← Back
Two family frame
1029 CLARENCE AVENUE
BRONX · BIN 2130680
💬 Discuss this project
2022Year Built
3Stories
B2Building Class
R4-1Zoning
3,475 sfGross Floor Area
2Units
Two family frame · Owner of record: LAMPORT REALTY CORP · 3,892 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof2p · 2 filings · 3 docs
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLARENCE REALTY3207/08/2026
CIBOR CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CIBOR CONSTRUCTION INCGeneral Contractor1203/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
CASINO PLMBG & HTG CORPFire Protection107/08/2026
VOLTAIC SOLAIRE LLCGeneral Contractor107/08/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854106/13/2024
BRIAN E. FLYNN, PE, PC2837405/08/2024
AUTOMATED DESIGN CONSULTA895108/20/2022
Building Lifecycle
All (90)Filed (8)Permit Issued (8)Signed Off (5)Inspection (11)Objection (28)Special Inspection (30)
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2024
Signed off — Alteration
X01066194-I1
06/18/2024
Permit issued — Solar
X01066194-I1-SL
06/13/2024
Filed — Alteration
X01066194-I1
05/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN FLYNN
05/13/2024
Special inspection requirement — Shutoff dampers
BRIAN FLYNN
05/13/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BRIAN FLYNN
05/13/2024
Special inspection requirement — Final
BRIAN FLYNN
05/13/2024
Special inspection requirement — Fenestration areas
BRIAN FLYNN
05/13/2024
Special inspection requirement — Metering
BRIAN FLYNN
05/13/2024
Special inspection requirement — Heating Systems
BRIAN FLYNN
05/13/2024
Special inspection requirement — Concrete - Cast-In-Place
BRIAN FLYNN
05/13/2024
Special inspection requirement — Footing and Foundation
BRIAN FLYNN
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN FLYNN
05/13/2024
Special inspection requirement — Air barrier - visual inspection
BRIAN FLYNN
05/13/2024
Special inspection requirement — Air barrier — testing
BRIAN FLYNN
05/13/2024
Special inspection requirement — Permanent certificate
BRIAN FLYNN
05/13/2024
Special inspection requirement — Fenestration air leakage
BRIAN FLYNN
05/13/2024
Special inspection requirement — Mechanical Systems
BRIAN FLYNN
05/13/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
05/13/2024
Special inspection requirement — Structural Steel - Details
BRIAN FLYNN
05/13/2024
Special inspection requirement — Chimneys and vents
BRIAN FLYNN
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN FLYNN
05/13/2024
Special inspection requirement — Masonry
BRIAN FLYNN
05/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN FLYNN
05/13/2024
Special inspection requirement — Structural Wood Frame
BRIAN FLYNN
05/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN FLYNN
05/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN FLYNN
05/13/2024
Special inspection requirement — Maintenance information
BRIAN FLYNN
05/13/2024
Special inspection requirement — Insulation placement and R values
BRIAN FLYNN
05/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN FLYNN
05/13/2024
Special inspection requirement — Lighting controls
BRIAN FLYNN
05/13/2024
Special inspection requirement — Interior lighting power
BRIAN FLYNN
05/10/2024
Objection resolved — Addressed
05/09/2024
Objection raised — C/O of existing property requi
05/08/2024
Filed — New Building
APPLICATION HEREWTIH FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING X00625361-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00625361-P2
05/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN FLYNN
04/09/2024
Signed off — New Building
APPLICATION HEREWTIH FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING X00625361-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00625361-S3
03/27/2024
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#X00625361. The system is hydraulically calculated. There is no change in use occupancy or egress.
X00727382-I1
01/23/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2024
Permit issued — Sprinklers
X00727382-I1-EW-SP
01/09/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/08/2023
Signed off — New Building
APPLICATION HEREWTIH FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING X00625361-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00625361-S1
12/08/2023
Signed off — New Building
APPLICATION HEREWTIH FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING X00625361-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00625361-S2
10/30/2023
Permit issued — Plumbing
X00625361-S3-PL
10/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2023
Permit issued — Structural
X00625361-I1-GC-CX
05/18/2023
Permit issued — Curb Cut
X00625361-S1-CC
02/10/2023
Inspection — Pass-Final House Connection
Pass
View inspection ↗
01/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2022
Filed — New Building
APPLICATION HEREWTIH FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING X00625361-I1. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00625361-P1
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/25/2022
Permit issued — Plumbing
X00625361-S3-PL
08/20/2022
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#X00625361. The system is hydraulically calculated. There is no change in use occupancy or egress.
