← Back
BRONX
253 EAST 233 STREET
BRONX · BIN 2131264
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VHB107/06/2026
JAROS BAUM & BOLLES103/16/2026
VANASSE HANGEN BRUSTLIN, INC.102/06/2026
Building Lifecycle
All (46)Filed (3)Objection (31)Special Inspection (12)
08/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
08/17/2026
Special inspection requirement — Masonry
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/17/2026
Special inspection requirement — Subgrade Inspections
07/22/2026
Objection raised — Structural
07/22/2026
Objection raised — Structural
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Admin
07/22/2026
Objection raised — Structural
07/22/2026
Objection raised — Scope
07/22/2026
Objection raised — Inspections
07/22/2026
Objection raised — Admin
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Other
07/06/2026
Filed — Alteration CO
FOUNDATION WORK IN CONJUNCTION WITH ALT CO X01352886-l1.
X01352886-S1
07/02/2026
Special inspection requirement — Concrete - Cast-In-Place
07/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/02/2026
Special inspection requirement — Subgrade Inspections
07/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/23/2026
Special inspection requirement — Footing and Foundation
06/23/2026
Special inspection requirement — Final
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Admin
06/12/2026
Objection raised — Admin
06/12/2026
Objection raised — Scope
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/06/2026
Objection resolved — Addressed
04/03/2026
Objection raised — Other
03/16/2026
Filed — Alteration
INSTALLATION OF ENERGY STORAGE EQUIPMENT, PER THE SYSTEM DESCRIPTION ON X01352886. THIS APPLICATION IS FOR OTCR AND TAX ABATEMENT
X01358531-I1
02/18/2026
Objection raised — Admin
02/17/2026
Special inspection requirement — Final
02/06/2026
Filed — Alteration CO
FOUNDATION WORK IN CONJUNCTION WITH ALT CO X01352886-l1.
X01352886-I1
Nothing on file for this building.
2 projects · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026——1 scope_items
03/16/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/17/2026Subsurface Investigations (Borings/Test Pits)—special
08/17/2026Concrete - Cast-In-Place—special
08/17/2026Masonry—special
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/17/2026Subgrade Inspections—special
07/02/2026Concrete - Cast-In-Place—special
07/02/2026Excavations - Sheeting, Shoring, and Bracing—special
07/02/2026Subgrade Inspections—special
07/02/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/23/2026Footing and Foundation—progress
06/23/2026Final—progress
02/17/2026Final—progress
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01358531-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01358531-I1Open ↗