← Back
Walk-up apt, over six families with stores
Alexander Lofts
139 ALEXANDER AVENUE · BIN 2130542
💬 Discuss this project
2018Year Built
4Stories
C7Building Class
M1-2/R6AZoning
6,857 sfGross Floor Area
8Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 20 BRUCKNER, LLC · 2,500 sf lot · 2.74 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
20_BRUCKNER403/22/2026
GD1 CONSTRUCTION LLC203/22/2026
GDI CONSTRUCTION803/22/2026
ALEXANDER DEVELOPMENT603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL ZENREICH ARCHITECT PC202/07/2022
JONG HAE CHANG ARCHITECT111/10/2021
BENDIX ENGINEERING, P.C.303/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT603/21/2026
JRK CREATIVE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO PROJECTS CONST INCGeneral Contractor807/08/2026
FIRST STAR CONSTRUCTION *General Contractor303/21/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL ZENREICH ARCHITEC1724202/07/2022
JONG HAE CHANG ARCHITECT6169111/10/2021
BENDIX ENGINEERING, P.C.4293303/11/2021
Building Lifecycle
All (87)Filed (6)Permit Issued (7)Signed Off (5)Violation (16)Inspection (5)Objection (32)Special Inspection (16)
11/17/2025
Violation issued (HPD, closed)
I
08/19/2022
Signed off — Alteration
Interior renovationof existing commercial space indluding removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress, or occupancy.
X00457742-I1
08/08/2022
Signed off — Alteration
installation of Multi VRF Indoor and outdoor units in conjuction with the interior renovation as per plans filed herewith. no change to use, egress, or occupancy.
X00457792-I1
06/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Zenreich
06/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Zenreich
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
06/22/2022
Special inspection requirement — Lighting controls
Michael Zenreich
06/22/2022
Special inspection requirement — Final
Michael Zenreich
06/22/2022
Special inspection requirement — Interior lighting power
Michael Zenreich
06/20/2022
Objection resolved — Addressed
06/14/2022
Signed off — Alteration
MODIFICAITON OF EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
X00458164-I1
06/14/2022
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING INCLUDING INSTALLATION OF NEW FIXTURES IN CONJUCTION WITH THE INTERIOR RENOVATION, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00458622-I1
05/05/2022
Objection resolved — Addressed
03/14/2022
Signed off — Alteration
INSTALL NEW AWNINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00623881-I1
03/03/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/03/2022
Objection raised — Zoning
03/03/2022
Objection raised — Scope
02/07/2022
Filed — Alteration
Interior renovationof existing commercial space indluding removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress, or occupancy.
X00457742-P1
01/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/30/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/26/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/18/2021
Permit issued — General Construction
X00623881-I1-GC
11/10/2021
Filed — Alteration
INSTALL NEW AWNINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00623881-I1
11/02/2021
Special inspection requirement — Post-installed Anchors
Jong Hae Kim
08/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2021
Permit issued — Plumbing
X00458622-I1-PL
05/25/2021
Permit issued — Sprinklers
X00458164-I1-EW-SP
05/03/2021
Permit issued — Mechanical Systems
X00457792-I1-MS
05/03/2021
Permit issued — General Construction
X00457742-I1-GC
04/22/2021
Permit issued — General Construction
X00457742-I1-GC
04/20/2021
Violation issued (HPD, closed)
A
03/26/2021
Permit issued — Mechanical Systems
X00457792-I1-MS
03/15/2021
Objection raised — Other
03/15/2021
Objection resolved — Addressed
03/15/2021
Objection raised — Mechanical
03/15/2021
Objection resolved — Addressed
03/15/2021
Objection raised — Scope
03/15/2021
Objection resolved — Addressed
03/11/2021
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING INCLUDING INSTALLATION OF NEW FIXTURES IN CONJUCTION WITH THE INTERIOR RENOVATION, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X00458622-I1
02/10/2021
Objection raised — Structural
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Fire_Protection
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Other
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Inspections
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Mechanical
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Other
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Inspections
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Structural
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Structural
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Scope
02/10/2021
Objection resolved — Addressed
02/10/2021
Objection raised — Structural
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFIRST STAR CONSTRUCTION *11/18/2021
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC06/30/2021
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC05/25/2021
DOB NOWMechanical SystemsSigned-offMETRO PROJECTS CONST INC05/03/2021
DOB NOWGeneral ConstructionSigned-offMETRO PROJECTS CONST INC05/03/2021
DOB NOWGeneral ConstructionSigned-offMETRO PROJECTS CONST INC04/22/2021
