← Back
BRONX
249 EAST 233 STREET
BRONX · Wakefield-Woodlawn · BIN 2131260
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OSCII108/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VHB107/06/2026
JAROS BAUM & BOLLES103/16/2026
VANASSE HANGEN BRUSTLIN, INC.102/06/2026
Building Lifecycle
All (34)Filed (3)Objection (19)Special Inspection (12)
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
08/17/2026
Special inspection requirement — Masonry
08/17/2026
Special inspection requirement — Subgrade Inspections
08/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/17/2026
Objection raised — Other
07/09/2026
Objection raised — Scope
07/06/2026
Filed — Alteration CO
Installation non-accessory battery energy storage system (UG IV(C) ) located on an open lot (no building), on a portion of the existing tax lot associated with TBIN-298732954. ESS will be installed on conc. pads w/ fire suppression system per NPFA 15.
X01351796-S1
07/02/2026
Special inspection requirement — Concrete - Cast-In-Place
07/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/02/2026
Special inspection requirement — Subgrade Inspections
07/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/23/2026
Special inspection requirement — Final
06/23/2026
Special inspection requirement — Footing and Foundation
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
04/24/2026
Objection raised — Other
03/17/2026
Objection resolved — Addressed
03/16/2026
Filed — Alteration
INSTALLATION OF ENERGY STORAGE EQUIPMENT, PER THE SYSTEM DESCRIPTION ON X01351796. THIS APPLICATION IS FOR OTCR AND TAX ABATEMENT
X01355881-I1
03/04/2026
Special inspection requirement — Final
02/17/2026
Objection raised — Admin
02/06/2026
Filed — Alteration CO
Installation non-accessory battery energy storage system (UG IV(C) ) located on an open lot (no building), on a portion of the existing tax lot associated with TBIN-298732954. ESS will be installed on conc. pads w/ fire suppression system per NPFA 15.
X01351796-I1
Nothing on file for this building.
2 projects · most recent 07/06/2026
Steel Masonry
FiledStatusContractorScope
07/06/2026——Steel, Masonry
03/16/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/17/2026Concrete - Cast-In-Place—special
08/17/2026Masonry—special
08/17/2026Subgrade Inspections—special
08/17/2026Subsurface Investigations (Borings/Test Pits)—special
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/02/2026Concrete - Cast-In-Place—special
07/02/2026Excavations - Sheeting, Shoring, and Bracing—special
07/02/2026Subgrade Inspections—special
07/02/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/23/2026Final—progress
06/23/2026Footing and Foundation—progress
03/04/2026Final—progress
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01355881-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01355881-I1Open ↗