← Back
Auto body / collision or auto repair
BOONE AVENUE
BRONX · BIN 2131170
💬 Discuss this project
0Year Built
—Stories
G2Building Class
R6AZoning
10,000 sfGross Floor Area
2Units
0 Open Violations
Auto body / collision or auto repair · Owner of record: 173RD OWNER LLC · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof9p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 78p · 1 filing · 20 docs
Floor 67p · 1 filing · 20 docs
Floor 56p · 1 filing · 20 docs
Floor 46p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar9p · 2 filings · 20 docs
1 job · most recent 04/22/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Samsung ×58
Heating
Samsung ×58
1 job · most recent 04/22/2026
Sprinkler System
FiledStatusContractorScope
04/22/2026——Sprinkler System
1 job · most recent 04/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/22/2026——Gas, Storm, Water/Sanitary
1 job · most recent 01/06/2026
General Wiring
FiledStatusContractorScope
01/06/2026Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
3 jobs · most recent 04/22/2026
FiledStatusContractorScope
04/22/2026——2 scope_items
01/07/2026——2 scope_items
11/19/2025——1 scope_items
Building Lifecycle
All (57)Filed (10)Permit Issued (1)Violation (6)Objection (10)Special Inspection (30)
06/03/2026
Objection raised — Other
04/22/2026
Filed — New Building
Sprinkler Work Type filed
X01288603-S6
04/22/2026
Filed — New Building
Sprinkler Work Type filed
X01288603-S5
04/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/25/2026
Objection resolved — Addressed
02/25/2026
Special inspection requirement — Post-installed Anchors
02/11/2026
Objection resolved — Resolved
02/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/22/2026
Objection resolved — Resolved
01/21/2026
Special inspection requirement — Maintenance information
01/21/2026
Special inspection requirement — Protection of exposed foundation insulation
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/21/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/17/2026
Objection raised — Admin
01/07/2026
Filed — Alteration
SOE FILED IN CONJUNCTION WITH THE NEW BUILDING APPLICATION #X01288603-I1
X01339035-I1
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
01/06/2026
Special inspection requirement — Maintenance information
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
12/26/2025
Objection resolved — Addressed
12/16/2025
Objection raised — Other
12/08/2025
Special inspection requirement — Fenestration air leakage
12/08/2025
Special inspection requirement — Fenestration areas
12/08/2025
Special inspection requirement — Insulation placement and R values
12/08/2025
Special inspection requirement — Air barrier - visual inspection
12/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/27/2025
Special inspection requirement — Heating Systems
11/27/2025
Special inspection requirement — Energy Code Compliance Inspections
11/27/2025
Special inspection requirement — Maintenance information
11/26/2025
Special inspection requirement — Post-installed Anchors
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/19/2025
Filed — Alteration
FOUNDATION EARTHWORK FIELD IN CONJUNCTION WITH NEW BUILDING APPLICATION #X01288603-I1
X01306200-I1
11/13/2025
Objection raised — Other
11/13/2025
Objection raised — Other
11/13/2025
Objection raised — Other
11/05/2025
Permit issued — Construction Fence
X01307909-I1-FN
10/27/2025
Filed — New Building
Sprinkler Work Type filed
X01288603-S3
10/27/2025
Filed — New Building
Sprinkler Work Type filed
X01288603-S1
10/27/2025
Filed — New Building
Sprinkler Work Type filed
X01288603-S2
10/27/2025
Filed — Alteration
X01307909-I1
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/27/2025
Special inspection requirement — Shutoff dampers
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/23/2025
Filed — New Building
Sprinkler Work Type filed
X01288603-S4
10/17/2025
Filed — New Building
Sprinkler Work Type filed
X01288603-I1
09/12/2014
Violation issued (ECB, closed)
Construction
07/25/2014
Violation issued (ECB, closed)
Construction
09/20/2006
Violation issued (ECB, closed)
Construction
06/23/2006
Violation issued (ECB, closed)
Construction
01/25/2006
Violation issued (ECB, closed)
Construction
09/21/2005
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VAJA GROUP1909/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY WIDE BUILDERS GRP INGeneral Contractor104/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedCITY WIDE BUILDERS GRP IN11/05/2025
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
04/22/2026Excavations - Sheeting, Shoring, and Bracing—special
02/25/2026Post-installed Anchors—special
02/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/21/2026Maintenance information—energy_progress
01/21/2026Protection of exposed foundation insulation—energy_progress
01/21/2026Fire-Resistant Penetrations and Joints—special
01/21/2026Exterior Insulation and Finish Systems (EIFS)—special
01/21/2026Energy Code Compliance Inspections—progress
01/21/2026Fire-Resistance Rated Construction—progress
01/06/2026HVAC-R and service water heating system controls—energy_progress
01/06/2026Fire-Resistant Penetrations and Joints—special
01/06/2026Energy Code Compliance Inspections—progress
01/06/2026Maintenance information—energy_progress
01/06/2026HVAC-R and service water piping design and insulation—energy_progress
01/06/2026HVAC-R and service water heating equipment—energy_progress
12/08/2025Fenestration air leakage—energy_progress
12/08/2025Fenestration areas—energy_progress
12/08/2025Insulation placement and R values—energy_progress
12/08/2025Air barrier - visual inspection—energy_progress
12/08/2025Fenestration and door U-factor and product ratings—energy_progress
11/27/2025Fire-Resistant Penetrations and Joints—special
11/27/2025Heating Systems—special
11/27/2025Energy Code Compliance Inspections—progress
11/27/2025Maintenance information—energy_progress
11/26/2025Post-installed Anchors—special
Latest 25 of 42.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/18/2026X01307909-I1Request digital key ↗
08/17/2026X01306200-I1Request digital key ↗
08/17/2026X01339035-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026X01288603-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X01288603-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026X01288603-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026X01307909-I1Open ↗
08/17/2026X01339035-I1Open ↗
08/17/2026X01288603-S6Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026X01288603-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026X01288603-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026X01288603-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026X01288603-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X01288603-I1Open ↗