Primarily 2 family with 1 store or office
214 COURT STREET
BROOKLYN · BIN 3003414
💬 Discuss this project
1854Year Built
3Stories
S2Building Class
R6Zoning
2,400 sfGross Floor Area
3Units
1 Open Violation ▸
Primarily 2 family with 1 store or office · 1,532 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY504/09/2026
PARK CONTRACTING GROUP LLC.503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP106/25/2025
MSM ENGINEERING SERVICES, PLLC102/11/2025
MJ ENGINEERING & DESIGN211/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK CONTRACTING GROUPGeneral Contractor404/09/2026
BUNAY, CLEVERElectrical103/21/2026
LIOTINE, VITOElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
CITY SUBURB INCGeneral Contractor104/09/2026
MNK ENTERPRISES NY INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN5546211/06/2024
Building Lifecycle
All (39)Filed (3)Permit Issued (4)Signed Off (3)Violation (11)Objection (8)Special Inspection (10)
03/09/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01244224-I1
03/09/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01179275-I1
03/06/2026
Signed off — Alteration
STRUCTURAL WORK TO REPLACE FRONT BRICK FACADE, AS REQUIRED BY DOB FEU. THE TEMPORARY SIDEWALK SHED & SCAFFOLDING PLANS WILL BE FIELD SUBSEQUENTLY UNDER APPLICATION #B01128788-S1.
B01128788-I1
08/16/2025
Violation issued (ECB, closed)
Unknown
08/16/2025
Violation issued (ECB, closed)
Unknown
08/04/2025
Permit issued — Structural
B01128788-I1-ST
07/10/2025
Permit issued — Sidewalk Shed
B01179275-I1-SH
06/25/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01244224-I1
06/25/2025
Permit issued — Supported Scaffold
B01244224-I1-SF
02/14/2025
Permit issued — Sidewalk Shed
B01179275-I1-SH
02/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01179275-I1
11/14/2024
Objection raised — Scope
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection raised — Structural
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection raised — Energy
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection raised — Other
11/14/2024
Objection resolved — Addressed
11/06/2024
Filed — Alteration
STRUCTURAL WORK TO REPLACE FRONT BRICK FACADE, AS REQUIRED BY DOB FEU. THE TEMPORARY SIDEWALK SHED & SCAFFOLDING PLANS WILL BE FIELD SUBSEQUENTLY UNDER APPLICATION #B01128788-S1.
B01128788-I1
10/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
10/17/2024
Special inspection requirement — Masonry
Magdy Youssef
10/17/2024
Special inspection requirement — Post-installed Anchors
Magdy Youssef
10/17/2024
Special inspection requirement — Final
Magdy Youssef
10/17/2024
Special inspection requirement — Structural Wood Frame
Magdy Youssef
09/19/2024
Special inspection requirement — Post-installed Anchors
Magdy Youssef
09/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
09/19/2024
Special inspection requirement — Masonry
Magdy Youssef
09/19/2024
Special inspection requirement — Final
Magdy Youssef
09/19/2024
Special inspection requirement — Structural Wood Frame
Magdy Youssef
08/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2007
Violation issued (ECB, closed)
Construction
08/01/2007
Violation issued (HPD, open)
C
06/27/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCITY SUBURB INC08/04/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP07/10/2025
DOB NOWSupported ScaffoldSigned-offPARK CONTRACTING GROUP06/25/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC02/14/2025
BISMHISSUEDALL-BORO FIRE & SAFETY EQ06/15/2016
BISOTISSUEDALL-BORO FIRE & SAFETY EQ06/14/2016
BISPLISSUEDEINSTEINS PLBG & HTG INC11/30/2006
1 project · most recent 02/13/2025
FiledStatusContractorScope
02/13/2025CompleteRICHARD NEU—
1 project
Masonry
FiledStatusContractorScope
———Masonry
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/17/2024Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
10/17/2024MasonryMagdy Youssefspecial
10/17/2024Post-installed AnchorsMagdy Youssefspecial
10/17/2024FinalMagdy Youssefprogress
10/17/2024Structural Wood FrameMagdy Youssefprogress
09/19/2024Post-installed AnchorsMagdy Youssefspecial
09/19/2024Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
09/19/2024MasonryMagdy Youssefspecial
09/19/2024FinalMagdy Youssefprogress
09/19/2024Structural Wood FrameMagdy Youssefprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026B01114102-I1Request digital key ↗
08/23/2026B01128788-I1Request digital key ↗
08/22/2026B01179275-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/24/2022321450149Open ↗
09/16/2016321450149Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026B01128788-I1Open ↗
08/13/2026B01114102-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01244224-I1Open ↗
08/13/2026B01179275-I1Open ↗
08/13/2026B01128788-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/16/2016321450149Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01128788-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01128788-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/16/2016321450149Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01128788-I1Open ↗
08/13/2026B01114102-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/16/2016321450149Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/16/2016321450149Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/16/2016321450149Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/16/2016321450149Open ↗