← Back
Walk-up cooperative
28 REMSEN STREET
BROOKLYN · BIN 3002120
💬 Discuss this project
1879Year Built
4Stories
C6Building Class
R6Zoning
7,000 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: 28 REMSEN STREET HOUSING CORP. · 2,250 sf lot · 3.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction7p · 1 filing · 20 docs
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BS GROUP1307/08/2026
28 REMSEN STREET HOUSING CORP.1203/22/2026
POKMAN CONTRACTING COLT103/22/2026
RAHMANN CONTRACTING CO LT103/22/2026
RAHMANN CONTRAC CO LTD103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC1003/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BS GROUP INCGeneral Contractor1007/08/2026
MLZ GENERAL CONSTRUCTIONGeneral Contractor507/08/2026
NEW AMSTERDAM PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429511/26/2025
Building Lifecycle
All (30)Filed (7)Permit Issued (12)Signed Off (2)Violation (9)
06/16/2026
Permit issued — General Construction
B01165206-I1-GC
05/05/2026
Violation issued (HPD, closed)
A
04/23/2026
Permit issued — General Construction
B01165206-I1-GC
01/08/2026
Permit issued — Structural
B01165206-S2-ST
01/07/2026
Permit issued — Plumbing
B01165206-S1-PL
12/18/2025
Permit issued — Structural
B01165206-S2-ST
11/26/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH JOB #01165206-i1. PROVIDE HEAT PUMP SPLIT SYSTEM AND DUCTWORK FOR THIRD FLOOR.
B01165206-S3
11/20/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH JOB #01165206-i1. PROVIDE HEAT PUMP SPLIT SYSTEM AND DUCTWORK FOR THIRD FLOOR.
B01165206-S2
10/23/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH JOB #01165206-i1. PROVIDE HEAT PUMP SPLIT SYSTEM AND DUCTWORK FOR THIRD FLOOR.
B01165206-P1
10/10/2025
Permit issued — General Construction
B01165206-I1-GC
09/17/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH JOB #01165206-i1. PROVIDE HEAT PUMP SPLIT SYSTEM AND DUCTWORK FOR THIRD FLOOR.
B01165206-S1
01/10/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH JOB #01165206-i1. PROVIDE HEAT PUMP SPLIT SYSTEM AND DUCTWORK FOR THIRD FLOOR.
B01165206-I1
03/01/2022
Violation issued (HPD, closed)
A
07/16/2019
Signed off — Alteration
B00034156-I1
07/16/2019
Signed off — Alteration
B00034159-I1
12/17/2018
Permit issued — Supported Scaffold
B00034159-I1-SF
12/17/2018
Permit issued — Sidewalk Shed
B00034156-I1-SH
07/18/2018
Violation issued (ECB, closed)
Construction
06/20/2018
Violation issued (ECB, closed)
Construction
06/08/2018
Violation issued (ECB, closed)
Construction
05/10/2018
Permit issued — Supported Scaffold
B00034159-I1-SF
05/10/2018
Permit issued — Sidewalk Shed
B00034156-I1-SH
04/12/2018
Permit issued — Supported Scaffold
B00034159-I1-SF
04/11/2018
Filed — Alteration
B00034156-I1
04/11/2018
Filed — Alteration
B00034159-I1
04/11/2018
Permit issued — Sidewalk Shed
B00034156-I1-SH
11/28/2017
Violation issued (HPD, closed)
I
03/06/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/28/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/1997
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION06/16/2026
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION04/23/2026
DOB NOWStructuralPermit IssuedMLZ GENERAL CONSTRUCTION01/08/2026
DOB NOWPlumbingPermit IssuedEDWARD FITZSIMMONS01/07/2026
DOB NOWStructuralPermit IssuedMLZ GENERAL CONSTRUCTION12/18/2025
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION10/10/2025
DOB NOWSupported ScaffoldSigned-offBS GROUP INC12/17/2018
DOB NOWSidewalk ShedSigned-offBS GROUP INC12/17/2018
DOB NOWSupported ScaffoldSigned-offBS GROUP INC05/10/2018
DOB NOWSidewalk ShedSigned-offBS GROUP INC05/10/2018
DOB NOWSupported ScaffoldSigned-offBS GROUP INC04/12/2018
DOB NOWSidewalk ShedSigned-offBS GROUP INC04/11/2018
BIS—ISSUEDRAHMANN CONTRACT CO. LTD*03/30/2021
BIS—ISSUEDRAHMANN CONTRACT CO. LTD*11/17/2020
BIS—ISSUEDRAHMANN CONTRACT CO. LTD*04/19/2019
BISPLISSUEDZONE PLUMBING & HEATING C07/20/2018
BIS—ISSUEDRAHMANN CONTRACT CO. LTD*05/09/2018
BISOTISSUEDDETAIL RENOVATIONS INC03/06/2018
BISOTISSUEDDETAIL RENOVATIONS INC06/15/2017
1 project · most recent 11/26/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Permit IssuedMLZ GENERAL CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ 48,000 BTU · Condensing Unit ×1
PEAD-A18AA9 18,000 BTU · Vrf Indoor ×1
SVZ-KP18NA 18,000 BTU · Fan Coil Indoor ×1
Lg ARUB060GSS4 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/26/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/26/2025Permit IssuedNEW AMSTERDAM PLBG & HTGGas, Water/Sanitary
3 projects · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025Permit IssuedSUPER CHARGED ELEC. INC.1 meters, 1 new_meters
08/13/2018CompleteKNC ELECTRIC INCGeneral Wiring
04/08/2018CompleteGREEN POWER ELECTRIC CORP—
1 project · most recent 11/26/2025
Steel Wood
