← Back
Miscellaneous two family
19 STRONG PLACE
BROOKLYN · BIN 3003894
💬 Discuss this project
1840Year Built
3Stories
B9Building Class
R6Zoning
3,000 sfGross Floor Area
2Units
Miscellaneous two family · 3,050 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof5p · 3 filings · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar8p · 4 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAXTECH ELECTRICAL INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/01/2021$6.0M—— → —$2,000/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P.A. COLLINS PE508/18/2026
HANSEN ARCHTITECTURE + DESIGN109/16/2025
GILSANZ MURRAY STEFICEK LLP206/10/2025
GRT ARCHITECTS LLP206/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THINK CONSTRUCTION LLCGeneral Contractor1107/08/2026
AIRCON HTNG & COOLING CORGeneral Contractor707/08/2026
DYNAMIC BLUE WATER MECHPlumbing407/08/2026
BROOK LANDSCAPE INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H2 CONSULTING PE PC835109/16/2025
CROSSCHECK INSPECTION SER544606/10/2025
Building Lifecycle
All (107)Filed (10)Permit Issued (20)Signed Off (4)Inspection (3)Objection (40)Special Inspection (30)
09/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2026
Filed — Alteration
Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
B00587858-P2
08/13/2026
Signed off — Alteration
Modifications to HVAC system and installation of 2 ac units as per plans filed herewith. No change to use, egress or occupancy.
B00587838-I1
07/01/2026
Signed off — Alteration
New accessory utility garden structure: 36 sf enclosed utility/storage shed + 58 sf open covered porch. Not occupiable, not conditioned, complies. No change to use, egress, or occupancy of property building.
B01269554-I1
04/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/14/2026
Signed off — Alteration
Partial interior renovation of a two family dwelling unit with no enlargement or change to use, egress of occupancy.
B00587787-I1
03/25/2026
Signed off — Alteration
Structural modifications as per plans filed herewith. No change to use, egress or occupancy.
B00587830-I1
03/11/2026
Permit issued — Plumbing
B00587858-I1-PL
12/08/2025
Permit issued — General Construction
B01269554-I1-GC-CX
11/24/2025
Special inspection requirement — Sprayed fire-resistant materials
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Final
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
11/24/2025
Special inspection requirement — Metering
EUGENE BIFULCO
11/10/2025
Objection resolved — Addressed
09/16/2025
Filed — Alteration
New accessory utility garden structure: 36 sf enclosed utility/storage shed + 58 sf open covered porch. Not occupiable, not conditioned, complies. No change to use, egress, or occupancy of property building.
B01269554-I1
09/05/2025
Special inspection requirement — Subgrade Inspections
Harry Hong
09/02/2025
Special inspection requirement — Concrete - Cast-In-Place
Harry Hong
09/02/2025
Special inspection requirement — Structural Steel - Details
Harry Hong
09/02/2025
Special inspection requirement — Structural Steel - Welding
Harry Hong
08/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Heating Systems
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Final
EUGENE BIFULCO
08/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
08/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Metering
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
08/19/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Scope
08/11/2025
Special inspection requirement — Footing and Foundation
Harry Hong
08/11/2025
Special inspection requirement — Final
Harry Hong
08/05/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Cost
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Scope
06/17/2025
Objection raised — Energy
06/17/2025
Objection raised — Cost
06/17/2025
Objection raised — Scope
06/17/2025
Objection raised — Other
06/17/2025
Objection raised — Scope
06/17/2025
Objection raised — Structural
06/17/2025
Objection raised — Scope
06/10/2025
Filed — Alteration
Structural modifications as per plans filed herewith. No change to use, egress or occupancy.
B00587830-P1
06/09/2025
Filed — Alteration
Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
B00587858-P1
06/09/2025
Filed — Alteration
Modifications to HVAC system and installation of 2 ac units as per plans filed herewith. No change to use, egress or occupancy.
B00587838-P1
06/05/2025
Filed — Alteration
Partial interior renovation of a two family dwelling unit with no enlargement or change to use, egress of occupancy.
