← Back
Parks / recreation facility
Orchard Beach Bath House and Promenade
PELHAM BAY PARK · BIN 2130839
💬 Discuss this project
1935Year Built
6Stories
Q1Building Class
PARKZoning
270,021 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 0 unresolved · 8 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 74,250,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction42p · 2 filings · 20 docs
1 job · most recent 04/23/2026
FiledStatusContractorScope
04/23/2026——84 heads
1 job · most recent 07/21/2026
Steel
FiledStatusContractorScope
07/21/2026Permit IssuedJRCRUZ CORPSteel
Building Lifecycle
All (110)Filed (7)Permit Issued (6)Inspection (3)Objection (64)Special Inspection (30)
08/11/2026
Permit issued — General Construction
X08033167-I1-GC
08/11/2026
Permit issued — Structural
X08033167-S2-ST
08/11/2026
Permit issued — Foundation
X08033167-S1-FO
08/06/2026
Permit issued — General Construction
X08033167-I1-GC
07/28/2026
Special inspection requirement — Masonry
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Subgrade Inspections
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Vertical Masonry Foundation Elements
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Preliminary
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Luminous Exit Path Markings
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Lowest Floor Elevation
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Air barrier - visual inspection
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Concrete - Precast
SAMUEL BAUTISTA
07/28/2026
Special inspection requirement — Fenestration air leakage
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Insulation placement and R values
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Metering
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Exterior lighting power
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Fenestration areas
EDWIN DEGUZMAN
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMUEL BAUTISTA
07/21/2026
Filed — New Building
New 1 story building frame with Steel.
X08033167-P1
05/03/2026
Special inspection requirement — Post-installed Anchors
SAMUEL BAUTISTA
05/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMUEL BAUTISTA
05/03/2026
Special inspection requirement — Sprinkler Systems
EDWIN DEGUZMAN
04/23/2026
Filed — Alteration
New Installation of sprinkler heads as per plans filed herewith.
X08026700-P1
12/30/2025
Permit issued — General Construction
X08033167-I1-GC
12/22/2025
Permit issued — Mechanical Systems
X08033167-S3-MS
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Special inspection requirement — Vertical Masonry Foundation Elements
SAMUEL BAUTISTA
10/02/2025
Special inspection requirement — Subgrade Inspections
SAMUEL BAUTISTA
10/02/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
10/02/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SAMUEL BAUTISTA
10/02/2025
Special inspection requirement — Masonry
SAMUEL BAUTISTA
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/23/2022
Objection raised — Inspections
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Structural
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Admin
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Structural
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Structural
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Scope
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Other
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Admin
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Structural
11/23/2022
Objection resolved — Addressed
11/23/2022
Objection raised — Structural
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCDDC109/01/2026
DEPT OF DESIGN CONSTRUCTION1808/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SMITH-MILLER+HAWKINSON ARCHITECTS207/21/2026
ADS ENGINEERS304/23/2026
ROBERT SILMAN ASSOC STRUCT ENG DPC211/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRCRUZ CORPGeneral Contractor708/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY CONTROL LABORATOR406707/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJRCRUZ CORP08/11/2026
DOB NOWStructuralPermit IssuedJRCRUZ CORP08/11/2026
DOB NOWFoundationPermit IssuedJRCRUZ CORP08/11/2026
DOB NOWGeneral ConstructionPermit IssuedJRCRUZ CORP08/06/2026
DOB NOWGeneral ConstructionPermit IssuedJRCRUZ CORP12/30/2025
DOB NOWMechanical SystemsPermit IssuedJRCRUZ CORP12/22/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
07/28/2026Concrete - Cast-In-PlaceSAMUEL BAUTISTAspecial
07/28/2026Subgrade InspectionsSAMUEL BAUTISTAspecial
07/28/2026Concrete - PrecastSAMUEL BAUTISTAspecial
07/28/2026Vertical Masonry Foundation ElementsSAMUEL BAUTISTAspecial
07/28/2026Wall Panels, Curtain Walls, and VeneersSAMUEL BAUTISTAspecial
07/28/2026PreliminarySAMUEL BAUTISTAprogress
07/28/2026Fire-Resistance Rated ConstructionSAMUEL BAUTISTAprogress
07/28/2026Energy Code Compliance InspectionsEDWIN DEGUZMANprogress
07/28/2026Lowest Floor ElevationSAMUEL BAUTISTAprogress
07/28/2026Protection of exposed foundation insulationEDWIN DEGUZMANenergy_progress
07/28/2026Air barrier - visual inspectionEDWIN DEGUZMANenergy_progress
07/28/2026Fenestration air leakageEDWIN DEGUZMANenergy_progress
07/28/2026Insulation placement and R valuesEDWIN DEGUZMANenergy_progress
07/28/2026MasonrySAMUEL BAUTISTAspecial
07/28/2026Fenestration and door U-factor and product ratingsEDWIN DEGUZMANenergy_progress
07/28/2026MeteringEDWIN DEGUZMANenergy_progress
07/28/2026Maintenance informationEDWIN DEGUZMANenergy_progress
07/28/2026Exterior lighting powerEDWIN DEGUZMANenergy_progress
07/28/2026Fenestration areasEDWIN DEGUZMANenergy_progress
07/28/2026Mastic and Intumescent Fire-resistant CoatingsSAMUEL BAUTISTAspecial
07/28/2026Luminous Exit Path MarkingsSAMUEL BAUTISTAspecial
07/28/2026Sprayed fire-resistant materialsSAMUEL BAUTISTAspecial
05/03/2026Fire-Resistant Penetrations and JointsSAMUEL BAUTISTAspecial
05/03/2026Post-installed AnchorsSAMUEL BAUTISTAspecial
05/03/2026Sprinkler SystemsEDWIN DEGUZMANspecial
Latest 25 of 63.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026X08033167-P1Request digital key ↗
08/23/2026X08033167-P2Request digital key ↗
08/23/2026X08033167-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
08/13/2026X08033167-I1Open ↗
08/13/2026X08033167-P1Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X08033167-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026X08033167-P1Open ↗
09/01/2026X08033167-P1Open ↗
09/01/2026X08033167-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/01/2026X08033167-P1Open ↗
09/01/2026X08033167-P1Open ↗
09/01/2026X08033167-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026X08033167-S3Open ↗
08/23/2026X08033167-I1Open ↗
08/23/2026X08033167-P2Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X08033167-I1Open ↗
08/13/2026X08033167-P1Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026X08033167-P2Open ↗
08/13/2026X08033167-S2Open ↗
08/13/2026X08033167-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026X08026700-I1Open ↗
08/13/2026X08033167-I1Open ↗
08/13/2026X08033167-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026X08033167-P1Open ↗
08/13/2026X08033167-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X08033167-I1Open ↗
08/13/2026X08033167-P1Open ↗