← Back
BRONX
149 REVERE AVENUE
BRONX · BIN 2130901
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Architecture
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DP GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT908/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STACIE SCORCIA COMPANY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.P. GROUP GENERAL CONTRAGeneral Contractor407/08/2026
BAYSIDE ELEC'L CONT. CORPElectrical103/22/2026
MJ GENERAL MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864708/04/2025
Building Lifecycle
All (106)Filed (9)Permit Issued (3)Signed Off (3)Inspection (9)Objection (52)Special Inspection (30)
08/14/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
08/14/2025
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN GOMEZ
08/14/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
08/14/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
08/14/2025
Special inspection requirement — Footing and Foundation
JUAN GOMEZ
08/14/2025
Special inspection requirement — Structural Wood Frame
JUAN GOMEZ
08/14/2025
Special inspection requirement — Final
JUAN GOMEZ
08/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
08/14/2025
Special inspection requirement — Interior lighting power
JUAN GOMEZ
08/14/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/14/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
08/14/2025
Special inspection requirement — Metering
JUAN GOMEZ
08/14/2025
Special inspection requirement — Electric vehicle service equipment requirements
JUAN GOMEZ
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
08/14/2025
Special inspection requirement — Permanent certificate
JUAN GOMEZ
08/14/2025
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
08/14/2025
Special inspection requirement — Ventilation and air distribution system
JUAN GOMEZ
08/14/2025
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
08/14/2025
Special inspection requirement — Fenestration areas
JUAN GOMEZ
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
JUAN GOMEZ
08/14/2025
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
08/14/2025
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
08/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
08/14/2025
Special inspection requirement — Air barrier — testing
JUAN GOMEZ
08/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-P5
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-P4
01/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-S1
09/05/2024
Permit issued — Plumbing
X00541612-S1-PL
02/06/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-S2
01/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/09/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/22/2023
Permit issued — Curb Cut
X00541612-S2-CC
08/14/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-P3
07/28/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS HEREWITH FILED IN CONJUNCTION WITH JOB NUMBERS X00575900, X00575788 & X00541612.
X00442618-I1
07/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/14/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-P1
05/31/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-P2
05/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/31/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/31/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed for an 5'-7" curb cut. Filing in conjunction with ALT 1 application X00541612-I1 . No change in bulk, occupancy, use or egress.
X00541612-S2
10/12/2022
Objection resolved — Addressed
10/11/2022
Permit issued — General Construction
X00541612-I1-GC-CX
10/11/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
10/10/2022
Objection resolved — Addressed
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC09/05/2024
DOB NOWCurb CutSigned-offD.P. GROUP GENERAL CONTRA12/22/2023
DOB NOWGeneral ConstructionPermit IssuedD.P. GROUP GENERAL CONTRA10/11/2022
1 project · most recent 08/04/2025
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2025Signed-offD.P. GROUP GENERAL CONTRAHeating Systems, Ventilation Systems
Heating
Luxaire TM8E120C16MP11B 96,000 BTU · Furnace ×6
Ventilation
Broan-Nutone HB80RL 50 CFM · Exhaust Fan ×6
1 project · most recent 08/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/04/2025Signed-offMJ GENERAL MECHANICAL LLCGas, Storm, Water/Sanitary
1 project · most recent 02/05/2023
General Wiring
FiledStatusContractorScope
02/05/2023CompleteBAYSIDE ELEC'L CONT. CORPGeneral Wiring
1 project · most recent 08/04/2025
Wood
FiledStatusContractorScope
08/04/2025Signed-offMJ GENERAL MECHANICAL LLCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/09/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
07/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/31/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
08/14/2025Concrete - Cast-In-PlaceJUAN GOMEZspecial
08/14/2025Subsurface Investigations (Borings/Test Pits)Bin Lispecial
08/14/2025Mechanical SystemsJUAN GOMEZspecial
08/14/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/14/2025Structural Stability – Alterations of existing buildingsJUAN GOMEZspecial
08/14/2025Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
08/14/2025Heating SystemsJUAN GOMEZspecial
08/14/2025Footing and FoundationJUAN GOMEZprogress
08/14/2025Structural Wood FrameJUAN GOMEZprogress
08/14/2025FinalJUAN GOMEZprogress
08/14/2025Fire-Resistance Rated ConstructionJUAN GOMEZprogress
08/14/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
08/14/2025Interior lighting powerJUAN GOMEZenergy_progress
08/14/2025Maintenance informationJUAN GOMEZenergy_progress
08/14/2025Air barrier — testing JUAN GOMEZenergy_progress
08/14/2025MeteringJUAN GOMEZenergy_progress
08/14/2025Electric vehicle service equipment requirementsJUAN GOMEZenergy_progress
08/14/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/14/2025Permanent certificateJUAN GOMEZenergy_progress
08/14/2025Air barrier - visual inspectionJUAN GOMEZenergy_progress
08/14/2025Ventilation and air distribution systemJUAN GOMEZenergy_progress
08/14/2025Insulation placement and R valuesJUAN GOMEZenergy_progress
08/14/2025Fenestration areasJUAN GOMEZenergy_progress
08/14/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
08/14/2025Duct leakage testing, insulation and designJUAN GOMEZenergy_progress
Latest 25 of 105.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/23/2026X00541612-P3Request digital key ↗
08/23/2026X00541612-P4Request digital key ↗
08/23/2026X00541612-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/24/2026X00442618-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X00541612-I1Open ↗
▸Seals & Professional Certifications114
▸DOB NOWProgress Inspector Seal & Signature78
09/02/2026X00541612-I1Open ↗
09/02/2026X00541612-I1Open ↗
09/02/2026X00541612-I1Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/02/2026X00541612-I1Open ↗
09/02/2026X00541612-I1Open ↗
09/02/2026X00541612-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P3Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Sign Off1
08/15/2026X00541612-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X00541612-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026X00541612-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026X00541612-I1Open ↗
08/14/2026X00541612-S1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026X00541612-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/23/2026X00541612-P5Open ↗
08/23/2026X00541612-P4Open ↗
08/23/2026X00541612-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/15/2026X00541612-I1Open ↗