← Back
BRONX
695 EAST 228 STREET
BRONX · BIN 2131364
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof3p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 63p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
1 job · most recent 09/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2026——Heating and Air Conditioning Systems
Heat / Cool
__Junk__ PTH073J35 7,000 BTU · Ptac ×50
PTH153J35 14,400 BTU · Ptac ×36
PTH093J35 9,000 BTU · Ptac ×27
PTH123J35 11,600 BTU · Ptac ×18
1 job · most recent 09/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/02/2026——Gas, Storm, Water/Sanitary
1 job · most recent 09/02/2026
Concrete
FiledStatusContractorScope
09/02/2026——Concrete
1 job · most recent 09/02/2026
Fence
FiledStatusContractorScope
09/02/2026——Fence
Building Lifecycle
All (50)Filed (9)Objection (11)Special Inspection (30)
09/17/2026
Objection raised — Other
09/14/2026
Objection raised — Other
09/03/2026
Objection resolved — Resolved
09/02/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S8
09/01/2026
Objection resolved — Open
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Other
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/19/2026
Special inspection requirement — Maintenance information
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/17/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S7
08/14/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/03/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S5
08/03/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S6
08/03/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S4
08/03/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S3
08/03/2026
Objection raised — Other
08/03/2026
Objection raised — Other
08/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/03/2026
Special inspection requirement — Subgrade Inspections
08/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
08/03/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/03/2026
Special inspection requirement — Structural Steel - Details
08/03/2026
Special inspection requirement — Structural Steel - Welding
08/03/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/27/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/27/2026
Special inspection requirement — Subgrade Inspections
07/27/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/27/2026
Special inspection requirement — Final
07/27/2026
Special inspection requirement — Masonry
07/27/2026
Special inspection requirement — Footing and Foundation
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
07/27/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/27/2026
Special inspection requirement — Post-installed Anchors
07/27/2026
Special inspection requirement — Structural Cold-Formed Steel
07/27/2026
Special inspection requirement — Final
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
07/23/2026
Objection raised — Other
07/13/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S2
07/13/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-S1
07/06/2026
Special inspection requirement — Shutoff dampers
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/06/2026
Special inspection requirement — Post-installed Anchors
07/06/2026
Special inspection requirement — Mechanical Systems
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
06/22/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01411426-I1
X01411426-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INNOVATIVE CONSTRUCTION NYC209/23/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE309/02/2026
NIKOLAI KATZ ARCHITECT308/03/2026
ELEVATED ENGINEERING NYC308/03/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026HVAC-R and service water piping design and insulation—energy_progress
08/19/2026Maintenance information—energy_progress
08/19/2026HVAC-R and service water heating system controls—energy_progress
08/19/2026HVAC-R and service water heating equipment—energy_progress
08/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/03/2026Subsurface Investigations (Borings/Test Pits)—special
08/03/2026Subgrade Inspections—special
08/03/2026Construction Operations Influencing Adjacent Structures—special
08/03/2026Excavations - Sheeting, Shoring, and Bracing—special
08/03/2026Structural Steel - Details—special
08/03/2026Structural Steel - Welding—special
08/03/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/27/2026Construction Operations Influencing Adjacent Structures—special
07/27/2026Subgrade Inspections—special
07/27/2026Subsurface Investigations (Borings/Test Pits)—special
07/27/2026Final—progress
07/27/2026Masonry—special
07/27/2026Footing and Foundation—progress
07/27/2026Concrete - Cast-In-Place—special
07/27/2026Construction Operations Influencing Adjacent Structures—special
07/27/2026Post-installed Anchors—special
07/27/2026Structural Cold-Formed Steel—special
07/27/2026Final—progress
07/27/2026Concrete - Cast-In-Place—special
Latest 25 of 53.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026X01411426-S6Request digital key ↗
08/16/2026X01411426-S5Request digital key ↗
08/16/2026X01411426-S4Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026X01411426-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026X01411426-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/23/2026X01411426-S9Open ↗
09/23/2026X01411426-S8Open ↗
08/19/2026X01411426-S7Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
09/23/2026X01411426-S9Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026X01411426-S3Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026X01411426-S3Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
09/23/2026X01411426-S9Open ↗
08/14/2026X01411426-I1Open ↗
▸DOB NOWExisting Sidewalk Photographs1
09/23/2026X01411426-S9Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026X01411426-I1Open ↗