← Back
Zoned residential, not Manhattan
819 EAST 228 STREET
BRONX · BIN 2131148
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
3 Open Violations ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: MAJOR DEVELOPMENT 52 CORP. · 5,721 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 7 docs
Floor 32p · 1 filing · 7 docs
Floor 2
Floor 11p · 1 filing
2 jobs · most recent 07/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026——Heating and Air Conditioning Systems, Ventilation Systems—
09/10/2025——Heating and Air Conditioning Systems
Heat / Cool
2 jobs · most recent 07/28/2026
Wood Concrete Steel Masonry
FiledStatusContractorScope
07/28/2026——Concrete, Wood
09/10/2025——Steel, Masonry, Wood
Building Lifecycle
All (33)Filed (3)Objection (3)Special Inspection (27)
08/26/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
07/28/2026
Filed — New Building
NEW 3-STORY 3-FAMILY HOUSE
X01434612-I1
02/03/2026
Filed — New Building
X01334600-I1
09/25/2025
Objection raised — Admin
09/10/2025
Filed — New Building
NEW 2-STORY 2-FAMILY SEMI-DETACHED HOUSE WITH ANCILLARY DWELLING UNIT IN THE CELLAR
X01256390-I1
07/18/2025
Special inspection requirement — Structural Steel - Details
07/18/2025
Special inspection requirement — Masonry
07/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2025
Special inspection requirement — Heating Systems
07/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/16/2025
Special inspection requirement — Subgrade Inspections
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/16/2025
Special inspection requirement — Concrete - Cast-In-Place
07/16/2025
Special inspection requirement — Ventilation and air distribution system
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/16/2025
Special inspection requirement — Air barrier — testing
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
OLABANJI AWOSIKA
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
OLABANJI AWOSIKA
07/16/2025
Special inspection requirement — Preliminary
OLABANJI AWOSIKA
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/16/2025
Special inspection requirement — Air barrier - visual inspection
07/16/2025
Special inspection requirement — Metering
07/16/2025
Special inspection requirement — Insulation placement and R values
07/16/2025
Special inspection requirement — Fenestration areas
07/16/2025
Special inspection requirement — Interior lighting power
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/16/2025
Special inspection requirement — Fenestration air leakage
07/16/2025
Special inspection requirement — Permanent certificate
07/15/2025
Special inspection requirement — Final
OLABANJI AWOSIKA
07/15/2025
Special inspection requirement — Footing and Foundation
OLABANJI AWOSIKA
07/15/2025
Special inspection requirement — Mechanical Systems
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2018$420K—Private party → MAJOR DEVELOPMENT 52 CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANJI AWOSIKA ARCHITECT P.C.207/28/2026
OLABANJI AWOSIKA102/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BANJI ARCHITECT PC403/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/18/2025Structural Steel - Details—special
07/18/2025Masonry—special
07/16/2025Excavations - Sheeting, Shoring, and Bracing—special
07/16/2025Fire-Resistant Penetrations and Joints—special
07/16/2025Heating Systems—special
07/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/16/2025Subgrade Inspections—special
07/16/2025Fenestration and door U-factor and product ratings—energy_progress
07/16/2025Concrete - Cast-In-Place—special
07/16/2025Ventilation and air distribution system—energy_progress
07/16/2025HVAC-R and service water heating system controls—energy_progress
07/16/2025Air barrier — testing —energy_progress
07/16/2025Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
07/16/2025Fire-Resistance Rated ConstructionOLABANJI AWOSIKAprogress
07/16/2025PreliminaryOLABANJI AWOSIKAprogress
07/16/2025HVAC-R and service water piping design and insulation—energy_progress
07/16/2025Air barrier - visual inspection—energy_progress
07/16/2025Metering—energy_progress
07/16/2025Insulation placement and R values—energy_progress
07/16/2025Fenestration areas—energy_progress
07/16/2025Interior lighting power—energy_progress
07/16/2025HVAC-R and service water heating equipment—energy_progress
07/16/2025Fenestration air leakage—energy_progress
07/16/2025Permanent certificate—energy_progress
07/15/2025FinalOLABANJI AWOSIKAprogress
Latest 25 of 27.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01434612-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026X01434612-I1Open ↗
08/13/2026X01334600-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026X01434612-I1Open ↗
08/13/2026X01334600-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01434612-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026X01434612-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial2
08/16/2026X01434612-I1Open ↗
08/13/2026X01334600-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026X01434612-I1Open ↗