← Back
BRONX
2808 DEWEY AVENUE
BRONX · BIN 2130790
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
5 Open Violations ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof1p · 1 filing · 2 docs
Floor 215p · 2 filings · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR INDUSTRIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.604/15/2026
TRINITY SOLAR LLC211/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS503/21/2026
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor903/21/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
ALL-RITE ELECT CORP OF NYElectrical103/22/2026
TRINITY SOLAR LLCGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177304/15/2026
BITOPI CONSULTANTS LLC7036211/17/2025
Building Lifecycle
All (118)Filed (8)Permit Issued (5)Signed Off (5)Violation (6)Inspection (10)Objection (54)Special Inspection (30)
08/06/2026
Violation issued (ECB, open)
Unknown
08/06/2026
Violation issued (ECB, open)
Construction
08/06/2026
Violation issued (ECB, open)
Unknown
08/06/2026
Violation issued (ECB, open)
Construction
08/06/2026
Violation issued (ECB, open)
Construction
06/10/2026
Signed off — New Building
PROPOSED 2 STORY, 2 FAMILY DWELLING FRAME BUILDING WITH CELLAR
X08035291-I1
05/20/2026
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/20/2026
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Protection of exposed foundation insulation
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
05/20/2026
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
04/15/2026
Filed — New Building
PROPOSED 2 STORY, 2 FAMILY DWELLING FRAME BUILDING WITH CELLAR
X08035291-P2
12/30/2025
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
X01215389-I1
11/17/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
X01215389-P1
05/01/2025
Permit issued — Solar
X01215389-I1-SL
04/25/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
X01215389-I1
11/29/2024
Signed off — Alteration
Installation of new curb cut in conjunction with new building application # X08035291
X00804169-I1
10/24/2024
Signed off — Alteration
Application filed for Installation of plumbing fixtures and related piping in conjunction with new building application # X08035291
X00804167-I1
10/23/2024
Signed off — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # X-08035291-I1
X00804166-I1
09/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2024
Objection resolved — Addressed
08/08/2024
Objection raised — Admin
08/02/2024
Filed — New Building
PROPOSED 2 STORY, 2 FAMILY DWELLING FRAME BUILDING WITH CELLAR
X08035291-P1
04/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/02/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/01/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/08/2023
Permit issued — Plumbing
X00804167-I1-PL
10/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2023
Objection raised — Admin
10/24/2023
Objection resolved — Addressed
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC05/01/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC11/08/2023
DOB NOWStructuralPermit IssuedPRECISION HOME DEV INC08/24/2023
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC08/03/2023
DOB NOWConstruction FenceSigned-offSTELLAR INDUSTRIES INC03/02/2023
1 project · most recent 04/15/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026Permit IssuedPRECISION HOME DEV INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-8C48NAHZ 54,000 BTU · Heat Pump Outdoor ×9
Ventilation
Delta SLM 50 50 CFM ×15
Air King ESDQ 150 CFM · Exhaust Fan ×6
2 projects · most recent 04/14/2025
General Wiring
FiledStatusContractorScope
04/14/2025CompleteALL-RITE ELECT CORP OF NYGeneral Wiring
12/25/2024CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 04/15/2026
Concrete Wood
FiledStatusContractorScope
04/15/2026Permit IssuedPRECISION HOME DEV INCConcrete, Wood
1 project · most recent 04/15/2026
Earthwork
FiledStatusContractorScope
04/15/2026Permit IssuedPRECISION HOME DEV INCEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/01/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
05/20/2026FinalNAVEEN KUMARprogress
05/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
05/20/2026Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
05/20/2026Heating SystemsPIROOZ SOLTANIZADEHspecial
05/20/2026Mechanical SystemsPIROOZ SOLTANIZADEHspecial
05/20/2026Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
05/20/2026Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
05/20/2026MasonryPIROOZ SOLTANIZADEHspecial
05/20/2026Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
05/20/2026Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
05/20/2026Footing and FoundationPIROOZ SOLTANIZADEHprogress
05/20/2026Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
05/20/2026Structural Wood FramePIROOZ SOLTANIZADEHprogress
05/20/2026MeteringPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
05/20/2026HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
05/20/2026HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Duct leakage testing, insulation and designPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
05/20/2026Protection of exposed foundation insulationPIROOZ SOLTANIZADEHenergy_progress
05/20/2026HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 64.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026X00804169-I1Request digital key ↗
08/22/2026X00804167-I1Request digital key ↗
08/21/2026X08035291-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
09/28/2023240348806Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X08035291-P1Open ↗
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X08035291-P2Open ↗
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X08035291-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026X08035291-I1Open ↗
09/02/2026X08035291-I1Open ↗
09/02/2026X08035291-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026X00804166-I1Open ↗
08/22/2026X00804169-I1Open ↗
08/22/2026X00804167-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026X08035291-I1Open ↗
09/01/2026X01215389-P1Open ↗
08/25/2026X08035291-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/28/2023240348806Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X08035291-P1Open ↗
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P2Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/13/2026X08035291-P1Open ↗
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P2Open ↗
▸BISSTREET TREES SITE PLAN1
11/15/2024240348806Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/28/2023240348806Open ↗
▸BISSTREET TREE CHECKLIST1
09/28/2023240348806Open ↗
▸BISSTREET TREE SIGNOFF1
11/15/2024240348806Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X08035291-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X08035291-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X08035291-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01215389-I1Open ↗
08/13/2026X01215389-P1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P1Open ↗
08/13/2026X08035291-P2Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/19/2024240348806Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01215389-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/28/2023240348806Open ↗
▸BISADDITIONAL INFORMATION1
09/28/2023240348806Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P1Open ↗
08/13/2026X08035291-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X08035291-P2Open ↗
08/13/2026X08035291-I1Open ↗
08/13/2026X08035291-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026X08035291-P2Open ↗
08/21/2026X08035291-I1Open ↗
08/21/2026X08035291-P1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/28/2023240348806Open ↗
▸DOB NOWFinal Survey1
08/13/2026X08035291-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X08035291-I1Open ↗