← Back
Zoned residential, not Manhattan
717 EAST 235TH STREET
BRONX · BIN 2130501
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned residential, not Manhattan · Owner of record: 713 EAST 235TH LLC · 2,284 sf lot · 0 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 21p · 1 filing · 4 docs
Floor 11p · 1 filing · 2 docs
Basement1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED 24412308/29/2026
713 EAST 235TH303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.605/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IVAN ROSA LLCGeneral Contractor807/08/2026
INFINITI ESC PLUMBING CORPlumbing507/08/2026
BERNARDO TRUCIDOElectrical103/21/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177301/02/2025
IP CONCRETE TESTING AND I6252112/04/2024
Building Lifecycle
All (43)Filed (6)Permit Issued (8)Signed Off (5)Violation (2)Inspection (14)Objection (8)
07/06/2026
Signed off — Alteration
INSTALLATION OF A NEW 10'-0" CURB CUT IN CONJUNCTION WITH NB APPLICATION # 240291019
X00466802-I1
07/02/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/23/2026
Signed off — Alteration
INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A NEW 3 STORY BUILDING IN CONJUCTION WITH JOB APPLICATION #240291019
X00435311-I1
05/29/2026
Permit issued — Mechanical Systems
X00435311-I1-MS
05/11/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/07/2026
Signed off — Alteration
X00435319-I1
05/05/2026
Filed — Alteration
INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A NEW 3 STORY BUILDING IN CONJUCTION WITH JOB APPLICATION #240291019
X00435311-P1
05/04/2026
Signed off — Alteration
X00435322-I1
05/04/2026
Permit issued — Curb Cut
X00466802-I1-CC
05/01/2026
Signed off — Alteration
Installation of construction fence in conjunction with NB application # 240291019
X00558313-I1
04/27/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/08/2025
Permit issued — Construction Fence
X00558313-I1-FN
08/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/14/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2025
Permit issued — Sprinklers
X00435322-I1-EW-SP
03/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/27/2025
Permit issued — Plumbing
X00435319-I1-PL
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/16/2025
Violation issued (ECB, closed)
Construction
01/16/2025
Objection raised — Zoning
01/16/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Zoning
01/09/2025
Objection raised — Mechanical
01/09/2025
Objection raised — Mechanical
01/02/2025
Filed — Alteration
INSTALLATION OF A NEW 10'-0" CURB CUT IN CONJUNCTION WITH NB APPLICATION # 240291019
X00466802-I1
01/02/2025
Filed — Alteration
INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A NEW 3 STORY BUILDING IN CONJUCTION WITH JOB APPLICATION #240291019
X00435311-I1
12/27/2024
Filed — Alteration
X00435322-I1
12/04/2024
Filed — Alteration
X00435319-I1
09/10/2024
Permit issued — Construction Fence
X00558313-I1-FN
08/27/2024
Violation issued (ECB, closed)
Construction
02/07/2023
Permit issued — Construction Fence
X00558313-I1-FN
02/08/2022
Permit issued — Construction Fence
X00558313-I1-FN
02/04/2022
Filed — Alteration
Installation of construction fence in conjunction with NB application # 240291019
X00558313-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offIVAN ROSA LLC05/29/2026
DOB NOWCurb CutSigned-offIVAN ROSA LLC05/04/2026
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC09/08/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C05/06/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/27/2025
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC09/10/2024
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC02/07/2023
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC02/08/2022
BIS—ISSUEDIVAN ROSA LLC11/13/2025
BIS—ISSUEDIVAN ROSA LLC09/10/2025
BIS—ISSUEDIVAN ROSA LLC11/26/2024
BIS—ISSUEDIVAN ROSA LLC09/09/2024
BIS—ISSUEDIVAN ROSA LLC11/06/2023
BIS—ISSUEDIVAN ROSA LLC11/06/2023
1 project · most recent 05/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/05/2026Signed-offIVAN ROSA LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric CU-2 & CU-3: MXZ-SM48NAMHZ AH-1a & AH-2a: MSZ-GS09 AH-1b & AH-2b: MSZ-GS09 AH-1c & AH-2c: MSZ-GS09 AH-1d & AH-2d: MSZ-GS12 48,000 BTU · Vrf Outdoor ×2
CU-1: MXZ-3C30NA3 AH-b1: MSZ-GS12 AH-b2: MSZ-GS12 30,000 BTU · Heat Pump Outdoor ×1
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×5
FV-15VQ5 150 CFM · Exhaust Fan ×3
1 project · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/11/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
04/27/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/14/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/21/2026FinalSHAHRIAR QUAYYUMprogress
05/21/2026Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
05/21/2026Heating SystemsPIROOZ SOLTANIZADEHspecial
05/21/2026Mechanical SystemsPIROOZ SOLTANIZADEHspecial
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Heating Systems—special
05/04/2026Mechanical Systems—special
05/04/2026Final—progress
12/27/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
12/02/2020Sprinkler SystemsPIROOZ SOLTANIZADEHspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/16/2026X00435311-P1Request digital key ↗
08/16/2026X00435311-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/20/2026X00466802-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/20/2026X00435322-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/24/2026X00558313-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/20/2026X00435319-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
06/03/2025240291019Open ↗
08/02/2024240291019Open ↗
07/31/2024240291019Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
11/15/2023240291019Open ↗
11/15/2023240291019Open ↗
11/15/2023240291019Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
09/05/2024240291019Open ↗
09/03/2021240291019Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/03/2021240291019Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/03/2021240291019Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/03/2021240291019Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/21/2021240291019Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/03/2021240291019Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026X00435319-I1Open ↗
08/20/2026X00466802-I1Open ↗
08/16/2026X00435311-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026X00435322-I1Open ↗
08/28/2026X00435322-I1Open ↗
08/22/2026X00435311-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2020240291019Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026X00435311-I1Open ↗
▸Trade Schedules & Equipment1
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
09/03/2021240291019Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/03/2021240291019Open ↗
07/21/2021240291019Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/01/2023240291019Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/01/2023240291019Open ↗
09/03/2021240291019Open ↗
07/21/2021240291019Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/01/2023240291019Open ↗
09/03/2021240291019Open ↗
09/03/2021240291019Open ↗
Showing 3 of 4 on file for this type
▸BISSOIL REPORT1
09/03/2021240291019Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/01/2023240291019Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/03/2021240291019Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/01/2023240291019Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE4
08/02/2024240291019Open ↗
07/31/2024240291019Open ↗
06/14/2021240291019Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/15/2023240291019Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/02/2023240291019Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
06/10/2025240291019Open ↗
09/05/2024240291019Open ↗
09/22/2023240291019Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/26/2020240291019Open ↗
▸BISBOROUGH INTAKE FORM1
11/15/2023240291019Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
09/03/2021240291019Open ↗
07/21/2021240291019Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/03/2021240291019Open ↗