← Back
Primarily 2 family with 1 store or office
393 ATLANTIC AVENUE
BROOKLYN · BIN 3000676
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R7AZoning
3,285 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: ATLANTIC BAPAZ LLC · 1,680 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 38p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar8p · 1 filing · 20 docs
3 jobs · most recent 11/04/2024
General Wiring
FiledStatusContractorScope
11/04/2024CompleteACCURATE ELEC'L CORP.—
06/30/2024CompleteACCURATE ELEC'L CORP.General Wiring
04/19/2023CompleteACCURATE ELEC'L CORP.—
Building Lifecycle
All (58)Filed (6)Permit Issued (2)Signed Off (1)Violation (8)Inspection (1)Objection (16)Special Inspection (24)
07/26/2024
Signed off — Alteration
FILE MECHANICAL WORK TYPE WITH MAKE UP AIR AND EXHAUST DUCT SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01054932-I1
07/20/2024
Filed — Alteration
FILE MECHANICAL WORK TYPE WITH MAKE UP AIR AND EXHAUST DUCT SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01054932-P1
06/29/2024
Special inspection requirement — Shutoff dampers
FAZAL BANGASH
06/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAZAL BANGASH
06/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAZAL BANGASH
06/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAZAL BANGASH
06/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAZAL BANGASH
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
06/28/2024
Special inspection requirement — Mechanical Systems
FAZAL BANGASH
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
06/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
06/28/2024
Special inspection requirement — Final
FAZAL BANGASH
05/28/2024
Permit issued — Mechanical Systems
B01054932-I1-MS
05/22/2024
Filed — Alteration
FILE MECHANICAL WORK TYPE WITH MAKE UP AIR AND EXHAUST DUCT SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01054932-I1
05/07/2024
Filed — Alteration
B01046735-I1
04/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Scaduto
04/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
Michael Scaduto
04/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
04/12/2024
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
04/12/2024
Special inspection requirement — Insulation placement and R values
Michael Scaduto
04/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Scaduto
04/12/2024
Special inspection requirement — Fenestration air leakage
Michael Scaduto
03/12/2024
Filed — Alteration CO
ALT-CO FILED TO CONVERT COMMUNITY FACILITY (CHURCH) USE TO COMMERCIAL USE (RETAIL, UG6). SCOPE INCLUDES MINOR EXTERIOR WORK TO FRONT FACADE AT FIRST FLOOR ONLY. NO WORK TO RESIDENTIAL UNITS ABOVE. NO CHANGE TO CHANGE TO EGRESS.
B00817345-P2
03/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Scaduto
03/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
Michael Scaduto
03/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
03/06/2024
Special inspection requirement — Insulation placement and R values
Michael Scaduto
03/06/2024
Special inspection requirement — Fenestration air leakage
Michael Scaduto
03/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Scaduto
03/06/2024
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
02/15/2024
Objection resolved — Addressed
02/15/2024
Objection resolved — Addressed
02/06/2024
Objection raised — Other
02/06/2024
Objection raised — Other
01/22/2024
Filed — Alteration CO
ALT-CO FILED TO CONVERT COMMUNITY FACILITY (CHURCH) USE TO COMMERCIAL USE (RETAIL, UG6). SCOPE INCLUDES MINOR EXTERIOR WORK TO FRONT FACADE AT FIRST FLOOR ONLY. NO WORK TO RESIDENTIAL UNITS ABOVE. NO CHANGE TO CHANGE TO EGRESS.
