← Back
BRONX
2525 MATTHEWS AVENUE
BRONX · BIN 2131347
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureGeneral
Penthouse1p · 1 filing · 11 docs
Floor 41p · 1 filing · 11 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VPNY GENERAL CONSTRUCTION108/28/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC308/21/2026
LI ARCHITECT ASSOCIATE, PLLC108/11/2026
Building Lifecycle
All (39)Filed (4)Objection (5)Special Inspection (30)
09/23/2026
Objection resolved — Resolved
09/10/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
08/21/2026
Filed — New Building
NEW 4 STORY RESIDENTIAL BUILDING OF 8 DWELLING UNITS. OBTAIN NEW C OF O.
X01436342-S6
08/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/20/2026
Filed — New Building
NEW 4 STORY RESIDENTIAL BUILDING OF 8 DWELLING UNITS. OBTAIN NEW C OF O.
X01436342-S5
08/19/2026
Filed — New Building
NEW 4 STORY RESIDENTIAL BUILDING OF 8 DWELLING UNITS. OBTAIN NEW C OF O.
X01436342-S4
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
08/17/2026
Special inspection requirement — Subgrade Inspections
08/17/2026
Special inspection requirement — Final
08/17/2026
Special inspection requirement — Footing and Foundation
08/11/2026
Filed — New Building
NEW 4 STORY RESIDENTIAL BUILDING OF 8 DWELLING UNITS. OBTAIN NEW C OF O.
X01436342-I1
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
07/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/31/2026
Special inspection requirement — Preliminary
07/31/2026
Special inspection requirement — Air barrier — testing
07/31/2026
Special inspection requirement — Air barrier - visual inspection
07/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/31/2026
Special inspection requirement — Fenestration air leakage
07/31/2026
Special inspection requirement — Exterior lighting power
07/31/2026
Special inspection requirement — Insulation placement and R values
07/31/2026
Special inspection requirement — Concrete - Cast-In-Place
07/31/2026
Special inspection requirement — Interior lighting power
07/31/2026
Special inspection requirement — Lighting in dwelling units
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/31/2026
Special inspection requirement — Lighting controls
07/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/31/2026
Special inspection requirement — Maintenance information
07/31/2026
Special inspection requirement — Metering
07/31/2026
Special inspection requirement — Fenestration areas
07/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/31/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/31/2026
Special inspection requirement — Masonry
07/31/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/31/2026
Special inspection requirement — Subgrade Inspections
Nothing on file for this building.
1 project · most recent 08/21/2026
Concrete Masonry
FiledStatusContractorScope
08/21/2026——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/21/2026Excavations - Sheeting, Shoring, and Bracing—special
08/21/2026Structural Stability – Alterations of existing buildings—special
08/17/2026Concrete - Cast-In-Place—special
08/17/2026Subgrade Inspections—special
08/17/2026Final—progress
08/17/2026Footing and Foundation—progress
07/31/2026Energy Code Compliance Inspections—progress
07/31/2026Fire-Resistance Rated Construction—progress
07/31/2026Preliminary—progress
07/31/2026Air barrier — testing —energy_progress
07/31/2026Air barrier - visual inspection—energy_progress
07/31/2026HVAC-R and service water heating equipment—energy_progress
07/31/2026Fenestration air leakage—energy_progress
07/31/2026Exterior lighting power—energy_progress
07/31/2026Insulation placement and R values—energy_progress
07/31/2026Concrete - Cast-In-Place—special
07/31/2026Interior lighting power—energy_progress
07/31/2026Lighting in dwelling units—energy_progress
07/31/2026HVAC-R and service water piping design and insulation—energy_progress
07/31/2026Lighting controls—energy_progress
07/31/2026Fenestration and door U-factor and product ratings—energy_progress
07/31/2026Maintenance information—energy_progress
07/31/2026Metering—energy_progress
07/31/2026Fenestration areas—energy_progress
07/31/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 30.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01436342-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X01436342-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01436342-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/10/2026X01436342-S6Open ↗
08/20/2026X01436342-S5Open ↗
08/20/2026X01436342-S4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026X01436342-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026X01436342-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026X01436342-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026X01436342-I1Open ↗