ECB12/11/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT FRONT FACADE THE MASONRY IS BULGING, LOOSE BRICKS,MISSING MORTAR IN VARIOUS LOCATIONS AT TIME OF INSPECTION,.., REPAIR AND/REPLACE$25K due
ECB12/11/2025TEMP CONSTRUCTION EQUIP/INSTALLATION ON SITE EXPIRED PERMIT (SHED),AT TIME OF INSPECTION OBSERVED PERMIT HAS EXPIRED AND NO NEW PERMIT ON FILE AS OF 12/11/25., RENEW PERMIT$6K due
ECB04/23/2025OBSERVED MISSING MORTAR IN BETWEEN BRICKS IN VARIOUS LOCATIONS AT EXPOSURE #1 STILL PRESENT., REPAIR AND/REPLACE$5K due
ECB03/10/2025AT THE TIME OF MY INSPECTION OF A SIDEWALK SHED PROVIDED TO PROTECT MEMBERS OF THE PUBLIC AND OTHERS, I OBSERVED THERE WERE NO UNDERSIDE LIGHTING PROVIDED TO PROTECT ALL WHILE USING THE DARK HAZARDOUS UNLIT SID$2K due
DOB07/17/2023INSTALL APPROXIMATELY 20 LINEAR FEET OF SIDEWALK SHED (12'H) TO SAFEGUARD THE PUBLIC AND TENANTS
ECB07/15/2023AT FRONT FACADE THE MASONRY IS BULGING, LOOSE BRICKS,MISSING MORTAR IN VARIOUS LOCATIONS AT TIME OF INSPECTION, REPAIR AND/REPLACE; PROVIDE OVERHEAD PROTECTION IMMEDIATELY MAINTAIN BUILDING$1K due
DOB12/15/2011WORK WITHOUT A PERMT REMEDY; STOP ALL WORK/MAKE SITE SAFE ONLY' OBTAIN ALL REQUIRED PERMITS
DOB03/04/2011V-DOB VIOLATION - ACTIVE
HPD03/20/2006SECTION 27-2005 ADMIN. CODE: PROVIDE GUARD RAIL AT EXIT TO ROOF AT SCUTTLE AT ROOF
HPD03/20/2006SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD.
HPD03/20/2006SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF BED SPRING MISCELLANOUS ITEMS AT SCUTTLE TO ROOF.
HPD03/20/2006SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WALLS AND CEILINGS ALL ROOMS 3RD STY. APT.
HPD03/20/2006SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS UPPER SASHES 3RD STY. FRONT CENTER AND 3RD STY. REAR NORTH AND 2ND FROM NORTH
HPD12/30/2003SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CRACKED BRICK WORK NORTH EXTERIOR WALL ALL STORIES
HPD12/30/2003SECTION 27-2005 ADMIN. CODE: PROVIDE ELECTRICITY 3RD STY. APT. THROUGHOUT
DOB10/13/1997WORK WITHOUT A PERMIT. WORK NOTED: RENOVATION OF ENTIRE THIRD FLOOR, P SRTITIONS, FLOORING, FLOOR JOIST AND ROOF JOIST REMOVED AND REPLACED WITH NEW ROOF AND FLOOR JOIST REMEDY: OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION
ECB12/15/2011FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED ACTIVE ILLEGAL CONSTRUCTION WORK IN PROGRESS THRU-OUT PREMISES. AS A RESULT OF WORK THERE IS APPROX 40 CUBIC YARDS OF CONSNothing owed — awaiting certificate of correction
ECB06/17/1999WORK W/O A PERMIT. RENOVATION OF ENTIRE 3RD FL. PARTITIONS, FL JOISTS & ROOF REMOVED & REPLACED NEW ROOF. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB12/26/1997WORK WITHOUT A PERMIT WORK NOTED: RENOVATION OF ENTIRE THIRD FLOOR PARTITIONS, FLOOR JOIST AND ROOF JOIST REMOVED AND REPLACE WITH NEW ROOF AND FLOOR JOIST. REMEDY: OBTAIN PERMIT AND APPROVALS IF FEASIBLE OR RENothing owed — awaiting certificate of correction
ECB02/22/1996WORK WITHUT A PERMIT:WORK NOTED:REMOVAL AND REPLACEMENT OF ROOF JOIST,PARTITION WALLS AND CEILING AT 3RD FLOOR THRU-OUT.REMEDY:OBTAIN A PER-MIT.Nothing owed — awaiting certificate of correction
ECB09/23/1991FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS CRAKED AND BROKEN BRICK WORK AND MORDTAR JOINTS ON EXTERIOR EXPOSED WALL ADJACENTTO VACANT LOT. REMEDY:MAKE ALL NECESSARY REPAIRS TO THE SATISFACTIONNothing owed — awaiting certificate of correction
ECB01/08/1991FAILURE TO MAINTAIN. DEFECT IS: STAIRS LEADING TO THIRD STORY LOOSE, DEFECTIVE AND SUPPORTED BY TEMPORARY SHORING. @ FLOORING AND FLOOR JOIST MISSING AT FIRST STORY SOUTH EAST SECTION. FIRE RATED CELLAR CEILINGNothing owed — awaiting certificate of correction
ECB12/03/1990WORK WITHOUT A PERMIT. WORK NOTED:RENOVATING ENTIRE THIRD STORY,PARTITIONS FLOORING,FLOOR JOISTS AND ROOF JOIST REMOVED AND REPLACED WITH NEW ROOF AND FLOOR JOISTS(2) BOILER ROOM IS BEING CONSTRUCTED AT CELLAR.Nothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1,600 sf lot · 1.5 FAR built · Flood zone X500