← Back
City residence, one family
176 DEAN STREET
BROOKLYN · BIN 3001318
💬 Discuss this project
1860Year Built
2Stories
A4Building Class
R6BZoning
2,580 sfGross Floor Area
1Units
City residence, one family · 2,000 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDGE RENOVATION LLCGeneral Contractor407/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOGRAPHIC CO1579106/13/2023
CATALPA SPECIAL INSPECTIO2004101/17/2023
Building Lifecycle
All (33)Filed (3)Permit Issued (5)Signed Off (1)Inspection (3)Objection (12)Special Inspection (9)
01/21/2026
Signed off — Alteration
structural work as shown on drawings filed herewith.
B08032696-I1
03/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2024
Permit issued — Structural
B08032696-S3-ST
11/13/2024
Permit issued — General Construction
B08032696-I1-GC
11/13/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2024
Permit issued — Plumbing
B08032696-S1-PL
08/15/2024
Permit issued — Structural
B08032696-S3-ST
07/24/2024
Permit issued — General Construction
B08032696-I1-GC
07/22/2024
Filed — Alteration
structural work as shown on drawings filed herewith.
B08032696-S1
06/16/2023
Objection raised — Admin
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Admin
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Structural
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Admin
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Structural
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Admin
06/16/2023
Objection resolved — Addressed
06/13/2023
Filed — Alteration
structural work as shown on drawings filed herewith.
B08032696-S3
06/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
06/06/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
06/06/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
06/06/2023
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
06/06/2023
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
06/06/2023
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
06/06/2023
Special inspection requirement — Final
ERIC BERLENT
01/17/2023
Filed — Alteration
structural work as shown on drawings filed herewith.
B08032696-I1
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
12/12/2022
Special inspection requirement — Final
Jonathan Toews
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offEDGE RENOVATION LLC11/13/2024
DOB NOWGeneral ConstructionSigned-offEDGE RENOVATION LLC11/13/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/22/2024
DOB NOWStructuralSigned-offEDGE RENOVATION LLC08/15/2024
DOB NOWGeneral ConstructionSigned-offEDGE RENOVATION LLC07/24/2024
1 project · most recent 07/22/2024
Water/Sanitary
FiledStatusContractorScope
07/22/2024Signed-offORBIT PLBG & HTG INCWater/Sanitary
2 projects · most recent 10/10/2025
General Wiring
FiledStatusContractorScope
10/10/2025Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
08/25/2025CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
1 project · most recent 07/22/2024
Steel
FiledStatusContractorScope
07/22/2024Signed-offEDGE RENOVATION LLCSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/06/2023Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
06/06/2023Concrete - Cast-In-Placeasghar Ghodsispecial
06/06/2023Post-installed Anchorsasghar Ghodsispecial
06/06/2023Structural Steel - High Strength Boltingasghar Ghodsispecial
06/06/2023Structural Steel - Weldingasghar Ghodsispecial
06/06/2023Structural Steel - Detailsasghar Ghodsispecial
06/06/2023FinalERIC BERLENTprogress
12/14/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
12/12/2022FinalJonathan Toewsprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B08032696-S1Request digital key ↗
08/24/2026B08032696-I1Request digital key ↗
08/15/2026B08032696-S3Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026B08032696-I1Open ↗
08/13/2026B08032696-S3Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B08032696-S3Open ↗
09/01/2026B08032696-S3Open ↗
09/01/2026B08032696-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B08032696-S1Open ↗
08/13/2026B08032696-I1Open ↗
08/13/2026B08032696-S3Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B08032696-S3Open ↗
08/22/2026B08032696-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B08032696-S1Open ↗
08/13/2026B08032696-I1Open ↗
08/13/2026B08032696-S3Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026B08032696-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B08032696-I1Open ↗