← Back
Primarily 3 family with 1 store or office
416 HENRY STREET
BROOKLYN · BIN 3003476
💬 Discuss this project
1888Year Built
4Stories
S3Building Class
R6Zoning
4,800 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 416 HENRY STREET, LL · 1,560 sf lot · 3.08 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 13p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIMA PROPERTY MANAGEMENT LLC309/13/2026
416 HENRY STREET, LL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GAMILL ENGINEERING, P.C405/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOWNTOWN PLBG & HTG INCPlumbing307/08/2026
ADAMI CONSULTING & MAINTENANCEGeneral Contractor203/21/2026
EVERLAST CUSTOM CONSTRUCTIONGeneral Contractor104/09/2026
JBJ CONCRETE RENOVATIONSGeneral Contractor107/08/2026
WAXTEL LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488105/11/2026
GAMILL ENGINEERING, P.C.1773202/02/2022
Building Lifecycle
All (24)Filed (4)Permit Issued (7)Signed Off (2)Violation (11)
06/09/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B00672584. REPLACE TOILET & LAV ON EXISTING ROUGHING. NEW INDIRECT WASTE DRAINS FOR A/C CONDENSATE. CAP AND REMOVE WASHERS, DRYERS AND SPRINKLER HEADS ON DOMESTIC SERVICE.
B00673245-I1
06/08/2026
Signed off — Alteration
APPLICATION FILED IN ORDER TO CURE LANDMARK'S COMMISSION VIOLATION FOR SECURITY GATE AND STOREFRONT SIGN. GENERAL RENOVATION OF EXISTING STORE AND INSTALLATION OF AIR CONDITIONING UNIT. SISTER DEFECTIVE FLOOR JOISTS, REFINISH FLOOR AND REPAIR SHEET ROCK.
B00672584-I1
05/11/2026
Filed — Alteration
APPLICATION FILED IN ORDER TO CURE LANDMARK'S COMMISSION VIOLATION FOR SECURITY GATE AND STOREFRONT SIGN. GENERAL RENOVATION OF EXISTING STORE AND INSTALLATION OF AIR CONDITIONING UNIT. SISTER DEFECTIVE FLOOR JOISTS, REFINISH FLOOR AND REPAIR SHEET ROCK.
B00672584-P1
01/23/2026
Permit issued — Plumbing
B00673245-I1-PL
12/01/2025
Permit issued — General Construction
B00672584-I1-GC-CX
06/25/2025
Permit issued — Mechanical Systems
B00672584-I1-GC-CX
01/21/2025
Permit issued — Plumbing
B00673245-I1-PL
05/01/2024
Permit issued — Mechanical Systems
B00672584-I1-GC-CX
02/27/2024
Permit issued — General Construction
B00672584-I1-GC-CX
02/05/2024
Permit issued — Plumbing
B00673245-I1-PL
01/17/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B00672584. REPLACE TOILET & LAV ON EXISTING ROUGHING. NEW INDIRECT WASTE DRAINS FOR A/C CONDENSATE. CAP AND REMOVE WASHERS, DRYERS AND SPRINKLER HEADS ON DOMESTIC SERVICE.
B00673245-P1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B00672584. REPLACE TOILET & LAV ON EXISTING ROUGHING. NEW INDIRECT WASTE DRAINS FOR A/C CONDENSATE. CAP AND REMOVE WASHERS, DRYERS AND SPRINKLER HEADS ON DOMESTIC SERVICE.
B00673245-I1
02/02/2022
Filed — Alteration
APPLICATION FILED IN ORDER TO CURE LANDMARK'S COMMISSION VIOLATION FOR SECURITY GATE AND STOREFRONT SIGN. GENERAL RENOVATION OF EXISTING STORE AND INSTALLATION OF AIR CONDITIONING UNIT. SISTER DEFECTIVE FLOOR JOISTS, REFINISH FLOOR AND REPAIR SHEET ROCK.
B00672584-I1
10/09/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
03/24/2012
Violation issued (HPD, open)
B
11/20/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOWNTOWN PLBG & HTG INC01/23/2026
DOB NOWGeneral ConstructionSigned-offEVERLAST CUSTOM CONSTRUCT12/01/2025
DOB NOWMechanical SystemsSigned-offWAXTEL LLC06/25/2025
DOB NOWPlumbingSigned-offDOWNTOWN PLBG & HTG INC01/21/2025
DOB NOWMechanical SystemsSigned-offADAMI CONSULTING MAINTE05/01/2024
DOB NOWGeneral ConstructionSigned-offJBJ CONCRETE RENOVATIONS02/27/2024
DOB NOWPlumbingSigned-offDOWNTOWN PLBG & HTG INC02/05/2024
BISOTISSUEDLAURENCE LIMA04/21/1993
1 project · most recent 07/29/2025
General Wiring
FiledStatusContractorScope
07/29/2025Permit IssuedCEL SVCS INC DBA CEL ELECGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/29/2026Mechanical SystemsJACK GAMILLspecial
05/29/2026Fire-Resistant Penetrations and JointsJACK GAMILLspecial
05/29/2026FinalJACK GAMILLprogress
05/29/2026HVAC-R and service water heating system controlsJACK GAMILLenergy_progress
05/29/2026HVAC-R and service water piping design and insulationJACK GAMILLenergy_progress
05/29/2026HVAC-R and service water heating equipmentJACK GAMILLenergy_progress
05/29/2026Interior lighting powerJACK GAMILLenergy_progress
05/29/2026Lighting controlsJACK GAMILLenergy_progress
05/08/2026Lighting controlsFAZAL BANGASHenergy_progress
05/08/2026HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
05/08/2026Interior lighting powerFAZAL BANGASHenergy_progress
05/08/2026HVAC-R and service water heating equipmentFAZAL BANGASHenergy_progress
05/08/2026HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
05/08/2026Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
05/08/2026Mechanical SystemsFAZAL BANGASHspecial
05/08/2026FinalFAZAL BANGASHprogress
01/23/2024Energy Code Compliance InspectionsJACK GAMILLprogress
01/23/2024Fire-Resistant Penetrations and JointsJACK GAMILLspecial
01/16/2024Fire-Resistant Penetrations and Joints—special
01/16/2024Energy Code Compliance Inspections—progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00673245-I1Request digital key ↗
08/26/2026B00673245-P1Request digital key ↗
08/17/2026B00672584-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/17/2026B00672584-P1Open ↗
08/13/2026B00673245-P1Open ↗
08/13/2026B00672584-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026B00672584-I1Open ↗
09/30/2026B00672584-I1Open ↗
08/23/2026B00673245-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00673245-I1Open ↗
08/26/2026B00673245-P1Open ↗
08/17/2026B00672584-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026B00672584-I1Open ↗
08/23/2026B00673245-I1Open ↗
08/22/2026B00672584-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00673245-P1Open ↗
08/26/2026B00673245-I1Open ↗
08/17/2026B00672584-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026B00672584-I1Open ↗