← Back
One story retail building
781 EAST TREMONT AVENUE
BRONX · BIN 2808214
💬 Discuss this project
2000Year Built
1Stories
K1Building Class
C4-4AZoning
12,516 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: GLOBAL MANAGEMENT ENTERPRISES, · 17,860 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 10 docs
Floor 12p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RJ CAPITAL CONSTRUCTION LTD1703/22/2026
771 - 781 EAST TREMONT CO103/22/2026
FOOTLOCKER103/21/2026
MARJI CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO CONSULTING MANAGEMENT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE STRUCTURES LLCGeneral Contractor603/21/2026
REEM PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP INSPECTIONS, INC1102309/23/2024
Building Lifecycle
All (26)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (3)Special Inspection (13)
09/27/2024
Special inspection requirement — Interior lighting power
Nicolas Crosetto
09/27/2024
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
09/27/2024
Special inspection requirement — Final
Nicolas Crosetto
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
09/27/2024
Special inspection requirement — Ventilation and air distribution system
Nicolas Crosetto
09/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
Nicolas Crosetto
09/27/2024
Special inspection requirement — Lighting controls
Nicolas Crosetto
09/23/2024
Filed — Alteration
8591 -Installing dunnage for Roof Top Units for footlocker space (displayed as 775 East Tremont). No change in egress use group or occupancy.Professional Certification requested
X00590373-P1
08/18/2022
Signed off — Alteration
8591PL - Remodeling Footlocker Store (displayed as 775) Plumbing work to include new Bathroom, drinking fountain, mop sink, non gas water heater.. No change in egress use or occupancy. Pro cert requested
X00590394-I1
08/12/2022
Signed off — Alteration
8591 -Remodeling existing Footlocker Store (Displayed as 775) work to include for millwork, non bearing partitions, floor coverings, fixtures.. No change in egress use group or occupancy group. Procert requested
X00593132-I1
08/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/26/2022
Special inspection requirement — Final
Nicolas Crosetto
01/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2021
Permit issued — Plumbing
X00590394-I1-PL
11/30/2021
Permit issued — General Construction
X00590373-I1-GC-CX
11/24/2021
Filed — Alteration
8591 -Installing dunnage for Roof Top Units for footlocker space (displayed as 775 East Tremont). No change in egress use group or occupancy.Professional Certification requested
X00590373-I1
11/16/2021
Permit issued — General Construction
X00593132-I1-GC
11/15/2021
Filed — Alteration
8591PL - Remodeling Footlocker Store (displayed as 775) Plumbing work to include new Bathroom, drinking fountain, mop sink, non gas water heater.. No change in egress use or occupancy. Pro cert requested
X00590394-I1
10/13/2021
Filed — Alteration
8591 -Remodeling existing Footlocker Store (Displayed as 775) work to include for millwork, non bearing partitions, floor coverings, fixtures.. No change in egress use group or occupancy group. Procert requested
X00593132-I1
10/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
10/12/2021
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
10/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Crosetto
09/14/2021
Special inspection requirement — Final
Nicolas Crosetto
03/26/2002
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP12/01/2021
DOB NOWGeneral ConstructionPermit IssuedUNIQUE STRUCTURES LLC11/30/2021
DOB NOWGeneral ConstructionSigned-offUNIQUE STRUCTURES LLC11/16/2021
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR01/08/2002
BISPLISSUEDM&T PLBG AND HTG CO., INC08/27/2001
BISEQISSUEDFISHER DEVELOPMENT INC-NYO08/01/2001
BISOTISSUEDFISHER DEVELOPMENT INC-NYO08/01/2001
BISEQISSUEDMARJI CONSTRUCTION CO INC01/09/2001
BIS—ISSUEDMARJI CONSTRUCTION CO INC01/09/2001
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR05/31/2000
BIS—ISSUEDMARJI CONSTRUCTION CO INC01/11/2000
BISEQISSUEDMARJI CONSTRUCTION CO INC01/11/2000
1 project · most recent 09/23/2024
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
09/23/2024Permit IssuedUNIQUE STRUCTURES LLCAir Conditioning Systems, Others
Cooling
York YORK YSC120H3RHA1DQY 10 tons · Rooftop Unit ×2
YORK YSD150G3RHC001S 150,000 BTU · Rooftop Unit ×2
Other
Markel 5100 Series F2F5I05N 17,100 BTU · Unit Heater ×2
Berner Berner CHD10-2072EX 15 kW ×2
Indeeco UHIR series model 240-U1050D-D 17,100 BTU · Unit Heater ×2
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/27/2024Interior lighting powerNicolas Crosettoenergy_progress
09/27/2024Mechanical SystemsNicolas Crosettospecial
09/27/2024FinalNicolas Crosettoprogress
09/27/2024Energy Code Compliance InspectionsNicolas Crosettoprogress
09/27/2024Ventilation and air distribution systemNicolas Crosettoenergy_progress
09/27/2024Duct leakage testing, insulation and designNicolas Crosettoenergy_progress
09/27/2024Lighting controlsNicolas Crosettoenergy_progress
01/26/2022FinalNicolas Crosettoprogress
01/26/2022Structural Stability – Alterations of existing buildings—special
10/12/2021Fire-Resistant Penetrations and JointsNicolas Crosettospecial
10/12/2021Energy Code Compliance InspectionsNicolas Crosettoprogress
10/12/2021HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
09/14/2021FinalNicolas Crosettoprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026X00593132-I1Request digital key ↗
08/25/2026X00590394-I1Request digital key ↗
08/20/2026X00590373-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X00590394-I1Open ↗
09/01/2026X00590394-I1Open ↗
08/26/2026X00593132-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00590394-I1Open ↗
08/20/2026X00590373-I1Open ↗
08/20/2026X00590373-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X00593132-I1Open ↗
08/23/2026X00590373-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWOER: Notice to Proceed5
08/13/2026X00590373-I1Open ↗
08/13/2026X00593132-I1Open ↗
08/13/2026X00590394-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026X00590373-I1Open ↗
08/13/2026X00590394-I1Open ↗
08/13/2026X00593132-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00590394-I1Open ↗