DOB NOWMechanical SystemsSigned-offMETRO PROJECTS CONST INC03/26/2021
BIS—ISSUEDGDI CONSTRUCTION LLC02/21/2020
BIS—ISSUEDGDI CONSTRUCTION LLC11/18/2019
BIS—ISSUEDGDI CONSTRUCTION LLC05/14/2019
BIS—ISSUEDGDI CONSTRUCTION LLC01/18/2019
BIS—ISSUEDGDI CONSTRUCTION LLC10/03/2018
BISEQISSUEDGDI CONSTRUCTION LLC10/03/2018
BISPLISSUEDARISTA PLBG & HTG CORP07/11/2018
BIS—ISSUEDGDI CONSTRUCTION LLC10/11/2017
BIS—ISSUEDGDI CONSTRUCTION LLC10/11/2017
BISEQISSUEDGDI CONSTRUCTION LLC10/03/2017
1 project · most recent 04/01/2021
General Wiring
FiledStatusContractorScope
04/01/2021CompleteFIRST STAR ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/03/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/26/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/22/2022Fire-Resistance Rated ConstructionMichael Zenreichprogress
06/22/2022Structural Stability – Alterations of existing buildingsMichael Zenreichspecial
06/22/2022Fire-Resistant Penetrations and JointsMichael Zenreichspecial
06/22/2022Lighting controlsMichael Zenreichenergy_progress
06/22/2022FinalMichael Zenreichprogress
06/22/2022Interior lighting powerMichael Zenreichenergy_progress
11/02/2021Post-installed AnchorsJong Hae Kimspecial
01/29/2021HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
01/29/2021Fire-Resistant Penetrations and JointsMatthew Bendixspecial
01/29/2021HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
01/29/2021HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
01/29/2021Maintenance informationMatthew Bendixenergy_progress
01/21/2021Fire-Resistant Penetrations and JointsMatthew Bendixspecial
01/21/2021Sprinkler SystemsMatthew Bendixspecial
01/20/2021Mechanical SystemsMatthew Bendixspecial
01/20/2021FinalMatthew Bendixprogress
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - General Construction2
08/25/2026X00457742-I1Request digital key ↗
08/14/2026X00457742-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00457792-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026X00458622-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026X00623881-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026X00458164-I1Request digital key ↗
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION13
02/24/2020220562184Open ↗
11/18/2019220562184Open ↗
08/19/2019220562184Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
08/06/2020220562184Open ↗
05/05/2020220562184Open ↗
05/04/2020220562184Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/24/2020220562184Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I: CERTIFICATION1
07/03/2017220562184Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/03/2017220562184Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/25/2020220562184Open ↗
02/07/2020220562184Open ↗
06/27/2019220562184Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00457742-P1Open ↗
08/25/2026X00457742-I1Open ↗
08/25/2026X00458164-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X00457742-I1Open ↗
08/28/2026X00458164-I1Open ↗
08/27/2026X00458622-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X00457742-I1Open ↗
09/01/2026X00457742-I1Open ↗
08/23/2026X00457792-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/17/2019220562184Open ↗
02/23/2017220562184Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
07/03/2017220562184Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
02/25/2020220562184Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/27/2017220562184Open ↗
▸BISSTREET TREE CHECKLIST1
07/03/2017220562184Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/10/2020220562184Open ↗
02/25/2020220562184Open ↗
06/27/2019220562184Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00457792-I1Open ↗
08/13/2026X00457742-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/25/2020220562184Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/25/2020220562184Open ↗
09/27/2017220562184Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/27/2017220562184Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/03/2017220562184Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSCHEDULE A - OCCUPANCY / USE8
05/05/2020220562184Open ↗
05/04/2020220562184Open ↗
04/29/2020220562184Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/28/2020220562184Open ↗
09/25/2020220562184Open ↗
05/01/2020220562184Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/22/2020220562184Open ↗
02/26/2020220562184Open ↗
02/25/2020220562184Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE6
02/24/2020220562184Open ↗
11/18/2019220562184Open ↗
08/19/2019220562184Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/03/2017220562184Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION15
08/27/2020220562184Open ↗
05/12/2020220562184Open ↗
05/01/2020220562184Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM8
05/01/2020220562184Open ↗
04/22/2020220562184Open ↗
03/31/2020220562184Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET1
02/23/2017220562184Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
02/25/2020220562184Open ↗
07/03/2017220562184Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/25/2020220562184Open ↗
▸BISFINAL - IN ACTIONS...OPEN HPD VACATE....#VAC 12/29/76 EFF: 12/30/76...SEE HPD ON 3RD FLOOR...VIOLATION MUST BE DISMISS IN BIS FOR FINAL CO1
09/28/2020220562184Open ↗