← Back
Walk-up cooperative
136 STATE STREET
BROOKLYN · BIN 3002759
💬 Discuss this project
1843Year Built
4Stories
C6Building Class
R6Zoning
4,700 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸
Walk-up cooperative · Owner of record: 136 STATE STREET OWNERS CORP · 2,500 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31p · 1 filing · 4 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
136 STATE STREET OWNERS407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BENJAMIN ELLIS ARCHITECT207/27/2025
VICTOR SCHWARTZ ARCHITECT108/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPINN CONSTRUCTION INCGeneral Contractor204/09/2026
AXOL ELECTRICAL CONT. INCElectrical103/22/2026
WMS ELECTRICAL CONTNG LTDElectrical103/22/2026
HEIGHTS CONSTRUCTION CORPGeneral Contractor107/08/2026
ICE AGE MECHANICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VICTOR SCHWARTZ ARCHITECT1714108/13/2021
Building Lifecycle
All (30)Filed (3)Permit Issued (4)Signed Off (2)Violation (8)Inspection (2)Objection (2)Special Inspection (9)
11/06/2025
Permit issued — General Construction
B01243896-I1-GC
09/02/2025
Permit issued — General Construction
B01243896-I1-GC
07/27/2025
Filed — Alteration
B01243896-I1
04/11/2024
Violation issued (HPD, closed)
A
05/04/2023
Signed off — Alteration
Interior renovation at the 3rd story with minor partition work, replace existing kitchen on existing plumbing rough-ins, repair existing wood floor. No change to use, egress, or occupancy.
B00755519-I1
04/11/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/07/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/27/2023
Violation issued (HPD, closed)
A
12/06/2022
Permit issued — General Construction
B00755519-I1-GC
07/22/2022
Filed — Alteration
Interior renovation at the 3rd story with minor partition work, replace existing kitchen on existing plumbing rough-ins, repair existing wood floor. No change to use, egress, or occupancy.
B00755519-I1
06/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Ellis
06/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Ellis
03/10/2022
Signed off — Alteration
INSTALLATION OF THREE TON MINI SPLIT AIR CONDITIONING SYSTEM AND ASSOCIATED FAN COILS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00559803-I1
03/02/2022
Violation issued (HPD, closed)
A
08/23/2021
Permit issued — Mechanical Systems
B00559803-I1-MS
08/19/2021
Objection raised — Admin
08/19/2021
Objection resolved — Addressed
08/13/2021
Filed — Alteration
INSTALLATION OF THREE TON MINI SPLIT AIR CONDITIONING SYSTEM AND ASSOCIATED FAN COILS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00559803-I1
07/18/2021
Special inspection requirement — Mechanical Systems
Victor Schwartz
07/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Victor Schwartz
07/18/2021
Special inspection requirement — Final
Victor Schwartz
07/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Victor Schwartz
07/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
Victor Schwartz
07/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
Victor Schwartz
07/18/2021
Special inspection requirement — Maintenance information
Victor Schwartz
04/13/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
05/28/1987
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPINN CONSTRUCTION INC11/06/2025
DOB NOWGeneral ConstructionSigned-offSPINN CONSTRUCTION INC09/02/2025
DOB NOWGeneral ConstructionSigned-offHEIGHTS CONSTRUCTION CORP12/06/2022
DOB NOWMechanical SystemsSigned-offICE AGE MECHANICAL CORP08/23/2021
BISPLISSUEDA & M WARSHAW PLBG & HTG04/24/2019
BISMHISSUEDSPINN CONSTRUCTION INC03/22/2019
3 projects · most recent 10/25/2025
General Wiring
FiledStatusContractorScope
10/25/2025CompleteAXOL ELECTRICAL CONT. INC—
12/16/2022CompleteBAY ELECTRIC INC.General Wiring
12/02/2019CompleteWMS ELECTRICAL CONTNG LTDGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/11/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/07/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/22/2022Fire-Resistance Rated ConstructionBenjamin Ellisprogress
06/22/2022Energy Code Compliance InspectionsBenjamin Ellisprogress
07/18/2021Mechanical SystemsVictor Schwartzspecial
07/18/2021Fire-Resistant Penetrations and JointsVictor Schwartzspecial
07/18/2021FinalVictor Schwartzprogress
07/18/2021HVAC-R and service water piping design and insulationVictor Schwartzenergy_progress
07/18/2021HVAC-R and service water heating system controlsVictor Schwartzenergy_progress
07/18/2021HVAC-R and service water heating equipmentVictor Schwartzenergy_progress
07/18/2021Maintenance informationVictor Schwartzenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00755519-I1Request digital key ↗
08/21/2026B01243896-I1Request digital key ↗
08/15/2026B00559803-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION3
04/26/2019322025036Open ↗
03/25/2019322025036Open ↗
03/22/2019322025036Open ↗
▸DOB NOWLPC Approval/Permit3
08/15/2026B00559803-I1Open ↗
08/13/2026B00755519-I1Open ↗
08/13/2026B01243896-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/18/2019322025036Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature7
09/13/2026B00559803-I1Open ↗
09/13/2026B00559803-I1Open ↗
09/13/2026B00559803-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/26/2020322025036Open ↗
12/09/2019322025036Open ↗
03/28/2019322025036Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/18/2019322025036Open ↗
03/18/2019322025036Open ↗
03/18/2019322025036Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00559803-I1Open ↗
08/29/2026B00755519-I1Open ↗
08/13/2026B01243896-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/13/2026B00559803-I1Open ↗
09/13/2026B00559803-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/18/2019322025036Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS1
02/26/2020322025036Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/18/2019322025036Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/26/2020322025036Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
03/18/2019322025036Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00559803-I1Open ↗
08/13/2026B01243896-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/18/2019322025036Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/26/2020322025036Open ↗
03/28/2019322025036Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/09/2019322025036Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00559803-I1Open ↗
▸Inspections & Test Reports2
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
12/09/2019322025036Open ↗
12/09/2019322025036Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL2
12/09/2019322025036Open ↗
03/18/2019322025036Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/26/2020322025036Open ↗
12/09/2019322025036Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/09/2019322025036Open ↗
03/18/2019322025036Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
02/26/2020322025036Open ↗
12/09/2019322025036Open ↗
▸BISEFILING COVER SHEET1
07/12/2019322025036Open ↗