FiledStatusContractorScope
11/26/2025Permit IssuedMLZ GENERAL CONSTRUCTIONSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/17/2025Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
11/17/2025Structural Steel - DetailsJeffrey Stonesspecial
11/17/2025Wood – Seismic ResistanceJeffrey Stonesspecial
11/17/2025Structural Steel - High Strength BoltingJeffrey Stonesspecial
11/17/2025Structural Steel - WeldingJeffrey Stonesspecial
11/17/2025Structural Wood FrameJeffrey Stonesprogress
11/13/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
11/13/2025FinalJeffrey Stonesprogress
11/13/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
11/13/2025Lighting in dwelling unitsJeffrey Stonesenergy_progress
11/11/2025FinalJeffrey Stonesprogress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026B00034159-I1Request digital key ↗
09/03/2026B00034156-I1Request digital key ↗
08/19/2026B01165206-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION7
08/06/2020321493255Open ↗
08/21/2019321493255Open ↗
06/17/2019321493255Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
04/22/2019321493255Open ↗
07/20/2018321493255Open ↗
05/09/2018321493255Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026B01165206-S2Open ↗
08/13/2026B01165206-S1Open ↗
08/13/2026B01165206-S3Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
07/31/2019321493255Open ↗
05/21/2019321493255Open ↗
11/30/2018321493255Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
10/17/2019321493255Open ↗
10/09/2019321493255Open ↗
10/09/2019321493255Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM2
02/22/2018321493255Open ↗
07/25/2017321493255Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/08/2022321493255Open ↗
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
12/27/2019321493255Open ↗
12/27/2019321493255Open ↗
12/27/2019321493255Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B00034159-I1Open ↗
09/03/2026B00034156-I1Open ↗
08/19/2026B01165206-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B01165206-I1Open ↗
08/28/2026B01165206-I1Open ↗
08/24/2026B01165206-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01165206-I1Open ↗
08/24/2026B01165206-S2Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
08/21/2019321493255Open ↗
12/07/2018321493255Open ↗
12/05/2018321493255Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
07/31/2019321493255Open ↗
05/21/2019321493255Open ↗
11/30/2018321493255Open ↗
▸BIS(CONT.) PLUMBING SIGN-OFF MUST BE RECEIVED IN REQUIRED ITEMS BY THEIR UNIT, AS PER J. CHOI ON 01/19/2021.1
—321493255Open ↗
▸BISEQUIPMENT USE PERMITS1
12/27/2019321493255Open ↗
▸BISREJECTED! FINAL PLUMBING, ELECTRICAL & CONSTRUCTION INSPECTION SIGN-OFF TO BE RECEIVED BY THE UNIT. RESOLVE.1
03/10/2022321493255Open ↗
▸BISREJECTED! FINAL INSPECTIONS TO BE RECIEVED BY PLUMBING, CONSTRUCTION & ELECTRICAL UNITS.1
03/10/2022321493255Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/27/2019321493255Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
02/21/2018321493255Open ↗
06/21/2017321493219Open ↗
▸BISSTREET TREE CHECKLIST2
05/09/2018321493255Open ↗
02/08/2017321493255Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026B00034159-I1Open ↗
08/19/2026B01165206-S2Open ↗
08/19/2026B01165206-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/09/2018321493255Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/27/2019321493255Open ↗
12/27/2019321493255Open ↗
12/27/2019321493255Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
12/27/2019321493255Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/17/2020321493255Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/17/2020321493255Open ↗
07/17/2020321493255Open ↗
07/17/2020321493255Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/27/2019321493255Open ↗
06/21/2018321493219Open ↗
06/20/2018321493219Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
09/21/2020321493255Open ↗
08/06/2020321493255Open ↗
02/08/2017321493255Open ↗
▸BISLANDMARKS APPROVAL2
06/21/2018321493219Open ↗
02/20/2018321493255Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/21/2018321493219Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
12/27/2019321493255Open ↗
01/10/2019321493255Open ↗
06/21/2018321493219Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
03/16/2022321493255Open ↗
07/17/2020321493255Open ↗
01/21/2020321493255Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
12/27/2019321493255Open ↗
10/17/2019321493255Open ↗
10/09/2019321493255Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
05/15/2017321493219Open ↗
02/08/2017321493255Open ↗
02/08/2017321493255Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISPLOT DIAGRAM2
02/08/2022321493255Open ↗
02/08/2017321493255Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/17/2020321493255Open ↗