2015220151369Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/21/2026X01045962-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/21/2026X01045962-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026X01045962-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/30/2016220151369Open ↗
10/02/2014220151369Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/25/2018220151369Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/17/2015220151369Open ↗
12/17/2015220151369Open ↗
10/02/2014220151369Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/26/2016240092671Open ↗
▸BISSOIL REPORT1
12/17/2015220151369Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/25/2018220151369Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/17/2015220151369Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/25/2018220151369Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
04/26/2016240092671Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/21/2026X01045962-I1Open ↗
▸DOB NOWSOIL REPORT1
08/21/2026X01045962-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
03/30/2016220151369Open ↗
03/22/2016220151369Open ↗
12/18/2015220151369Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/17/2015220151369Open ↗
10/02/2014220151369Open ↗
10/02/2014220151369Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/10/2015240092671Open ↗
10/02/2014220151369Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/10/2015240092671Open ↗
▸BISADDITIONAL INFORMATION1
04/26/2016240092671Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
12/17/2015220151369Open ↗
10/02/2014220151369Open ↗
▸BISECCCNYS Analysis1
10/02/2014220151369Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/21/2026X01045962-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026X01045962-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/21/2026X01045962-I1Open ↗