B00587787-P1
03/04/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP03/11/2026
DOB NOWGeneral ConstructionSigned-offBROOK LANDSCAPE12/08/2025
DOB NOWMechanical SystemsSigned-offAIRCON HTNG COOLING COR11/07/2024
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP10/22/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC09/12/2024
DOB NOWStructuralSigned-offTHINK CONSTRUCTION LLC09/12/2024
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP04/04/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC04/01/2024
DOB NOWStructuralSigned-offTHINK CONSTRUCTION LLC03/14/2024
DOB NOWMechanical SystemsSigned-offAIRCON HTNG COOLING COR01/31/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC03/20/2023
DOB NOWStructuralSigned-offTHINK CONSTRUCTION LLC03/20/2023
DOB NOWMechanical SystemsSigned-offAIRCON HTNG COOLING COR02/21/2023
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC02/15/2023
DOB NOWStructuralSigned-offTHINK CONSTRUCTION LLC02/14/2023
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP01/17/2023
DOB NOWMechanical SystemsSigned-offAIRCON HTNG COOLING COR06/17/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/09/2022
DOB NOWStructuralSigned-offTHINK CONSTRUCTION LLC04/25/2022
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC04/19/2022
BISPLISSUEDSTANLEY LEWIS CONTRACTING CORP04/14/1998
BISOTISSUEDINTERIOR ALTERATIONS INC.04/18/1996
BISOTISSUEDINTERIOR ALTERATIONS INC.12/07/1995
BISPLISSUEDAQUEDUCT PLUMBING AND HEATING12/06/1995
BISMHISSUEDALL H.V.A.C. SERVICE CO., INC.11/13/1995
BISOTISSUEDSAL MARRA CONSTRUCTION CORP.04/24/1995
1 project · most recent 06/09/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2025Signed-offAIRCON HTNG & COOLING CORAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM-U1 60,000 BTU · Condensing Unit ×10
Heating
Lochinvar KHB199N 199,900 BTU · Boiler ×5
Ventilation
Mitsubishi Electric PEFY-P08NMAU-E4 8,000 BTU · Vrf Indoor ×10
PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×10
PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×10
PFFY-P12NEMU-E 12,000 BTU · Vrf Indoor ×5
PFFY-P12NRMU-E 12,000 BTU · Vrf Indoor ×5
PFFY-P24NMAU-E 12,000 BTU · Vrf Indoor ×5
PKY-P12NLMU-E 12,000 BTU · Vrf Indoor ×5
PVFY-P12NAMU-E1 12,000 BTU · Vrf Indoor ×5
PVFY-P18NAMU-E1 18,000 BTU · Vrf Indoor ×5
Greenheck SP-B80 50 CFM · Exhaust Fan ×15
CSP-A110 100 CFM · Exhaust Fan ×5
CSP-A190 150 CFM · Exhaust Fan ×5
Fantech DBF-4-XL 150 CFM · Exhaust Fan ×5
Ducts & Piping
N/A n/a 1 BTU · Ductwork ×1
1 project · most recent 08/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Signed-offSUPER PLUMBERS CORPGas, Storm, Water/Sanitary
1 project · most recent 01/09/2023
General Wiring Lighting
FiledStatusContractorScope
01/09/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
1 project · most recent 09/16/2025
Steel Concrete Wood
FiledStatusContractorScope
09/16/2025Signed-offBROOK LANDSCAPE INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/24/2025Sprayed fire-resistant materialsEUGENE BIFULCOspecial
11/24/2025Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
11/24/2025Maintenance informationEUGENE BIFULCOenergy_progress
11/24/2025Fenestration air leakageEUGENE BIFULCOenergy_progress
11/24/2025FinalEUGENE BIFULCOprogress
11/24/2025Interior lighting powerEUGENE BIFULCOenergy_progress
11/24/2025MeteringEUGENE BIFULCOenergy_progress
09/05/2025Subgrade InspectionsHarry Hongspecial
09/02/2025Concrete - Cast-In-PlaceHarry Hongspecial
09/02/2025Structural Steel - DetailsHarry Hongspecial
09/02/2025Structural Steel - WeldingHarry Hongspecial
08/19/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/19/2025Mechanical SystemsEUGENE BIFULCOspecial
08/19/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/19/2025Heating SystemsEUGENE BIFULCOspecial
08/19/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/19/2025FinalEUGENE BIFULCOprogress
08/19/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/19/2025Interior lighting powerEUGENE BIFULCOenergy_progress
08/19/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
08/19/2025MeteringEUGENE BIFULCOenergy_progress
08/19/2025Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
08/19/2025Maintenance informationEUGENE BIFULCOenergy_progress
08/11/2025Footing and FoundationHarry Hongprogress
08/11/2025FinalHarry Hongprogress
Latest 25 of 32.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00587787-I1Request digital key ↗
08/31/2026B00587838-I1Request digital key ↗
08/21/2026B00587858-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/20/2026B00587858-P2Open ↗
08/13/2026B00587838-P1Open ↗
08/13/2026B01269554-I1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026B00587838-I1Open ↗
09/01/2026B00587838-I1Open ↗
09/01/2026B00587838-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00587838-P1Open ↗
08/31/2026B00587838-I1Open ↗
08/21/2026B00587858-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00587838-I1Open ↗
09/01/2026B00587838-I1Open ↗
09/01/2026B00587838-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00587838-I1Open ↗
08/21/2026B00587858-I1Open ↗
08/13/2026B00587830-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00587838-I1Open ↗
08/13/2026B00587787-I1Open ↗