← Back
BRONX
1239 EAST 224 STREET
BRONX · BIN 2131298
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Floor 31p · 1 filing · 11 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.207/20/2026
MEI ARCHITECT PLLC106/02/2026
Building Lifecycle
All (35)Filed (3)Objection (2)Special Inspection (30)
07/29/2026
Objection raised — C/O of existing property requi
07/29/2026
Objection raised — Energy
07/20/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-S2
07/20/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-S1
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/13/2026
Special inspection requirement — Subgrade Inspections
07/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/13/2026
Special inspection requirement — Final
07/13/2026
Special inspection requirement — Footing and Foundation
07/13/2026
Special inspection requirement — Masonry
07/13/2026
Special inspection requirement — Structural Cold-Formed Steel
07/13/2026
Special inspection requirement — Structural Steel - Details
07/13/2026
Special inspection requirement — Wood – Seismic Resistance
07/13/2026
Special inspection requirement — Final
07/13/2026
Special inspection requirement — Structural Wood Frame
06/02/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-I1
05/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/26/2026
Special inspection requirement — Air barrier — testing
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/26/2026
Special inspection requirement — Insulation placement and R values
05/26/2026
Special inspection requirement — Fenestration air leakage
05/26/2026
Special inspection requirement — Air barrier - visual inspection
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/26/2026
Special inspection requirement — Interior lighting power
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/26/2026
Special inspection requirement — Maintenance information
05/26/2026
Special inspection requirement — Metering
05/26/2026
Special inspection requirement — Fenestration areas
05/26/2026
Special inspection requirement — Permanent certificate
05/26/2026
Special inspection requirement — Ventilation and air distribution system
05/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 07/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026——Heating and Air Conditioning Systems
Heat / Cool
Gree MULTI24HP230V1E0 23,200 BTU · Heat Pump Outdoor ×4
MULTI36HP230V1E0 34,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/20/2026
Steel Masonry Wood
FiledStatusContractorScope
07/20/2026——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Excavations - Sheeting, Shoring, and Bracing—special
07/13/2026Subgrade Inspections—special
07/13/2026Subsurface Investigations (Borings/Test Pits)—special
07/13/2026Final—progress
07/13/2026Footing and Foundation—progress
07/13/2026Masonry—special
07/13/2026Structural Cold-Formed Steel—special
07/13/2026Structural Steel - Details—special
07/13/2026Wood – Seismic Resistance—special
07/13/2026Final—progress
07/13/2026Structural Wood Frame—progress
05/26/2026Fire-Resistance Rated Construction—progress
05/26/2026Air barrier — testing —energy_progress
05/26/2026HVAC-R and service water heating equipment—energy_progress
05/26/2026Insulation placement and R values—energy_progress
05/26/2026Fenestration air leakage—energy_progress
05/26/2026Air barrier - visual inspection—energy_progress
05/26/2026HVAC-R and service water heating system controls—energy_progress
05/26/2026Interior lighting power—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/26/2026Duct leakage testing, insulation and design—energy_progress
05/26/2026HVAC-R and service water piping design and insulation—energy_progress
05/26/2026Maintenance information—energy_progress
05/26/2026Metering—energy_progress
Latest 25 of 34.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026X01405325-S1Request digital key ↗
08/16/2026X01405325-S2Request digital key ↗
08/14/2026X01405325-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026X01405325-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026X01405325-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026X01405325-S1Open ↗
08/16/2026X01405325-I1Open ↗
08/16/2026X01405325-S2Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/16/2026X01405325-S2Open ↗
08/14/2026X01405325-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/14/2026X01405325-I1Open ↗