X00727382-I1
07/21/2022
Permit issued — Foundation
X00625361-I1-GC-CX
06/14/2022
Permit issued — Construction Fence
X00625361-S2-FN
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offVOLTAIC SOLAIRE LLC06/18/2024
DOB NOWSprinklersSigned-offCASINO PLMBG & HTG CORP01/16/2024
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC10/30/2023
DOB NOWStructuralPermit IssuedCIBOR CONSTRUCTION INC08/04/2023
DOB NOWCurb CutSigned-offCIBOR CONSTRUCTION INC05/18/2023
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP10/25/2022
DOB NOWFoundationPermit IssuedCIBOR CONSTRUCTION INC07/21/2022
DOB NOWConstruction FenceSigned-offCIBOR CONSTRUCTION INC06/14/2022
1 project · most recent 05/08/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2024Permit IssuedCIBOR CONSTRUCTION INCVentilation Systems
Ventilation
Broan LP50100DC 50 CFM · Exhaust Fan ×2
1 project · most recent 05/08/2024
Storm Water/Sanitary
FiledStatusContractorScope
05/08/2024Signed-offL.L.G. PLBG & HTG INCStorm, Water/Sanitary
2 projects · most recent 06/06/2024
General Wiring
FiledStatusContractorScope
06/06/2024CompleteBERGER QUALITY ELEC'L CON—
11/10/2022CompleteBOROWIDE ELECT'L CONTR'SGeneral Wiring
1 project · most recent 05/08/2024
Steel Wood
FiledStatusContractorScope
05/08/2024Signed-offL.L.G. PLBG & HTG INCSteel, Wood
1 project · most recent 05/08/2024
Fence
FiledStatusContractorScope
05/08/2024Signed-offL.L.G. PLBG & HTG INCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2023Pass-Final House ConnectionPassView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
05/13/2024Shutoff dampersBRIAN FLYNNenergy_progress
05/13/2024Mechanical SystemsBRIAN FLYNNspecial
05/13/2024Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
05/13/2024Heating SystemsBRIAN FLYNNspecial
05/13/2024Structural Steel - DetailsBRIAN FLYNNspecial
05/13/2024Chimneys and ventsBRIAN FLYNNspecial
05/13/2024Concrete - Cast-In-PlaceBRIAN FLYNNspecial
05/13/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN FLYNNspecial
05/13/2024Fire-Resistant Penetrations and JointsBRIAN FLYNNspecial
05/13/2024MasonryBRIAN FLYNNspecial
05/13/2024Footing and FoundationBRIAN FLYNNprogress
05/13/2024Fire-Resistance Rated ConstructionBRIAN FLYNNprogress
05/13/2024Structural Wood FrameBRIAN FLYNNprogress
05/13/2024Energy Code Compliance InspectionsBRIAN FLYNNprogress
05/13/2024FinalBRIAN FLYNNprogress
05/13/2024HVAC-R and service water heating system controlsBRIAN FLYNNenergy_progress
05/13/2024HVAC-R and service water heating equipmentBRIAN FLYNNenergy_progress
05/13/2024Fenestration and door U-factor and product ratingsBRIAN FLYNNenergy_progress
05/13/2024Air barrier - visual inspectionBRIAN FLYNNenergy_progress
05/13/2024Maintenance informationBRIAN FLYNNenergy_progress
05/13/2024Insulation placement and R valuesBRIAN FLYNNenergy_progress
05/13/2024Air barrier — testing BRIAN FLYNNenergy_progress
05/13/2024Fenestration areasBRIAN FLYNNenergy_progress
05/13/2024HVAC-R and service water piping design and insulationBRIAN FLYNNenergy_progress
05/13/2024Lighting controlsBRIAN FLYNNenergy_progress
Latest 25 of 71.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026X01051589-I1Request digital key ↗
08/24/2026X00727382-I1Request digital key ↗
08/21/2026X00625361-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/31/2023240314030Open ↗
03/28/2023240314030Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/07/2023240314030Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00625361-I1Open ↗
08/13/2026X00625361-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X00625361-P2Open ↗
08/13/2026X00625361-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/07/2023240314030Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00625361-I1Open ↗
▸Seals & Professional Certifications80
▸DOB NOWProgress Inspector Seal & Signature48
08/28/2026X00625361-P1Open ↗
08/28/2026X00625361-P1Open ↗
08/28/2026X00625361-P1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026X00727382-I1Open ↗
08/28/2026X00625361-P1Open ↗
08/28/2026X00625361-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026X00625361-S2Open ↗
08/21/2026X00625361-S1Open ↗
08/21/2026X00625361-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/25/2022240314030Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X00625361-P2Open ↗
08/13/2026X00625361-I1Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
04/04/2024240314030Open ↗
04/07/2023240314030Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026X00625361-P2Open ↗
08/13/2026X00625361-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00625361-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00625361-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00625361-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00625361-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026X00625361-P2Open ↗
08/13/2026X00625361-I1Open ↗
▸BISBPP: FIELD INSPECTION1
04/03/2024240314030Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00625361-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00625361-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01066194-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
04/03/2024240314030Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
01/25/2022240314030Open ↗
▸BISADDITIONAL INFORMATION1
04/07/2023240314030Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION4
04/03/2024240314030Open ↗
04/03/2024240314030Open ↗
04/03/2024240314030Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026X00625361-S3Open ↗
08/21/2026X00625361-P1Open ↗
08/15/2026X00625361-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026X00625361-I1Open ↗
08/13/2026X00625361-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00625361-I1Open ↗
08/13/2026X00625361-P2Open ↗
▸BISSupporting Document: Fee Exempt1
03/24/2023240314030Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00625361-I1Open ↗