← Back
Single or multiple dwelling with stores or offices
163 REMSEN STREET
BROOKLYN · BIN 3002096
💬 Discuss this project
1900Year Built
5Stories
S9Building Class
C5-2AZoning
7,380 sfGross Floor Area
8Units
Rent Stabilized48 Open Violations 47 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: BELEM ASSOCIATES INC · 2,200 sf lot · 3.35 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 102p · 1 filing · 2 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION807/08/2026
BELEM ASSOCIATES2303/22/2026
BELEN ASSOCIATES INC103/22/2026
SENNER CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC211/07/2022
METRO STRUCTURES304/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINNACLE BUILDING CON303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
YOUNG CHOEElectrical103/21/2026
Building Lifecycle
All (80)Filed (5)Permit Issued (2)Signed Off (2)Violation (60)Objection (8)Special Inspection (3)
07/29/2026
Violation issued (HPD, open)
A
07/29/2026
Violation issued (HPD, open)
A
07/29/2026
Violation issued (HPD, open)
A
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
09/16/2024
Violation issued (ECB, open)
Boilers
04/11/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
05/12/2023
Signed off — Alteration
B08034907-I1
05/11/2023
Signed off — Alteration
B08034889-I1
03/24/2023
Violation issued (HPD, open)
A
11/08/2022
Permit issued — Sidewalk Shed
B08034889-I1-SH
11/08/2022
Permit issued — Supported Scaffold
B08034907-I1-SF
11/07/2022
Filed — Alteration
B08034907-I1
11/07/2022
Filed — Alteration
B08034889-I1
04/10/2022
Filed — Alteration
B00704493-I1
04/08/2022
Objection raised — Scope
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection raised — Scope
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection raised — Inspections
04/08/2022
Objection resolved — Addressed
04/08/2022
Objection raised — Inspections
04/08/2022
Objection resolved — Addressed
04/04/2022
Filed — Alteration
APPLICATION IS FOR THE INTERIOR, RENOVATION OF THE 5TH FLOOR AND 4TH FLOOR STEPS & HALLWAY AS PER PLANS SUBMITTED. WORK IS FOR REMOVAL OF ECB VIOLATION 39030471R. NO CHANGE IN USE, EGRESS OR OCCUPANCY OF BUILDING.
B00701756-I1
04/04/2022
Filed — Alteration
PLUMBING WORK FOR RENOVATION OF TWO APARTMENTS AT FIFTH FLOOR. REPLACEMENT OF KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGHING, AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING.
B00702148-I1
03/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Augustine Angba
03/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
Augustine Angba
03/18/2022
Special inspection requirement — Final
Augustine Angba
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2022
Violation issued (ECB, closed)
Construction
11/18/2021
Violation issued (ECB, closed)
Construction
11/17/2021
Violation issued (ECB, closed)
Construction
08/04/2021
Violation issued (ECB, closed)
Construction
05/24/2021
Violation issued (ECB, closed)
Construction
04/12/2021
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, open)
A
04/06/2021
Violation issued (ECB, closed)
Construction
02/19/2021
Violation issued (ECB, closed)
Construction
10/15/2020
Violation issued (ECB, open)
Construction
09/24/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/26/2020
Violation issued (ECB, open)
Construction
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2003
Violation issued (ECB, closed)
Boilers
05/13/2002
Violation issued (HPD, open)
B
05/13/2002
Violation issued (HPD, open)
B
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/08/2022
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC11/08/2022
BISOTISSUEDSHUN SHENG CONSTRUCTION12/26/2018
BISOTISSUEDSHUN SHENG CONSTRUCTION12/26/2018
BISPLISSUEDPARAMOUNT PLUMBING CO.,IN09/07/2017
BISOTISSUEDCOOPER WORKS INC06/14/2017
BISOTISSUEDTOTAL DESIGN SOLUTIION INC.11/26/2007
BISPLISSUEDC.R.U. MECHAN & HEAT INC11/26/2007
BISOTISSUEDTOTAL DESIGN SOLUTION INC.10/11/2007
BISFPISSUEDFIRE FOE CORPORATION12/19/1995
BISOTISSUEDGEORGE CHO CONTRACTORS INC.11/02/1995
BISPLISSUEDZARA PLUMBING CORP08/03/1995
BIS—ISSUEDHERCULES CONSTRUCTION CORP.02/16/1995
1 project · most recent 04/04/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2022——Gas, Water/Sanitary
1 project · most recent 11/22/2022
FiledStatusContractorScope
11/22/2022CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/18/2022Energy Code Compliance InspectionsAugustine Angbaprogress
03/18/2022Fire-Resistance Rated ConstructionAugustine Angbaprogress
03/18/2022FinalAugustine Angbaprogress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/30/2026B00701756-I1Request digital key ↗
08/30/2026B00704493-I1Request digital key ↗
08/28/2026B08034907-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION10
01/03/2019321903320Open ↗
12/28/2018321903348Open ↗
12/28/2018321903348Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
01/03/2019321903320Open ↗
12/28/2018321903348Open ↗
06/15/2017321604180Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/20/2019321903348Open ↗
02/20/2019321903320Open ↗
01/03/2019321903320Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/30/2026B00704493-I1Open ↗
08/28/2026B08034889-I1Open ↗
08/13/2026B08034907-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/03/2019321903320Open ↗
12/28/2018321903348Open ↗
06/15/2017321604180Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B00701756-I1Open ↗
08/23/2026B00701756-I1Open ↗
08/23/2026B00701756-I1Open ↗
▸BISPC FULL REPORT2
10/29/2007310053973Open ↗
10/11/2007310035459Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/28/2018321903348Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/11/2007310035459Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/17/2009310053973Open ↗
10/29/2007310053973Open ↗
▸BISSCHEDULE B - PLUMBING1
12/12/2007310053973Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/13/2008310053973Open ↗
▸BISEQUIPMENT USE PERMITS1
01/17/2009310053973Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/15/2017321604180Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
01/03/2019321903320Open ↗
12/28/2018321903348Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/28/2018321903348Open ↗
06/15/2017321604180Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/29/2007310053973Open ↗
10/11/2007310035459Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00702148-I1Open ↗
08/13/2026B00701756-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/20/2019321903348Open ↗
12/28/2018321903348Open ↗
06/15/2017321604180Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
01/03/2019321903320Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/20/2019321903348Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/20/2019321903348Open ↗
02/20/2019321903320Open ↗
01/16/2009310053973Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/29/2007310053973Open ↗
10/11/2007310035459Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
02/20/2019321903348Open ↗
02/20/2019321903320Open ↗
01/03/2019321903320Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
12/28/2018321903320Open ↗
12/28/2018321903348Open ↗
06/15/2017321604180Open ↗
▸BISBOROUGH INTAKE FORM2
02/06/2019321903320Open ↗
02/06/2019321903348Open ↗
▸BISADDITIONAL INFORMATION1
01/24/2019321903348Open ↗