B00817345-P1
08/25/2023
Permit issued — General Construction
B00817345-I1-GC
07/18/2023
Objection resolved — Addressed
07/10/2023
Objection resolved — Addressed
07/10/2023
Objection resolved — Addressed
07/10/2023
Objection resolved — Addressed
06/09/2023
Objection resolved — Addressed
03/31/2023
Objection raised — Scope
03/31/2023
Objection raised — Structural
03/17/2023
Objection resolved — Addressed
03/06/2023
Objection raised — Scope
02/17/2023
Objection raised — Inspections
02/17/2023
Objection raised — Scope
02/17/2023
Objection raised — Scope
02/07/2023
Filed — Alteration CO
ALT-CO FILED TO CONVERT COMMUNITY FACILITY (CHURCH) USE TO COMMERCIAL USE (RETAIL, UG6). SCOPE INCLUDES MINOR EXTERIOR WORK TO FRONT FACADE AT FIRST FLOOR ONLY. NO WORK TO RESIDENTIAL UNITS ABOVE. NO CHANGE TO CHANGE TO EGRESS.
B00817345-I1
03/03/2022
Violation issued (ECB, closed)
Construction
11/09/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
08/02/2021
Violation issued (ECB, closed)
Construction
05/24/2021
Violation issued (ECB, closed)
Construction
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2021
Violation issued (ECB, closed)
Construction
05/22/2016
Violation issued (ECB, closed)
Construction
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2022$2.3M—— → —$700/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.207/20/2024
THE ORDERING FORCE105/07/2024
MICHAEL SCADUTO ARCHITECT303/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
LT PRO CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488207/20/2024
MICHAEL SCADUTO ARCHITECT4833303/12/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLT PRO CONSTRUCTION INC05/28/2024
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC08/25/2023
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/29/2024Shutoff dampersFAZAL BANGASHenergy_progress
06/29/2024Duct leakage testing, insulation and designFAZAL BANGASHenergy_progress
06/28/2024HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
06/28/2024HVAC-R and service water heating equipmentFAZAL BANGASHenergy_progress
06/28/2024HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
06/28/2024Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
06/28/2024Mechanical SystemsFAZAL BANGASHspecial
06/28/2024Energy Code Compliance InspectionsFAZAL BANGASHprogress
06/28/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
06/28/2024FinalFAZAL BANGASHprogress
04/12/2024Structural Stability – Alterations of existing buildingsMichael Scadutospecial
04/12/2024Tenant Protection Plan ComplianceMichael Scadutospecial
04/12/2024Energy Code Compliance InspectionsMichael Scadutoprogress
04/12/2024Air barrier - visual inspectionMichael Scadutoenergy_progress
04/12/2024Insulation placement and R valuesMichael Scadutoenergy_progress
04/12/2024Fenestration and door U-factor and product ratingsMichael Scadutoenergy_progress
04/12/2024Fenestration air leakageMichael Scadutoenergy_progress
03/06/2024Structural Stability – Alterations of existing buildingsMichael Scadutospecial
03/06/2024Tenant Protection Plan ComplianceMichael Scadutospecial
03/06/2024Energy Code Compliance InspectionsMichael Scadutoprogress
03/06/2024Insulation placement and R valuesMichael Scadutoenergy_progress
03/06/2024Fenestration air leakageMichael Scadutoenergy_progress
03/06/2024Fenestration and door U-factor and product ratingsMichael Scadutoenergy_progress
03/06/2024Air barrier - visual inspectionMichael Scadutoenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00817345-P2Request digital key ↗
08/25/2026B01046735-I1Request digital key ↗
08/25/2026B01054932-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00817345-I1Open ↗
08/28/2026B00817345-I1Open ↗
08/28/2026B00817345-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B00817345-P2Open ↗
08/25/2026B00817345-I1Open ↗
08/25/2026B00817345-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00817345-I1Open ↗
08/28/2026B00817345-I1Open ↗
08/28/2026B00817345-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/25/2026B00817345-P2Open ↗
08/15/2026B00817345-I1Open ↗
08/15/2026B00817345-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B00817345-P2Open ↗
08/25/2026B01046735-I1Open ↗
08/25/2026B01054932-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/25/2026B00817345-P2Open ↗
08/15/2026B00817345-I1Open ↗
08/15/2026B00817345-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00817345-I1Open ↗