Unlicensed parking lot
282 EAST 164TH STREET
BRONX · BIN 2131051
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: EAST 164 PROPERTY LLC · 3,901 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing
Bulkhead1p · 1 filing
Floor 61p · 1 filing
Floor 5
Floor 4
Floor 31p · 1 filing
Floor 21p · 1 filing
Floor 11p · 1 filing
Cellar1p · 1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS310/10/2025
Building Lifecycle
All (34)Filed (3)Objection (1)Special Inspection (30)
10/10/2025
Filed — New Building
Provide new plumbing and sprinkler system in conjunction with NB# X01213596.
X01213596-S3
07/10/2025
Filed — New Building
Provide new plumbing and sprinkler system in conjunction with NB# X01213596.
X01213596-S2
07/10/2025
Special inspection requirement — Shutoff dampers
07/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/10/2025
Special inspection requirement — Electrical motors and elevators
07/10/2025
Special inspection requirement — Maintenance information
07/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
07/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2025
Objection raised — Admin
05/01/2025
Filed — New Building
Provide new plumbing and sprinkler system in conjunction with NB# X01213596.
X01213596-I1
04/24/2025
Special inspection requirement — Mechanical Systems
04/24/2025
Special inspection requirement — Final
04/21/2025
Special inspection requirement — Structural Steel - Welding
04/21/2025
Special inspection requirement — Subgrade Inspections
04/21/2025
Special inspection requirement — Final
04/21/2025
Special inspection requirement — Footing and Foundation
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
04/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
04/21/2025
Special inspection requirement — Interior lighting power
04/21/2025
Special inspection requirement — Electrical motors and elevators
04/21/2025
Special inspection requirement — Lighting controls
04/21/2025
Special inspection requirement — Lighting in dwelling units
04/21/2025
Special inspection requirement — Exterior lighting power
04/21/2025
Special inspection requirement — Maintenance information
04/21/2025
Special inspection requirement — Air barrier — testing
04/21/2025
Special inspection requirement — Permanent certificate
04/21/2025
Special inspection requirement — Fenestration air leakage
04/21/2025
Special inspection requirement — Vestibules
04/21/2025
Special inspection requirement — Air barrier - visual inspection
04/21/2025
Special inspection requirement — Fenestration areas
04/21/2025
Special inspection requirement — Air barrier continuity plan testing
04/21/2025
Special inspection requirement — Insulation placement and R values
Nothing on file for this building.
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Amana PTH123 12,000 BTU · Ptac ×20
PTH093 9,000 BTU · Ptac ×15
Ventilation
Floaire ×10
1 project · most recent 10/10/2025
Sprinkler System
FiledStatusContractorScope
10/10/2025——Sprinkler System
1 project · most recent 10/10/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/10/2025——Storm, Water/Sanitary
1 project · most recent 10/10/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/10/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
07/10/2025Shutoff dampers—energy_progress
07/10/2025HVAC-R and service water heating equipment—energy_progress
07/10/2025Electrical motors and elevators—energy_progress
07/10/2025Maintenance information—energy_progress
07/10/2025Duct leakage testing, insulation and design—energy_progress
07/10/2025HVAC-R and service water piping design and insulation—energy_progress
07/10/2025HVAC-R and service water heating system controls—energy_progress
04/24/2025Mechanical Systems—special
04/24/2025Final—progress
04/21/2025Structural Steel - Welding—special
04/21/2025Subgrade Inspections—special
04/21/2025Final—progress
04/21/2025Footing and Foundation—progress
04/21/2025Energy Code Compliance Inspections—progress
04/21/2025Fire-Resistance Rated Construction—progress
04/21/2025Fenestration and door U-factor and product ratings—energy_progress
04/21/2025Interior lighting power—energy_progress
04/21/2025Electrical motors and elevators—energy_progress
04/21/2025Lighting controls—energy_progress
04/21/2025Lighting in dwelling units—energy_progress
04/21/2025Exterior lighting power—energy_progress
04/21/2025Maintenance information—energy_progress
04/21/2025Air barrier — testing —energy_progress
04/21/2025Permanent certificate—energy_progress
04/21/2025Fenestration air leakage—energy_progress
Latest 25 of 38.
Nothing on file for this building.