← Back
Tennis court, pool, shed, etc.
508 BOLTON AVENUE
BRONX · BIN 2131228
💬 Discuss this project
0Year Built
—Stories
Z0Building Class
R5Zoning
0 sfGross Floor Area
0Units
3 Open Violations ▸
Tennis court, pool, shed, etc. · 1,246 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction51p · 1 filing · 20 docs
Floor 3Under Construction67p · 1 filing · 20 docs
Floor 2Under Construction65p · 1 filing · 20 docs
Floor 1Under Construction64p · 1 filing · 20 docs
BasementUnder Construction52p · 1 filing · 20 docs
1 job · most recent 07/28/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026Permit IssuedMADISON TOWER GROUP LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTA48AAVJU 52,000 BTU · Vrf Outdoor ×5
RXTA24AAVJU 27,000 BTU · Vrf Outdoor ×2
RXTA36AAVJU 40,000 BTU · Vrf Outdoor ×2
1 job · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026Permit IssuedTARGET PIPING NY LLCSprinkler System
1 job · most recent 07/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026Permit IssuedTARGET PIPING NY LLCGas, Storm, Water/Sanitary
2 jobs · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
12/11/2025Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
1 job · most recent 07/28/2026
Steel
FiledStatusContractorScope
07/28/2026Permit IssuedMADISON TOWER GROUP LLCSteel
2 jobs · most recent 08/13/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/13/2026Permit IssuedACE GROUP NY CORPSidewalk Shed
07/28/2026Permit IssuedMADISON TOWER GROUP LLCFence
Building Lifecycle
All (100)Filed (9)Permit Issued (10)Violation (3)Inspection (5)Objection (43)Special Inspection (30)
09/22/2026
Permit issued — Construction Fence
X01339801-S4-FN
09/08/2026
Permit issued — Structural
X01339801-S5-ST
09/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/14/2026
Permit issued — Sidewalk Shed
X01445391-I1-SH
08/13/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01445391-I1
08/10/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
08/06/2026
Permit issued — Structural
X01339801-S5-ST
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01339801-P1
07/28/2026
Violation issued (ECB, open)
Construction
07/28/2026
Violation issued (ECB, open)
Construction
07/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/27/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/27/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/15/2026
Violation issued (ECB, open)
Construction
07/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2026
Permit issued — General Construction
X01339801-I1-GC
07/08/2026
Permit issued — Earth Work
X01339801-S6-FO-EA
07/06/2026
Permit issued — Sprinklers
X01339801-S1-EW-SP
07/06/2026
Permit issued — Plumbing
X01339801-S2-PL
07/06/2026
Permit issued — Mechanical Systems
X01339801-S3-MS
07/01/2026
Objection resolved — Resolved
06/11/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/14/2026
Objection raised — Other
05/14/2026
Objection raised — Structural
05/14/2026
Objection raised — Admin
05/14/2026
Objection raised — Other
05/14/2026
Objection raised — Structural
05/14/2026
Objection raised — Structural
05/05/2026
Objection raised — Scope
04/29/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01339801-S6
04/29/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01339801-S5
04/29/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
04/29/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
04/29/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
04/29/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
04/29/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
04/29/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
04/28/2026
Objection raised — Scope
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection raised — Zoning
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection raised — Zoning
04/28/2026
Objection resolved — Resolved
04/24/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Structural Cold-Formed Steel
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SHAHRIAR QUAYYUM
04/23/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
04/23/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
04/23/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
Latest 60 of 100 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADISON TOWER1409/23/2026
ACE GROUP NY108/16/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADISON TOWER GROUP LLCGeneral Contractor709/23/2026
TARGET PIPING NY LLCFire Protection107/08/2026
ACE GROUP NY CORPGeneral Contractor108/16/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616707/28/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMADISON TOWER GROUP LLC09/22/2026
DOB NOWStructuralPermit IssuedMADISON TOWER GROUP LLC09/08/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP08/14/2026
DOB NOWStructuralPermit IssuedMADISON TOWER GROUP LLC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedMADISON TOWER GROUP LLC07/08/2026
DOB NOWEarth WorkPermit IssuedMADISON TOWER GROUP LLC07/08/2026
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC07/06/2026
DOB NOWPlumbingPermit IssuedB&B MECH PLBG & HTG LLC07/06/2026
DOB NOWMechanical SystemsPermit IssuedMADISON TOWER GROUP LLC07/06/2026
DOB NOWConstruction FencePermit IssuedMADISON TOWER GROUP LLC04/17/2026
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/02/2026Pass-Final PL - UndergroundPassView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/28/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/10/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
08/10/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/10/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
07/27/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/27/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
07/27/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
04/29/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
04/29/2026Construction Operations Influencing Adjacent StructuresSHAHRIAR QUAYYUMspecial
04/29/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
04/29/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
04/29/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
04/29/2026Construction Operations Influencing Adjacent StructuresSHAHRIAR QUAYYUMspecial
04/24/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
04/24/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
04/24/2026Structural Cold-Formed SteelSHAHRIAR QUAYYUMspecial
04/24/2026Structural Steel - High Strength BoltingSHAHRIAR QUAYYUMspecial
04/23/2026FinalSHAHRIAR QUAYYUMprogress
04/23/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
04/23/2026FinalSHAHRIAR QUAYYUMprogress
03/31/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
03/31/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
03/31/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
03/31/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
03/31/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
03/31/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
Latest 25 of 36.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/16/2026X01339801-S1Request digital key ↗
08/16/2026X01339801-I1Request digital key ↗
08/16/2026X01339801-S4Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 15
08/16/2026X01339801-S1Open ↗
08/16/2026X01339801-I1Open ↗
08/16/2026X01339801-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01339801-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026X01339801-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X01339801-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/16/2026X01339801-I1Open ↗
08/16/2026X01339801-P1Open ↗
08/16/2026X01339801-S6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X01339801-S3Open ↗
09/01/2026X01339801-S6Open ↗
08/25/2026X01339801-S5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026X01339801-S3Open ↗
09/02/2026X01339801-S3Open ↗
09/01/2026X01339801-S6Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X01339801-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01339801-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026X01339801-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/16/2026X01339801-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026X01339801-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026X01339801-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026X01339801-S6Open ↗