← Back
Two family frame
332 SWINTON AVENUE
BRONX · BIN 2130393
💬 Discuss this project
2020Year Built
—Stories
B2Building Class
R3AZoning
2,784 sfGross Floor Area
2Units
Two family frame · 3,750 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 2 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 8 docs
2 jobs · most recent 02/04/2023
General Wiring
FiledStatusContractorScope
02/04/2023CompleteEUREKA ELECTRIC CONTNG COGeneral Wiring
06/20/2020CompleteSKY ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (93)Filed (9)Permit Issued (10)Signed Off (6)Inspection (9)Objection (44)Special Inspection (15)
12/01/2023
Signed off — Alteration
Construction work to add a bathrooom and wet bar in the cellar
X00784700-I1
12/01/2023
Signed off — Alteration
X00784720-I1
11/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/28/2023
Objection resolved — Addressed
07/27/2023
Objection raised — Other
07/21/2023
Filed — Alteration
Construction work to add a bathrooom and wet bar in the cellar
X00784700-P1
07/03/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/04/2023
Permit issued — Plumbing
X00784720-I1-PL
12/13/2022
Permit issued — General Construction
X00784700-I1-GC
10/13/2022
Filed — Alteration
Construction work to add a bathrooom and wet bar in the cellar
X00784700-I1
10/13/2022
Filed — Alteration
X00784720-I1
10/26/2021
Signed off — Alteration
THIS APPLICATION TO BE FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION #220716143
X00267932-I1
10/26/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/14/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/14/2021
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
10/14/2021
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
10/14/2021
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
10/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2021
Filed — Alteration
THIS APPLICATION TO BE FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION #220716143
X00267932-P2
09/08/2021
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
09/08/2021
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
09/08/2021
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
09/08/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
09/08/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2021
Signed off — Alteration
INSTALLATION OF SPRINKLER HEADS AND ASSEMBLY
X00357709-I1
07/01/2021
Filed — Alteration
THIS APPLICATION TO BE FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION #220716143
X00267932-P1
07/01/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
07/01/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/01/2021
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
07/01/2021
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
07/01/2021
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
06/24/2021
Permit issued — Plumbing
X00317391-I1-PL
06/24/2021
Permit issued — Plumbing
X00267932-I1-PL
05/20/2021
Signed off — Alteration
THIS APPLICATION TO BE FILED FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH ALTERATION TYPE 2 APPLICATION # 220716143
X00267943-I1
05/13/2021
Permit issued — Sprinklers
X00357709-I1-EW-SP
03/19/2021
Signed off — Alteration
CURB CUT FILED IN CONJUNCTION WITH JOB# 220716143
X00260300-I1
03/05/2021
Permit issued — Curb Cut
X00260300-I1-CC
03/05/2021
Permit issued — Mechanical Systems
X00267943-I1-MS
01/20/2021
Permit issued — Sprinklers
X00357709-I1-EW-SP
07/24/2020
Permit issued — Plumbing
X00317391-I1-PL
07/22/2020
Permit issued — Plumbing
X00267932-I1-PL
06/26/2020
Objection raised — Scope
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Structural
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Structural
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Structural
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Structural
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Structural
06/26/2020
Objection resolved — Addressed
06/26/2020
Objection raised — Other
Latest 60 of 93 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/20/2022$1.1M—— → —$409/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEDER-LUIS ARCHITECTURAL DESIGN, PL307/21/2023
PIROOZ ENGINEERING, P.C.509/15/2021
ROYAL ENGINEERING, P.C111/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ESC PLUMBING CORPlumbing907/08/2026
GOLIATH DESIGN & RENOVATIGeneral Contractor403/22/2026
TAN DEVELOPMENT, LLCGeneral Contractor403/21/2026
CASE PLUMBING LLCFire Protection107/08/2026
EUREKA ELECTRIC CONTNG COElectrical103/22/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
FRANKLIN ALVARADOElectrical103/21/2026
SKY ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177509/15/2021
TRIANGLE INSPECTION & TES7495309/15/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/04/2023
DOB NOWGeneral ConstructionSigned-offGOLIATH DESIGN & RENOVATI12/13/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/24/2021
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/24/2021
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C05/13/2021
DOB NOWCurb CutSigned-offTAN DEVELOPMENT, LLC03/05/2021
DOB NOWMechanical SystemsSigned-offTAN DEVELOPMENT, LLC03/05/2021
DOB NOWSprinklersSigned-offS & L PLUMBING INC01/20/2021
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/24/2020
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/22/2020
BIS—ISSUEDTAN DEVELOPMENT, LLC02/12/2021
BIS—ISSUEDTAN DEVELOPMENT, LLC02/12/2021
BIS—ISSUEDTAN DEVELOPMENT, LLC03/09/2020
BIS—ISSUEDTAN DEVELOPMENT, LLC03/09/2020
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/14/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
10/14/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/14/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
10/14/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
10/14/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/08/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/08/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
09/08/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
09/08/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
09/08/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/01/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/01/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/01/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
07/01/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
07/01/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
08/23/2026X00784700-I1Request digital key ↗
08/23/2026X00784720-I1Request digital key ↗
08/15/2026X00784700-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00267932-P2Request digital key ↗
08/15/2026X00267932-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00260300-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/14/2026X00357709-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00267943-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
04/21/2021220716143Open ↗
04/19/2021220716143Open ↗
04/08/2021220716143Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION3
03/09/2020220716143Open ↗
03/09/2020220716143Open ↗
03/09/2020220716143Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/06/2020220716143Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026X00784720-I1Open ↗
08/13/2026X00784700-I1Open ↗
08/13/2026X00784700-P1Open ↗
▸BISVERIFY TAX LOT1
06/15/2021220716143Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
02/20/2020220716143Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/15/2021220716143Open ↗
▸BISZONING DIAGRAM1
02/24/2020220716143Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/20/2020220716143Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/20/2020220716143Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026X00267932-I1Open ↗
09/01/2026X00267932-I1Open ↗
09/01/2026X00267932-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00260300-I1Open ↗
08/26/2026X00267932-P1Open ↗
08/26/2026X00267932-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026X00267932-I1Open ↗
09/01/2026X00267932-I1Open ↗
08/24/2026X00267932-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/09/2020220716143Open ↗
03/09/2020220716143Open ↗
03/09/2020220716143Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/06/2020220716143Open ↗
▸BISSTREET TREE CHECKLIST1
10/02/2019220716143Open ↗
▸BISSTREET TREE SIGNOFF1
06/15/2021220716143Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/09/2020220716143Open ↗
03/06/2020220716143Open ↗
10/02/2019220716143Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/15/2021220716143Open ↗
06/15/2021220716143Open ↗
06/15/2021220716143Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/15/2021220716143Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/15/2021220716143Open ↗
06/15/2021220716143Open ↗
06/15/2021220716143Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/15/2021220716143Open ↗
03/09/2020220716143Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/15/2021220716143Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
02/24/2020220716143Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/20/2020220716143Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/09/2020220716143Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/15/2021220716143Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE8
04/21/2021220716143Open ↗
04/19/2021220716143Open ↗
04/08/2021220716143Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/15/2021220716143Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
02/24/2020220716143Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/02/2019220716143Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
06/15/2021220716143Open ↗
05/10/2021220716143Open ↗
05/10/2021220716143Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
01/10/2020220716143Open ↗
▸BISEFILING COVER SHEET1
10/02/2019220716143Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
10/02/2019220716143Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
06/15/2021220716143Open ↗