← Back
Public elementary, junior or senior high
680 EAST 183 STREET
BRONX · Belmont · BIN 2118255
💬 Discuss this project
1899Year Built
5Stories
W1Building Class
R7-1Zoning
81,800 sfGross Floor Area
1Units
LL97 Covered21 Open Violations 0 unresolved · 21 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 58,586 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPARTMENT OF EDUCATION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARTLAND ENGINEERING, DPC205/22/2026
ANCORA ENGINEERING, PLLC105/21/2026
MASSA MULTIMEDIA ARCHITECTS111/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC403/21/2026
Building Lifecycle
All (16)Filed (4)Violation (4)Objection (3)Special Inspection (5)
07/22/2026
Objection resolved — Resolved
07/22/2026
Special inspection requirement — Demolition
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
05/22/2026
Filed — Alteration
SITEWORK TO REMOVE EXISTING TEMPORARY CONSTRUCTION BUILDING, RAMP AND ASSOCIATED UTILITIES.
X01401680-S1
05/21/2026
Filed — Alteration
SITEWORK TO REMOVE EXISTING TEMPORARY CONSTRUCTION BUILDING, RAMP AND ASSOCIATED UTILITIES.
X01401680-I1
05/19/2026
Special inspection requirement — Final
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/25/2025
Filed — Full Demolition
Cap and remove all gas and water connections to mini builidng.
X01316685-S1
11/20/2025
Filed — Full Demolition
Cap and remove all gas and water connections to mini builidng.
X01316685-I1
11/11/2025
Special inspection requirement — Demolition
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
09/04/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Violation issued (ECB, open)
Construction
07/28/2025
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 11/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/25/2025——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/22/2026Demolition—special
05/19/2026Final—progress
05/13/2026Structural Stability – Alterations of existing buildings—special
11/11/2025Demolition—special
11/11/2025Structural Stability – Alterations of existing Buildings—special
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026X01401680-S1Request digital key ↗
08/14/2026X01401680-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026X01401680-S1Open ↗
08/16/2026X01401680-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/15/2026X01401680-S1Open ↗
08/14/2026X01401680-I1Open ↗
08/13/2026X01316685-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/15/2026X01401680-S1Open ↗
08/14/2026X01401680-I1Open ↗
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal3
08/15/2026X01401680-S1Open ↗
08/14/2026X01401680-I1Open ↗
08/13/2026X01316685-S1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026X01316685-I1Open ↗
08/13/2026X01316685-S1Open ↗