← Back
Professional building / stand-alone funeral home
4133 3 AVENUE
BRONX · BIN 2131116
💬 Discuss this project
1931Year Built
1Stories
O7Building Class
M1-4/R7XZoning
7,592 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 4119 THIRD LLC · 8,858 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 9 docs
Bulkhead1p · 1 filing · 9 docs
Floor 152p · 1 filing · 9 docs
Floor 141p · 1 filing · 9 docs
Floor 131p · 1 filing · 9 docs
Floor 12
Floor 111p · 1 filing · 9 docs
Floor 101p · 1 filing · 9 docs
Floor 91p · 1 filing · 9 docs
Floor 81p · 1 filing · 9 docs
Floor 71p · 1 filing · 9 docs
Floor 61p · 1 filing · 9 docs
Floor 51p · 1 filing · 9 docs
Floor 41p · 1 filing · 9 docs
Floor 31p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 11p · 1 filing · 9 docs
CellarUnder Construction2p · 2 filings · 12 docs
1 job · most recent 04/22/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Amana PTH123G50AXXX 12,000 BTU · Ptac ×100
PTH073G35AXXX 7,600 BTU · Ptac ×98
Heating
Cadet CEC163TW 5,115 BTU · Electric Heater ×22
Ventilation
Fantech FG 4XL VG INLINE FAN 50 CFM · Exhaust Fan ×99
FIT120E-D-EC-HC-ERV 129 CFM · Erv ×1
Broan SERIES 433001 150 CFM · Kitchen Exhaust ×99
Greenheck ERV-20-15L 960 CFM · Erv ×1
1 job · most recent 03/09/2026
Concrete
FiledStatusContractorScope
03/09/2026——Concrete
Building Lifecycle
All (41)Filed (4)Permit Issued (1)Objection (6)Special Inspection (30)
04/22/2026
Filed — Alteration
Install mechanical systems in conjunction with GC (-I1) application X01228107-I1. There is no change in use, occupancy, or egress.
X01389617-I1
04/20/2026
Special inspection requirement — Final
04/20/2026
Special inspection requirement — Mechanical Systems
04/20/2026
Special inspection requirement — Ventilation and air distribution system
04/20/2026
Special inspection requirement — Shutoff dampers
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/20/2026
Special inspection requirement — Maintenance information
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
04/15/2026
Objection resolved — Resolved
03/19/2026
Permit issued — Foundation
X01284748-I1-FO
03/17/2026
Objection raised — Admin
03/17/2026
Objection raised — Admin
03/09/2026
Filed — New Building
New 15 Story Residential Building
X01228107-S4
03/08/2026
Special inspection requirement — Concrete - Cast-In-Place
03/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/04/2025
Special inspection requirement — Final
10/31/2025
Objection raised — Admin
10/31/2025
Objection resolved — Addressed
10/30/2025
Objection raised — Admin
10/24/2025
Filed — New Building
New 15 Story Residential Building
X01228107-I1
09/15/2025
Filed — Alteration
X01284748-I1
07/07/2025
Special inspection requirement — Metering
07/07/2025
Special inspection requirement — Fenestration air leakage
07/07/2025
Special inspection requirement — Permanent certificate
07/07/2025
Special inspection requirement — Insulation placement and R values
07/07/2025
Special inspection requirement — Protection of exposed foundation insulation
07/07/2025
Special inspection requirement — Air barrier - visual inspection
07/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/07/2025
Special inspection requirement — Interior lighting power
07/07/2025
Special inspection requirement — Maintenance information
07/07/2025
Special inspection requirement — Air barrier — testing
07/07/2025
Special inspection requirement — Exterior lighting power
07/07/2025
Special inspection requirement — Fenestration areas
07/07/2025
Special inspection requirement — Lighting in dwelling units
07/07/2025
Special inspection requirement — Lighting controls
07/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
07/07/2025
Special inspection requirement — Electrical motors and elevators
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RBA DEVELOPERS804/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STARK EXPEDITING GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & R HOME IMPROVEMENT &General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232109/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedA & R HOME IMPROVEMENT &03/19/2026
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/20/2026Final—progress
04/20/2026Mechanical Systems—special
04/20/2026Ventilation and air distribution system—energy_progress
04/20/2026Shutoff dampers—energy_progress
04/20/2026HVAC-R and service water heating system controls—energy_progress
04/20/2026HVAC-R and service water heating equipment—energy_progress
04/20/2026Maintenance information—energy_progress
04/20/2026HVAC-R and service water piping design and insulation—energy_progress
04/20/2026Energy Code Compliance Inspections—progress
03/08/2026Concrete - Cast-In-Place—special
03/08/2026Structural Stability – Alterations of existing buildings—special
11/04/2025Final—progress
07/07/2025Metering—energy_progress
07/07/2025Fenestration air leakage—energy_progress
07/07/2025Permanent certificate—energy_progress
07/07/2025Insulation placement and R values—energy_progress
07/07/2025Protection of exposed foundation insulation—energy_progress
07/07/2025Air barrier - visual inspection—energy_progress
07/07/2025Fenestration and door U-factor and product ratings—energy_progress
07/07/2025Interior lighting power—energy_progress
07/07/2025Maintenance information—energy_progress
07/07/2025Air barrier — testing —energy_progress
07/07/2025Exterior lighting power—energy_progress
07/07/2025Fenestration areas—energy_progress
07/07/2025Lighting in dwelling units—energy_progress
Latest 25 of 30.
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026X01284748-I1Request digital key ↗
08/18/2026X01228107-I1Request digital key ↗
08/18/2026X01228107-S4Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/18/2026X01228107-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026X01228107-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026X01284748-I1Open ↗
08/18/2026X01228107-S4Open ↗
08/18/2026X01228107-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/18/2026X01228107-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/13/2026X01284748-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/18/2026X01228107-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/18/2026X01228107-I1Open ↗