Two family converted from one family
367 PACIFIC STREET
BROOKLYN · BIN 3000903
💬 Discuss this project
1871Year Built
3Stories
B3Building Class
R6BZoning
3,540 sfGross Floor Area
2Units
Two family converted from one family · 1,740 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 09/11/2025
FiledStatusContractorScope
09/11/2025CompleteMAK ELECTRICAL CONTR CORP2 meters
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/11/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01287887-I1
11/03/2025
Permit issued — Solar
B01287887-I1-SL
10/30/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
B01287887-I1
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
09/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
09/16/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
09/16/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC110/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116110/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO11/03/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/16/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
09/16/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
09/16/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
09/16/2025FinalVYACHESLAV NECHAYEVprogress
09/16/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01287887-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B01287887-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B01287887-I1Open ↗
08/29/2026B01287887-I1Open ↗
08/29/2026B01287887-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01287887-I1Open ↗
08/29/2026B01287887-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01287887-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01287887-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01287887-I1Open ↗