← Back
BROOKLYN
546 PACIFIC STREET
BROOKLYN · BIN 3001199
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureGeneral
Roof4p · 2 filings · 7 docs
Bulkhead4p · 2 filings · 7 docs
Floor 121p · 1 filing · 4 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 34p · 2 filings · 7 docs
Floor 23p · 2 filings · 7 docs
Floor 13p · 2 filings · 7 docs
Basement2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRUCTURAL ENGINEERING TECHNOLOGIES109/11/2026
THOMAS A SCIBILIA107/29/2026
ADROIT ENGINEERING PLLC106/25/2026
Building Lifecycle
All (26)Filed (3)Objection (2)Special Inspection (21)
09/15/2026
Objection raised — Other
09/11/2026
Filed — New Building
Sprinkler/ standpipe specifications filed in conjunction with GC B01433397-I1
B01433397-S3
07/30/2026
Special inspection requirement — Final
07/29/2026
Filed — New Building
Sprinkler/ standpipe specifications filed in conjunction with GC B01433397-I1
B01433397-I1
07/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/28/2026
Special inspection requirement — Exterior lighting power
07/28/2026
Special inspection requirement — Fenestration air leakage
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/28/2026
Special inspection requirement — Air barrier - visual inspection
07/28/2026
Special inspection requirement — Insulation placement and R values
07/28/2026
Special inspection requirement — Interior lighting power
07/28/2026
Special inspection requirement — Air barrier continuity plan testing
07/28/2026
Special inspection requirement — Lighting in dwelling units
07/28/2026
Special inspection requirement — Fenestration areas
07/28/2026
Special inspection requirement — Lighting controls
07/28/2026
Special inspection requirement — Maintenance information
07/28/2026
Special inspection requirement — Electrical motors and elevators
07/28/2026
Special inspection requirement — Metering
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
07/28/2026
Special inspection requirement — Vestibules
07/10/2026
Objection raised — Other
06/25/2026
Filed — Full Demolition
Full demolition to a two story house
B01407694-I1
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISEQISSUEDS S BRIDGING & SCAFFOLDIN06/13/2013
1 project · most recent 09/11/2026
Concrete
FiledStatusContractorScope
09/11/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/30/2026Final—progress
07/28/2026Exterior Insulation and Finish Systems (EIFS)—special
07/28/2026Fire-Resistant Penetrations and Joints—special
07/28/2026Energy Code Compliance Inspections—progress
07/28/2026Fire-Resistance Rated Construction—progress
07/28/2026Exterior lighting power—energy_progress
07/28/2026Fenestration air leakage—energy_progress
07/28/2026Fenestration and door U-factor and product ratings—energy_progress
07/28/2026Air barrier - visual inspection—energy_progress
07/28/2026Insulation placement and R values—energy_progress
07/28/2026Interior lighting power—energy_progress
07/28/2026Air barrier continuity plan testing—energy_progress
07/28/2026Lighting in dwelling units—energy_progress
07/28/2026Fenestration areas—energy_progress
07/28/2026Lighting controls—energy_progress
07/28/2026Maintenance information—energy_progress
07/28/2026Electrical motors and elevators—energy_progress
07/28/2026Metering—energy_progress
07/28/2026Protection of exposed foundation insulation—energy_progress
07/28/2026Vestibules—energy_progress
06/24/2026Structural Stability – Alterations of existing Buildings—special
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01433397-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/18/2013320770439Open ↗
▸BISWORK PERMIT APPLICATION1
06/18/2013320770439Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01433397-I1Open ↗
▸Seals & Professional Certifications4
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION1
06/18/2013320770439Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/18/2013320770439Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/18/2013320770439Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01433397-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISFINAL1
12/19/2023320770439Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/17/2013320770439Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026B01433397-I1Open ↗